Post Job Free
Sign in

Construction Manager

Location:
Jasaan, Calabarzon, Philippines
Posted:
August 07, 2018

Contact this candidate

Resume:

CURRICULLUM VITAE

Applied for Mechanical / Piping Construction

Superintendent or Supervisor

FERDINAND C. TEODOSIO Philippine address: Sitio 3 Barangay Jasaan Santa Cruz, Laguna 4009 Philippines

Mobile number: +639********* or +639*********

Email address: ***************@*****.*** / *********.********@*****.***

Passport nos. P4163088A ( Valid until year 2022 )

EXPERIENCE OF EXPERTISE

EPC, PMC, PMT, Direct & Indirect Supervision of Piping and Structural Fabrication and Field Erection, Welding, Inspection, Pipelines, Pressure Testing (Hydro testing, Pneumatic and Leak Testing), Inspection, System Pre-Commissioning (Water & Air Flushing, Steam Blowing, Pigging and System Completion (Inspection and Punch listing), Mechanical Equipment Installation in the Petrochemical, Oil and Gas projects.

PROFILE Skills / Qualifications

Extensive track records managing Steel Structural and Piping Construction and civil works activities within Oil & Gas or Petrochemical sector.

Managing and supervision of erection of mechanical equipment such as Static equipment including pressure vessels, shell and tube heat exchangers, vaporiser, vacuum storage tanks

Pumps including cryogenic and water pumps

With more or less 20 years minimum experience local and abroad for similar role. Excellent communication and presentation skills.

Considerable experience of supervising Construction staff to achieve effective construction.

Function and deal with supervision aspects of the project, as well as with technical & field aspects.

Diversified experience in the development, interpretation and implementation of policies, procedures and standards has been essential.

A technical background combined with fundamental and practical engineering knowledge with strong technical evaluation capabilities.

Extensive experience in onshore piping and mechanical supervision in fabrication and Field Construction and Pre-commissioning.

Familiar to interpret (P&ID) Piping and Instrument drawing, (PEFS) Piping Engineering Flow Scheme, Piping Isometric Drawing, (GAD) General Arrangement Drawing, Steel Structural Drawing, Can interpret civil work drawing and with knowledge in civil works activities. and (WPS) Welding Procedure and Specification

I have been exposed in various Piping and Steel Structural fabrication and field construction, welding, Pipelines, Pressure Testing (Hydro test and Pneumatic testing) Mechanical Equipment installation (( Rotating/Mechanical equipmet Tanks & Vessels ),, System Completion works and System pre-commissioning in the area of Petrochemical Plant, Oil and Gas projects.

Utilized as QC inspector for piping / steel structural and welding.

Provides engineering assistance to superintendents and managers, directs assigned personnel in meeting cost and time schedules, verifies materials, equipment and workmanship and assures result meet the design requirements

Familiar to work with different cultural society and maintaining good relationship with the contractors.

Proficient in documentation works, Review of document list and test package.

I am familiar in Mechanical / System Completion walk down inspection and punch listing and punch clearing works.

Flexible enough but strict if necessary. Hard working, fast learner and easy to go along with. Can work under pressure and minimum supervision.

With valid driver’s license in the Philippines, Saudi Arabia (Expiry date November 2019) and Qatar (Expiry date June 2015).

SEMINARS AND TRAINING

International Leadership and Management with SAFETY TRAINING CERTIFICATE OF ATTENDANCE of (9) nine modules (see below) which is accredited with INTERNATIONAL LEADERSHIP and MANAGEMENT (ILM) based in London U.K. held at Pearl GTL Training Center in Ras Laffan Industrial City of QATAR. Sponsored by KBR and Qatar Shell Pearl GTL.

1.PRODUCTIVITY THROUGH PLANNING and ORGANISING

2.CULTURAL AWARENESS

3.PRACTICAL LEADERSHIP

4.TRAIN the TRAINER

5.INTRODUCTION to HSSE and LEADERSHIP

6.QUALITY CONTROL

7.SUPERVISION WITHIN LIFE CRITICAL ACTIVITIES

8.INCIDENT and INJURY FREE SUPERVISOR SKILLS

9.INTRODUCTION TO FSI, TSTI and PTW

Computer Based Training in LIFTING and RIGGING AWARENESS COURSE.

Computer Based Training in HAZARD IDENTIFICATION COURSE.

Work Permit Receiver seminar held in SAUDI ARAMCO Jeddah, Saudi Arabia

Safety and Fire fighting seminar sponsored by ABV ROCK GROUP KB held in Riyadh, Saudi Arabia

Welding Upgrading Seminar sponsored by BF Corporation Inc.

Pipe welding course sponsored by Engineering Equipment Inc.

Welding course sponsored by Philippine government held in National Manpower Training Center.

WORKS EXPERIENCE

Company : Quingdao Municipal Construction Group

Position : Construction Foreman

Project : Manila Water Sewarage Pipeline Project

Date : June 2018 to July 2018

Country: Philippines

Direct supervision for all construction activities such as excavation 5 meters depth for buried RCP

Sewage pipeline, backfilling, asphalting and concreting works.

Reason for living is resigned.

Self Employed ( March 2016 – May 2018 )

Part time contractor for assembly of motorcycle side car.

Part time contractor for welding, fabrication and erection of steel structural beams and trusses for SL Aggritech commercial warehouse at Barangay Oogong Sta. Cruz, Laguna.

Contract from Sta. Cruz Water District 1 kilometer excavation and Pipe laying of water pipelines (HDPEclamp type)

Contract in residential houses for Installation of electrical wiring, plumbing, trusses, window and fench grills.

Company: Al Azmi Abdulhadi & Khalifa Abdulla Al Hawas Consulting Engineering Co. (AMCDE) Position: Engineer II (Supply to SADARA DOW Chemical co. )

Project: SADARA DOW CHEMICAL CO.

Date: May 31, 2015 to January 2016

Country: Jubail 2, Kingdom of Saudi Arabia

Duties and Responsibilities

Serve as member of the Project Management Team (PMT) as Construction Superintendent of Sadara Dow Chemical for WER-5 Off-plot SDL 39 Kilometers Pipeline and primary representative to manage, supervised and daily monitoring of piping fabrication and site erection of piping on existing pipe racks, erection of mechanical equipment, punch listing prior for system completion, monitoring of civil works activities, electrical works painting, insulation and cladding, pre-commissioning activities with the EPC contractor AYTB and sub-contractors.

Supervised and monitors the subcontractor’s works during execution to ensure full compliance with Sadara requirements. Ensure the construction contractors’ activities comply with all aspects of Health, Safety, Environment, and Security (HSES) policy, site regulations, permit to work procedures, and Client requirements.

Checks and ensure all the drawings issued to construction are updated, monitors the updates in engineering drawings, P&ID, piping lay out on site in cases of field changes

Daily coordination and monitor to contractor fabrication and field installation of piping, mechanical and civil structural related works and to construction manager and QC to discussed progress, quality, materials and manpower and all issue on site.

Managing and supervision all modification and repair works.

Site inspection to identify the problem that causes low productivity on piping erection. Discusses technical queries and problems on site with subcontractor’s supervisors.

Participate walk down inspection with contractors for system completion (punch listing) prior for pressure testing, pre-commissioning.

Ensure all punch list item was done correctly. Signed / closed out punch item.

Participate in construction and management meeting. Time to time reporting to construction manager.

Company: Al Azmi Abdulhadi & Khalifa Abdulla Al Hawas Consulting Engineering Co. (AMCDE)

Position: Discipline Engineer Specialist

Project: Yanbu Aramco Sinopec Refining Co. (YASREF)

Date: May 2014 to December 31, 2014

Country: Yanbu, Kingdom of Saudi Arabia

Duties and Responsibilities

Serve as member of the Project Management Team (PMT) as Construction Superintendent of YASREF to manage, supervise and daily monitoring of all activities such as piping fabrication and site piping and structural erection activities, system completion activities with the EPC contractor SK E&C and sub-contractors.

Managing and supervise multi discipline activities.

Ensure the construction contractors’ activities comply with all aspects of Health, Safety, Environment, and Security (HSES) policy, site regulations, permit to work procedures, and Client requirements. Conducts Tool Box Talk if necessary to all the people working inside the plant specially when there are hot Safety issues to emphasize. Participates in raising Stop cards to achieve a 100% IIF.

Supervise supply and discharge line underground RTR piping for cooling water and sewage line.

Managing and supervision of erection of mechanical equipment such as Static equipment including pressure vessels, shell and tube heat exchangers, cryogenic vaporiser, vacuum storage tanks

Pumps including cryogenic and water pumps.

Managing and supervise all repair and modification works.

Check and verify lifting equipments and lifting plan before erection activities starts.

Supervise and monitor pouring of drain pit and sewage line pit. Witnessed erection of concrete sewage tank and monitor installation of sewage submergible pumps.

Assist and witnessing mechanical equipment erection installation (heat exchanger, pumps, compressor and vessels) to ensure correct orientation and location.

Provide oversight of contractors, materials management/verification systems. Daily coordination to contractor construction manager and QC to discussed, progress, quality, materials and manpower and all issue on site.

Ensure compliance with specifications, procedures, and plans. Monitor workforce productivity and progress relative to schedule.

Managing the outstanding work through system inspection and punch-listing and supporting directing the teams of construction staff are the main focus, issuing the completion priorities to the teams and meeting regularly with the subcontractors in order to foresee or alleviate any problems.

Coordination to all departments for any discrepancies to resolves the problems. Participate walk down inspection with contractors for system completion (punch listing) prior for pressure testing, pre-commissioning, commissioning, pre start-up to system hand-over.

Ensure all punch list item was done correctly. Signed / closed out punch item prior for pressure testing and pre-commissioning.

Witnessing Pressure testing (Hydrotest & Pneumatic test), water flushing, air blowing, leak testing and line purging.

Monitor and witnessing pre-commissioning activities of contractor SPIE and signed out.

Participate in construction and management meeting. Reporting to senior construction lead engineer and project manager.

Company: CHIYODA PETROSTAR CO. LTD.

Project: SATORP / JERP Package 4 Delay Coker Unit

Position Construction Supervisor Mechanical Piping

Date: April 2013 to September 2013

Country: Jubail, Kingdom of Saudi Arabia

Duties and Responsibilities

Serve as member of the PMC as Construction Supervisor of Chiyoda Petro Star to manage, supervise and daily monitoring of all activities such as piping fabrication, site piping, equipment and structural erection activities, repair and modification activities, system completion activities with the EPC contractor NESMA & PARTNERS and sub-contractors.

Coordinates with the production on the fabrication and erection of piping works for underground and aboveground pipeline activities.

Checks and monitors isometric drawings before issuing to construction, updates engineering drawings, P&ID, piping lay out on site in cases of field changes, and prepares as built drawings at site if necessary

Supervised and monitors the subcontractor’s works during execution to ensure full compliance with the company requirements. Supervise repair and modification works.

Responsible for piping plans and schedule of works in fabrication, erection and inspection of piping spools such as carbon steel, stainless steel and FRP AND RTR pipes, and mechanical equipment erection. Coordination with material controller to ensure timely transfer of equipment and identify missing materials. Supervised installation and set-up to cold setting of all types of spring supports.

Site inspection to identify the problem that causes low productivity on piping erection. Discusses technical queries and problems on site with subcontractor’s supervisors.

Participate construction meetings, updates daily progress of activities and advice results of project status to the Construction Superintendent and Manager for follow up of works to prevent project delays. Prepare weekly progress reports to keep the management and client updated.

Company: MITSUI ENGINEERING & SHIPBUILDING CO. LTD.

Project: ExxonMobil / Singapore Parallel Train Olefin Recovery Project

Position: Piping Construction Supervisor

Date: July 2012 up to December 2012

Country: Jurong Island, Singapore

Duties and Responsibilities

Company primary representative as Piping Supervisors on-site to ensure the construction contractors activities comply with all aspects of Health, Safety, Environment, and Security (HSES) policy, site regulations, permit to work procedures, and Client requirements.

Supervised repair works and modification of piping and pipe supports. Line checking of pipe works prior for pressure testing. Witness hydro testing and signed-out if accepted.

Responsible for the HSES and quality aspects of the work within assigned areas and for ensuring construction contractors complete their work in accordance with the project schedule.

Ensure that construction contractors are fully conversant with all company standards and procedures. Supervised rectification works, punch clearing, bolt torque, re-instatement of pipe works after hydro testing. Provide on-site knowledge of project specific piping construction Monitor workforce progress as relative to schedule.

Daily coordination to sub-contractor construction manager and QC to discussed, progress, quality, materials and manpower.

Ensure that Piping construction contractors working within the discipline adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures, and Site Instructions.

Ensure that procedures and processes are understood and followed by the construction personnel. Interface with QA/QC personnel to address quality issues.

Line checking to ensure all piping works and pipe support installed correctly and as per designed and meet client standard. Verified all installed valves are correct type and correct flow direction including inspection of gaskets and stud bolts.

Participate in all construction coordination meeting. Direct reporting to Construction superintendent.

Company: Brunel Energy Qatar

Supply to Kellogg, Brown and Root International (MWKL)

Position: Construction Superintendent (Area C7-Pipeline Off plot & Jetty)

System Completion (Area C6 area – all utility line and product line)

Date: December 2008 to March 2011

Project: QATAR SHELL PEARL GAS TO LIQUID PROJECT

Country: Ras Laffan Industrial City, QATAR

Duties and Responsibilities ( Construction Superintendent )

KBR representative to 26 kilo meters pipeline as Construction Superintendent on-site to manage the all construction activities and to ensure the contractors comply with all aspects of Health, Safety, Environment, and Security (HSES) policy, site regulations, permit to work procedures, and Client requirements. Responsible for the HSES and quality aspects of the work within assigned areas and for ensuring construction contractors complete their work in accordance with the project schedule.

Responsible for the safety of all workers. Conducts Tool Box Talk if necessary to all the people working on site specially when there are hot Safety issues to emphasize. Stop works if necessary mostly if unsafe.

Responsible for civil and structural plans and schedule of works in pre-fabrication and erection of sleepers and pipe bridges along the corridors, culverts and road crossings. Witnessed and monitoring casting / pouring of all equipment foundation.

Responsible to all site activities erection of pipe loop to pipe racks and pipe laying on sleepers, welding activities and Mechanical equipment installation.

Monitoring sand blasting and painting of spools on painting yard.

Check and verification of all valves correct and flow orientation correct.

Ensure that construction contractors are fully conversant with all company standards and procedures.

Supervised and monitor mechanical equipment (skids and pumps ) erection / installation is in correct orientation.

Ensure that Piping construction contractors working within the discipline adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures, and Site Instructions.

Managing the outstanding work through system inspection and punch-listing and supporting directing the teams of construction staff are the main focus, issuing the completion priorities to the teams and meeting regularly with the subcontractors in order to foresee or alleviate any problems.

Provide the interface between the work face and the Construction Site Manager.

Review and monitor the availability of drawings, specifications, job instructions, material deliveries, and tools applicable to the particular discipline and area of work.

Ensure that procedures and processes are understood and followed by the construction personnel. Interface with QA/QC personnel to address quality issues /progress.

Participate on walk down inspection with EPC contractors, sub-contractors and client to ensure all piping works and pipe support installed correctly and as per designed and meet client standard.

Decision making and Provide on-site knowledge of project specific piping construction.

Responsible for monitoring the discipline and timekeeping of contractors’ staff and labor in a defined work area, identifying any disciplinary action required, and informing the relevant Construction manager.

Attends meetings, updates daily progress and advice results of project status to the Construction manager and Senior Project Manager for follow up of works to prevent project delays.

After pre-commissioning in area C7 I was transfer to area C6 for system completion of all utility and product line.

Duties and Responsibilities ( System Completion )

KBR representative as coordinator for System Completion.

Completion of systems within the utilities section of the project, pushing construction completion into the commissioning phase and towards handover.

Understanding the process priorities and being able to focus on key areas of construction completion to achieve a viable commissioning system, requires an overall involvement with all aspects of the project, each company department, discipline and all involved subcontractors are required to work together to focus primarily on process system completion.

Participate to all walk down inspection, punch listing and site inspection with client and contractors

Managing the outstanding work through system inspection and punch-listing and supporting directing the teams of construction staff are the main focus, issuing the completion priorities to the teams and meeting regularly with the subcontractors in order to foresee or alleviate any problems.

Ensure that Piping construction and mechanical equipment installation contractors working within the discipline adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures, and Site Instructions.

Ensure that procedures and processes are understood contractors and followed by the construction personnel.

Direct reporting to senior construction manager regarding daily walk down issue and status, punch clearing issue and punch item closed out status. Signed out all closed out items with the client.

Company: MITSUI ENGINEERING & SHIPBUILDING ARABIA LTD. Position: Piping Supervisor / Construction and Pre- Commissioning

Date: April 2007 – October 2008

Project: Rabigh Petrochemical PC2 Monomer Plant (RJV)

Mono Ethylene Glycol & Propylene Oxide Chemical Plant

Country: Rabigh, Saudi Arabia

Duties and Responsibilities

Company representative (MESAR) as Piping Supervisors to supervise, monitor and assist the contractor in fabrication and site construction (erection). Ensure that construction contractors are fully conversant with all company standards and procedures.

Responsible for the HSES and quality aspects of the work within assigned areas and for ensuring construction contractors complete their work in accordance with the project schedule.

Lead and closed monitoring EPC contractor (MMG) and sub-contractors in all activities such as piping and pipe supports fabrication, piping field installation, welding works, modification and rectification works, punch clearing, bolt torque, re-instatement of pipeline after hydro testing, supports installation. Inspection and checked all pipe spools cleaned before erection.

Supervision of erection of mechanical equipments such as Static equipment including pressure vessels, shell and tube heat exchangers, cryogenic vaporisers, vacuum storage tanks and Pumps including cryogenic and water pumps .

Ensure that Piping construction contractors working within the discipline adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures, and Site Instructions.

Ensure that procedures and processes are understood and followed by the construction personnel.

Responsible for piping plans and schedule of works in fabrication, erection and inspection of piping spools such as carbon steel, stainless steel and mechanical equipment installation.

Review and monitor the availability of drawings, specifications, job instructions, material deliveries, and tools applicable to the particular discipline and area of work.

Line checking to ensure all piping works and pipe support installed correctly and as per designed and meet client standard.

Responsible for re-instatement of pipeworks after pressure testing. Verified and checked all installed valves are correct type and correct flow direction including inspection of gaskets and stud bolts tightening.

Monitoring of pipe clashing to electrical /instrument and piping deviation/re-routing. Supervised installation and cold set-up of all types of spring supports.

Participate in all construction and department coordination meeting. Direct reporting to Construction superintendent. Reason for leaving is project completion.

Company: ABV ROCK GROUP KB SITE – 6 and 7

Project: Saudi Strategic Storage Project (SSSP)

Position: Construction Supervisor (Piping / Mechanical)

Date: February 2001 – December 2006

Country: Abha and Medina, Kingdom of Saudi Arabia

Duties and Responsibilities (Site-7 Medina)

Direct supervision of piping fabrication, welding activities, field installation of piping, mechanical equipments and pipe supports.

Checks and monitors isometric drawings before issuing to construction, updates engineering drawings, P&ID, piping lay out on site in cases of field changes, and prepares as built drawings at site if necessary.

Direct supervision of pipe laying and fusion welding underground piping HDPE for fire water line, potable water line and sewage line.

Assigned to manage and supervise pressure testing, flushing, pegging and nitrogen purging of tested line for preservation. Supervise re-instatement of pipe works after pressure testing.

Supervise outstanding punch list items on 117 kilometers pipeline from Madina (Site-7) to Yanbu Aramco refinery for Saudi Strategic Storage Project (SSSP).

Participate in construction coordination and commissioning meeting with all department and contractors.

Duties and Responsibilities (Site-6 Abha)

Direct Supervision & Closed Monitoring of all Piping and Mechanical/Rotating equipments Works Activities above ground and underground.

Site checking to identify the problem that causes low productivity on piping erection. Discusses technical queries and problems on site with all foremen and leadman.

Verify Updated Drawings per site condition if executed accordingly, especially the pipe supports if installed in accordance with the specification requirement.

Coordinate with Mechanical discipline supervisor for installation of Rotating and static Equipment to ensure that necessary report from civil team are achieved and documented for handover of foundation to Mechanical team.

Assigned to pipeline as representative of ABV ROCK GROUP KB to supervise, manage, monitoring sub-contractor (Metal Services) in pipe laying/welding and witness Hydro testing, Flushing and Pigging of 212 kilometer pipeline from Abha to Jizan Aramco bulk plant K.S.A

Monitoring of cable pulling, excavation and back filling, erection of pre-cast block valve pit and casting of anchor block.

Supervise / lead piping works, civil works activities, painting works and installation 2 booster shipping pumps inside Jizan Aramco bulk plant.

Company coordinator and permit receiver to Aramco. Ensuring contractors work within limitations set by PTW (Permit to Work) system. Responsible for the safety of all workers. Conducts Tool Box Talk if necessary to all the people working on site specially when there are hot Safety issues to emphasize. Stop works if necessary.

Attends construction coordination meetings, updates daily progress of activities and advice results of project status to the Construction Superintendent for follow up of works to prevent project delays. Prepare weekly progress reports to keep the management and client aware of the project.

Company: ABV ROCK GROUP KB SITE – 1

Project: Saudi Strategic Storage Project (SSSP)

Position: Steel Structural Assistant Supervisor

Date: May 1993 – December 1998

Country: Riyadh Kingdom of Saudi Arabia

Duties and Responsibilities

Direct supervision in fabrication of structural modules, piperacks and pipe supports.

Supervise fabrication and erection of temporary facilities. ( Warehouses, Offices and Fabrication shops )

Supervised field installation activities such as piping system, all type of valves, static equipment orientation horizontal and vertical alignment, rotating equipment such as pumps and skids.

Assigned to site to supervise erection of wall plates, structural module with 10 to 20 tons weight, erection/ assembled of pipe racks, erection of side wall supports, erection of permanent building facilities ( accommodation, power generation building, control rooms) and welding activities.

Erection of 39 meter length of vertical pipe sleeves, sanction and stripping pit.

Participate in daily/weekly and project management meeting in order to maintain smooth communications with other discipline.

Ensure all variation to design is technically authorized and approved by engineering and client prior for implementation. Check and ensure welding procedure and specification correct.

Implementation & Monitoring of Safety Requirements. Ensure that all works meet the project requirements and Client Standard.

Establishes, assigns, and adjusts work methods and procedures to meet schedules using knowledge of capacities and capabilities of personnel and equipment.

Company: BF CORPORATION INC. ( Steel Structural Fabrication / Jobsite)

Position: Supervisor Fabrication and Jobsite

Date: June 1990 – March 1993

Project: Rufino Tower (43 storey building all steel structural)

Palvig Building (15 storey building all steel structural)

Country: Makati City, Philippines

Duties and Responsibilities

Supervise fabricator, fitters and welders for fabrication of filler beams, girders and heavy wall columns for 43 storey all steel structural building Rufino Tower project and Plavig building.

Assigned to Rufino Tower jobsite in Makati to supervised erection, fit-up and welding of heavy wall beams and columns.

Checked and verify all welding procedures and specification (WPS) are correct as per project standards.

Ensured that HSE aspects is always followed to ensure compliance with project safety objectives throughout construction face of the project.

After completion in Rufino tower I was assigned to Palvig Building jobsite in Binondo Manila to supervised erection and welding of heavy wall beams and columns

Company: ENGINEERING EQUIPMENT INC. (Fabrication / Jobsite)

Position: Pipe and Steel Structural Welder

Date: May 1982 – December 1989

Project: Steel Fabrication Shop

Baguio Consolidated Building (all Steel Structural)

NIA Magat Dam Steel Gate / Philippine National Oil Company

During my college I was a self supporting student. I was trained welding to EEI. After my training and passed my welding test as plate welder, I worked at EEI Steel Fabrication Division

Assist to fitter and full welding of beams, columns, boiler ducts, tanks and all structural steel for all EEI projects

PERSONAL INFORMATION

Birthdate: June 03, 1962

Place of Birth: Sta. Cruz, Laguna PHILIPPINES

Nationality: Filipino

Sex: Male

Educational: B.S. Mechanical Engineering

Marital Status: Married

Religion: Christian

CHARACTER REFERENCES

Mr. Joe Riddle Mr. Gordon Brown

Construction manager General Superintendent

Sadara SDL Off-plot Pipeline Sadara SDL Off-plot Pipeline

Sadara Dow Chemical Co. Project Sadara Dow Chemical Co. Project

Jubail 2 Industrial City Jubail 2 Industrial City

Jubail Saudi Arabia Jubail Saudi Arabia

Email ad: ***.******@******.*** Email ad: ******.*****@******.***

Mr. Rashed H. Al Rashed Mr. Mohammad A. Al Mohdar

Project Manager Senior Lead Engineer

EPC-2 Crude Package EPC-2 Crude Package

Yanbu Aramco Sinopec Refining Co.(YASREF) Yanbu Aramco Sinopec Refining