Post Job Free

Resume

Sign in

Engineer Engineering

Location:
San Jose, CA
Salary:
80000
Posted:
August 03, 2018

Contact this candidate

Resume:

KEVIN Q. BUI

**** ******* ***.

San Jose CA *****

Cell: 408-***-****

Home: 408-***-****

ac6jdj@r.postjobfree.com

OBJECTIVE: Seeking a challenging Electronic Mechanical Engineering Technician position with a clear path for advancement where my knowledge, and B.S. degree could be utilized, and serve in the Mechanical/ Electronic in manufacturing area. With more than 15 years experienced in manufacturing field, I am very confident to achieve the given assignment with high level of responsibility, integrity, and delivery the high quality products on time. I am a team player, high quality player, I am a fast learner.

SKILL: Strong knowledge, and experienced: Ethernet, Knowledge in Unix, C language, MS-DOS, WINDOWS XP, 7, 8,10, Excel, Word, Oracle. Expertise on various test equipment as Tektronic scopes, HP analyzers, DVM, ICT testers, Applied Materials PVD wafer process in Multi-chamber Systems, KLA-Tencor Wafer Inspection Station series 3xx, Glide, and Certified Phase Metrics series MC900, MC950. Software application: World Classes Trained: Network LAN/WAN operation Systems, Semiconductors, ESD, FDA, FDB, ISO 9001, Safety.

WORK HISTORY:

Sr, Automation Engineering Technician, Cepheid Inc. August/2017 - Present: Built Sub assembly Mechanical parts, Frames, window Doors, covered Frames for Automation Machines, Intsall Pneumatic, and Pressure lines for pull and push mechanical Parts. Crimp, and installed, and designed route for the AC/DC Electrical wires/cables Install Electrical wires, cables DeviceNets, Sensors, DC/AC power cables by Follow the Schematic. Installed and set up Automation Machine for Final Test, also troubleshooting Automation Systems down to wires, cables, and devices.

Sr. System Technician, Kateeva Inc. May/2015 – March/2017: Build sub-Assembly PV, PA tables, build Printer packs, Printer heads, routing Pneumatic lines, in/out systems, Electrical wires thru out AC cabinet, Motion Cabinet, Water bumps facility racks, Chillers for UV chambers, and printer, grippers. Leak check UV, and Printer as well Also, do final test on I/O thru out system before ship. Calibration the print packs on 1024 nozzles on each heads, Generated Waveforms, Jetting, Calibrate, or Alignment on RDI (Remote Drop Inspection).

SR. Engineering Technician, AixTron Inc. 02/2015 – May/2015: Build sub-Assembly Sensor Trees, Pump stacks, Chamber Cylinders, Heater Plates, Gas Panel Box, Run Pneumatic lines, Water Hoses, Exhaust Pipes, Gas Lines. Routing all Electrical cables Pneumatic lines, Gate valves, Throttle valves. Pump down to detect Leak (leak check). Functional test gas lines, sensors, Pneumatic valves, Servers Communication lines, Teaching Robots pick up cassettes.

Pilot Line Engineering Technician, Applied Material Corp. 10/2013 – 01/2015: Integrated and testing CMP Redwood Split 300mm Cleaners/ Polishers Build sub-assembly Gas Boxes, Mega-sonic tanks, Brush tanks, VD dryers Plumbing, Pneumatic valves, and Flow meter and plumbing for LDM drawers…Also installed Wet Robots, Driver boxes, AC /DC power Supplies boxes, installed and routing all electronic AC/DC cables, and all pneumatic lines to Mega-sonic tanks, brushes tanks, VD Dryers. Also final test all sensors related to Wet Robot access. Teach points for the Wet Robots. Used SRT software to keep track shipped all the accessory parts come with the Cleaner.

Maintenance and Support Engineering Technician, Coherent Inc. 2007 – 2012: Maintenance and Support Semiconductor division. Support vacuum pump for the coating CHA system in yellow room. Support 1 mil, 5 mil wire bonders in the packaging area: Repair bonder machines down to component level. Help and support Design Engineer Department to re-design and modified manifolds with better water flow. Re-design new Burning Rack water pipe to prevent from over heat.

Test Engineering, KLA-Tencor Inc. 2006 – 2007: Installation systems, testing and troubleshooting systems down to the component level. Teaching and program Robots to handling the wafer from cassettes. Teaching Singapore employees install and testing during the outsource transition to Singapore.

Field Service Engineer, R2 Technology Inc. 2002 – 2005: Installation R2 Software into NEC Computer Processors. Testing & Troubleshooting Processors, R2Technology Systems, and Display Viewers as the mammogram for earlier detect breast cancer systems, down to component level, Keep track all legal document with extremely caution, and always follow Rules & Regulations from FDA, FDB, and also must comply with ISO 9001.Utilized Linux/Unix software for all these Systems. Know how to keep track Material transfer from one job to the other with 100% legal document within FDA approval.

Final Test Engineering Technician, Applied Material Corp. 1999 - 2001 Testing, and troubleshooting CMP Mirra, Polisher Mainframes down to component level. Kept records, and document each shipped systems to keep track high roller defected systems for Analysis, and Improvement. Maintenance Support Tech. Lead,

Western Digital Corp. 1997- 1999 Maintenance, and support media products via unified Glide/Certified MC900, MC950 Phase Metrics models, Sankyo Robots for each Glide/Certified test cells. Assign Technicians to test cell, and frequently check, and verify yield target at 90% for Glide testers. Responsible for debug on hard down testers, Convert testers, and robots test files, also teach points the robots.

Associate Test Engineer, KLA-Tencor Corp. 1995 - 1997 Maintenance, and services the KLA systems series 3XX wafer inspection stations. Testing and troubleshooting the Image Computers, Inspection Stations, Data base for engineering department via clean room environment.

EDUCATION:

SAN JOSE STATE UNIVERSITY, SAN JOSE,

B.S. degree in Computer Electronics Industrial Technology

MISSION COLLEGE, SANTA CLARA, CA

A.S. degree in Electronics



Contact this candidate