Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Kolkata, West Bengal, India
Salary:
55000
Posted:
August 01, 2018

Contact this candidate

Resume:

Resume

DEBABRATA BISWAS.

CE – ** / *, Rabindranagar, P.O - Bartola

P.S- Rabindra Nagar, Kolkata - 700 018,

Phone - (033) 2491- 9527, 098********,

E-mail – ac6ick@r.postjobfree.com

Career Motto

To take up challenging managerial assignment in an Organization where my skill set can be utilized and expanded for the growth of the organization.

Skill Set

MHS PACKAGE OF DHAMRA PORT EXPANSION PROJECT

(BLUK-BERTH 3 & 3A) .

2x660 MW IB THERMAL POWER STATION .

3.0 MTPA INTEGRATED CEMENT PLANT.

6x150 MW Thermal Power Plant (CHP Unit).

2.5 Mpt Integrated Steel Plant (RMH Unit).

4x135 MW Thermal Power Plant (CHP Unit).

Chemical Plant (Nano Ceramic Battery material).

Multistoried Residential Building Project.

Computer operation:

Operating System- Win XP, Windows 10

Package – Auto-Cad 2017’, Auto Cad Map, Office 2007’, MS Project, GIS Software,REBAR CAD,

Technical Qualification

Passed Diploma ( Civil Engineering) from Jnan Chandra Ghosh Polytechnic under “West Bengal State Council of Technical Education”, in 1st Division with an aggregate of 66% in 1998. Educational Qualification

Passed ‘Madhyamik’ in 1st Division under West Bengal Board of Secondary Education in 1990.

Passed ‘Higher Secondary’ in 2nd Division under West Bengal Council of Higher Secondary Education in 1992.

Training Experience & Project Work

Presently working in SIMPLEX INFRASTRUCTURE LIMITED as Sr.Construction Engineer (Gr-II) as Execution In-charge of Civil Structure including finishing work and reinforcement utilization. Job Responsibility- Execution In-charge including site execution, Quantity Survey and Bill Certification of Sub contractor for MHS Package, Reinforcement Utilization and site management with Latest REBAR CAD software for both MHS and JETTY package

(approx Qty-14600 MT).

Period- March 2015 . To Till Date .

In DCPL as Construction Engineer (Civil) as consultant for Construction of 2x 660 MW IB THERMAL POWER STATION of OPGC- AES at Banharpalli, Jharsuguda.

Job Responsibility- PMC including Quantity Survey and Bill Certification on behalf of Client for RCC BOP Package, RCC Chimney 269 Mt Height.

Period- October 2014. To February 2015.

In DCPL as Construction Engineer (Civil) for Construction of 3.0 MTPA INTEGRATED CEMENT PLANT of ORIENT CEMENT LIMITED at CHITTAPUR, KARNATAKA.

(Cost of Project- 378.00 Cr. Out of 1200.30 Cr.)



Contact this candidate