Post Job Free
Sign in

Manager Supply Chain

Location:
Florence, KY
Posted:
August 01, 2018

Contact this candidate

Resume:

Kyle S. Wanick, MBA, CPIM

Union, KY

***********@*****.***

859-***-****

Professional Profile

Eighteen years in Supply Chain Management and Operations in various positions with increasing responsibility to include: Supply Chain Manager, Production Planner, Material Planner, Buyer, Master Scheduler. Experience managing direct reports in high volume manufacturing/assembly and low volume high mix. Industries include: Plastics, Automotive Aftermarket, Flavor Creation, Automotive, Aerospace, and Electronics.

Education

Northern Kentucky University, Alexandria, Kentucky, USA July 2014

Masters Business Administration, Summa cum Laude

Colorado State University, Fort Collins, Colorado USA May 1997

Bachelor of Science – Industrial Technology and Management

Professional Experience

Amcor Rigid Plastics Hazelwood, MO 2/2018 – 6/2018

Materials Manager

Manage all functions of both internal and outside warehouse, including receiving, material handling, shuttling, and customer shipments.

Lead a team of 3 salaried – Production Planner, Warehouse Supervisor, Cycle Count Lead & 17 indirect FTE

Brought 3rd part warehousing from 2 different companies back in house into a new 215,000 sq ft facility, expanded the shipping team by 110% in the process

Developed Standard work and model efficiency for optimal staffing

Manage the overall production planning/scheduling function for the facility, in conjunction with the operations group

Work with Cross-Functional Team on several projects to bring in 4 new silos, 4 new machines, add a shuttle service to a new 215,000 sq ft warehouse facility while maintaining uninterrupted product flow.

Graham Packaging Florence, KY 4/2017 – 11/2017

Supply Chain Manager

Responsible for Planning, Purchasing, Forecasting, and Warehouse functions on $100M SAP based site [12 injection machines, 5 bottle lines, and 2 warehouses over 500,000 sq ft].

Lead a team of 2 salaried – Scheduler and Warehouse Supervisor and 12 indirect FTE

94% on time – in Full order fulfillment.

Coordinated re-qualifications at site level for shifting products to different sites as well as alternative resin production and qualifications.

Directly Scheduled and created labor forecast/crew model while working with corporate, 4 interplant sites, and Maintenance for extensive ongoing projects.

With a spend budget of $30M, planned, purchased and optimized inventory levels to lowest levels possible

Established Kanban for pack supplies [$50,000/mo]

Established cycle count plan to monitor FIFO for excel based Warehouse Management.

ITT – Koni Erlanger, KY 11/2014 – 3/2017

Supply Chain Manager

Lead a team of 4 FTE in Supply Chain and Shipping Departments in a SAP based environment

Reduce monthly backlog year or year by 11%

Reduced monthly inventory over 20% y/y for increase in operating cash flow of 5.5% while establishing effective safety stock program.

Lead box redesign initiative from design through prototype development and into production for new product launch.

Coordinated all activity SKU activity from part setup, through ordering, tracking, receiving and shipping.

Lead SIOP (Sales, Inventory, Operating Plan) for site

Coordinated/evaluated freight RFQ for 120 sea containers for import from 4 separate countries

Responsible for Bills of Material (BOM) and routings for site.

Negotiate directly with vendors for payment terms, delivery standards, and pricing.

Reduced utilities consumption as part of green initiative to reduce electricity involving soliciting bids, and coordinating contractors for the removal and replacement of 80% of the lighting.

Increased utilization of site warehouse to allow for US footprint of sister division. Involving setting up new virtual warehouse and training to replicate the overseas operation.

WILD Flavors, Inc Erlanger, KY 5/2005 – 11/2014

Production Planner – Team Lead

Responsible for planning production for 9 different functional areas, including USDA inspected operational departments – over $80M annually

Lead subcontract manufacturing toll blended products process, $15M spend annually

Establish and maintain Item Master file attributes for safety stock levels, master-planned items utilizing AS400/Mapics. Work with Demand Management to plan for beginning/end of life product cycles

Resolve inventory discrepancies through tracking of material from receiving, to storage, to consumption.

Collaborate and actively coordinate with Demand Planning any flavor migrations to new product lines

Manage Production Capacity for standard lead time order as well as Master Planned items

Coordinate with QC and industry leading chemist for first to market technology

Exceed customer delivery fulfillment standard of 95%

ArvinMeritor Carrollton, KY 1/2003-3/2005

Sr. Master Scheduler / Buyer

Utilizing QAD.Mfg Pro Planned, ordered, tracked deliveries, verified purchases and tracked inventory for accuracy in Union environment

Analyze freight inbound/outbound demand patterns. Saved 200,000 through mixed load optimization, destination consolidation and avoiding unnecessary expedite costs.

Utilizing Six sigma principles, increased On-time delivery for assigned commodities by 20% through re-assignment of freight transportation after measuring and isolating cause variation.

Through Lean manufacturing processes, increased thru put by 8% by redistributing workloads for optimized production

Saved company an average of $75,000/year through re-sourcing purchased material. Equivalent to $3.5M Sales (Site sales $95M)

Achieved target inventory goals and consistently exceeded goals by 10-15%

Increased Inventory turns for site from 23 to 31 and for commodity specific from 22 to 35

Redeveloped point of use vs. warehousing of material with a potential to increase productivity plant-wide by 4% and reduce expedited shipments by 9%

Dell Computer Lebanon, TN 8/1999-8/2002

Sr. Material Planner

Coordinated material flow for all speakers, printers, monitors and computer chassis from 3rd party logistics warehouse (over 35 semis per day) in a non-union environment.

Through Lean manufacturing Refined material distribution process to reduce amount of vendor deliveries while reducing on-hand inventory by 15%

Proficient with WTCS, a MRP/ERP Legacy system

ISO experience includes working with QA department to generate job descriptions and processes.

Coordinated part supply and PO issues with buyers in TX

Developed training for other planners

Worked on team to streamline ordering process from a manual process to automated system

Production Supervisor

Supervised 40-75 hourly personnel In 2 functional areas (Kitting and Assembly)

Mentored, developed and assist in the promotion of 20 direct employees to positions of increasing responsibility

Designated as prototype assembly line based on superior leadership in quality and productivity

Consistently performed in the top 2 of 10 manufacturing lines, quarter over quarter

Supervised line with lowest turnover for 2 straight years

Scheduler

Trained department in master scheduling including 2 replacements

Developed new standards for site scheduler

Part of the team to develop end of quarter planning sequence and standards

Targeted for promotion after obtaining management experience

Boeing Corp Everett, WA 8/1997-4/1999

Industrial Engineer

Responsible for work flow of 75 hourly mechanics in a union environment; re-assigning job tasks as necessary

Team lead for engineering study of alternative manufacturing method for floor grid assembly

Worked with Quality and Design engineering to resolve manufacturing/design conflicts

Maintained and restructured critical path of manufacturing process as tack time fluctuated month over month

Certifications

APICS The Association for Operations Management

Certified in Production and Inventory Management (CPIM), certified April 2012

Member since May 2004

Systems background includes: SAP, AS/400 Mapics, QAD/Mfg Pro, and other Legacy Systems. Fluent in Microsoft Office (Word, Excel, and Outlook)



Contact this candidate