ROBERTO M. VILLALUZ
Rigging & Lifting Supervisor Mob: # +965******** (Kuwait)
Email add: ***************@*****.*** +639******* (Philippines) Summary of Experience:
Self-motivated and well experienced in supervisory and team leadership in heavy construction environment in oil & gas industry (onshore-offshore), petrochemical, infrastructures and etc. with a minimum 22 years of experience in lifting & rigging in field including at least 15 years of supervisory experience. Training in rigging, safety and offshore
(HUET/BOSIET/Firefighting).
Skills:
Good knowledge of crane specifications.
Load charts and SWL (safe working load) / WLL (working load limit) various Types of lifting equipment and lifting accessories and their limitations.
Inspection of crane and other construction equipment and rigging tackle to required standards of safety and quality.
Ability to prepare preliminary lifting plans.
Supervised / monitors multi-crane lifts & heavy lifts.
Participate in training and development of subordinates / crane operators and riggers.
Computer literature: Microsoft office (outlook, pdf, word, excel, powerpoint) NAVIS work, basic Auto Cad Professional Record:
TR - Tecnicas Reunidas Rigging & Lifting Supervisor May 07-2017 - Present Kuwait
KNPC MAA Refinery Gt-5 Project Kuwait (EPC)
Client: Wood (Former Amec)
Duties:
Worked as Construction Supervisor (Heavylift /Rigging) and Permit Executor.
Supervise and monitor all lifting/rigging activity at the site, ensuring all aspects of performance and work are in compliance with project specifications and completed within planned time and budget constraints.
assist heavy lift subcontractor (ale) for documentation (PTW, RP & tackles certification)
Monitor and supervised SK-190 crane (4200 t cap.) for assembly / disassembly and installation of huge equipment (1220 t max.).
signed daily rigging plan & permit executor for all crane works routine & non routine lifts (critical simple, complicated & complex)
NCOC North Caspian Oil Company (Offshore) Rigging & Lifting Supervisor June-2016 - Sept 2016 (Short Term Project) PMC Kazakhstan A Island Kashagan Pipe Line Project Offshore Atyrau Kazakhstan Duties:
Worked in NCOC as Lifting Superintendent in A-Island Kashagan Pipeline Project Kazakhstan Monitor and tracks daily progress and work completed, comparing planned to actual and takes appropriate mitigating action to ensure compliance with the plan, based on knowledge of available manpower, equipment, materials, and in cooperation with planning engineer and project management.
Responsible for all lifting (Routine and Non Routine) and rigging activities at site .Ensures the competence of all personnel involved in the activity is commensurate With their designated tasks
Ensures a risk assessment is in place that is suitable and sufficient and a TBT is conducted where non-routine lifting activities are to be undertaken and Coordinates, controls the lifting activity Petrofac Emirates LLC (Offshore) Construction Supervisor Sept 2015 – May 2016 UAE
ZADCO Uz750 Upper Zakum Project (EPC)
West, South & North Island Abu Dhabi UAE
Client: Amec Fw
Duties:
Worked in Zadco UZ750 Project west island as Construction Supervisor (Rigging) and PTW Area Authority signatory for all lifting activity
Ensures that the workers understand and implement the work plan, by explaining and engaging in pro-active communication with the crews.
Prepared two week and one week look-ahead plans for the heavy lifting works of the project, in close liaison with construction, planning and other departments and disciplines.
Assist and support ALE (Heavy Lift) for load-in load-out of all heavy modules using SPMT
Ensure that the requirements of lifting operation guidelines and procedures are adhere to all lifting activity and that the works are carried out in accordance with all safety requirements
Ensure that all personnel involved with any lifting operations on the site have proper training and assessed as competent to work
Review and evaluate all Subcontractors Lifting plan / Rigging study (heavy lift /critical lift).
Observed and Monitor all lifting activities including heavy lift / critical lift, and ensuring the Method Statement, JSA and Risk Assessment are adhere and implemented.
Jacobs Zate Rigging & Lifting Supervisor
Dec-2013 - Apr-2015 Saudi Arabia
SADARA Polyethylene Train 1, 2 &4 Projects (EPCM)
Jubail Saudi Arabia
Client: Dow & Saudi Aramco
Duties:
Assigned in SADARA (EPCM) as Rigging Specialist (Rigging In-charge) in Polyethylene Project Train 1, 2& 4
Review and evaluate all Subcontractors Lifting plan / Rigging study (heavy lift /critical lift).
Observed and Monitor all lifting activities including heavy lift / critical lift, and ensuring the Method Statement, JSA and Risk Assessment are adhere and implemented.
Conduct rigging workshop for Riggers every quarter of the year
Ensure all equipment required for the rigging activity are in line with Method Statement and are certified as per the specifications as have been agreed with the client.
Ensuring everyone involve in lifting operations/activity understand their responsibilities, assigned duties and the associated hazard
Coaching and demonstrate the correct rigging and lifting techniques. Petrofac Intl. Ltd. Rigging & Lifting Supervisor
Mar 2010 - Nov 2013 Turkmenistan & UAE
South Yoloten Development Project (EPCM)
Turkmenistan
Client: Turkmengaz
Laggan Tormore Project (Epc)
Hamriyah Sharjahuae
Client: Total
Duties:
Worked in PETROFAC (EPC & EPCM) LagganTormore project in Hamriyah FZE Sharjah UAE and South Yoloten Gas Project in Turkmenistan as Rigging & Lifting Supervisor and Equipment Inspector.
Directly oversee the work being performed by a Crane and the associated rigging crew
Conduct initial inspection for all mobilized Equipment’s and Cranes from Subcontractors and assess their ability to function safely and correctly in accordance with the original design and manufacture criteria.
Perform initial and periodic inspections of hoisting and rigging equipment.
Provide guidance and assistance to all Subcontractors Rigger and other site personnel in safe rigging practices.
Reviewed and comments approved Lift Data Sheets for heavy lifting and basic, routine and non-routine lifts where required.
Obtain from subcontractors their risk assessment, method statement for assembly / disassembly of Cranes, lifting plan and HSSE plan.
Monitor and oversee all lifting activities for the daily basis (Module assembly) and /report all near misses/ mishap occur on site.
Ensure all Equipment’s and Pipes are secured lashing / sea fastening before load out.
Equipment planning, erection sequencing and methodologies reviewed accordingly KBR – Kellogg Brown & Root Rigging & Lifting Supervisor Feb 2008 - Feb 2010 Saudi Arabia
Saudi Kayan Cracker Project (EPC)
Jubail Saudi Arabia.
Client: Saudi Kayan
Duties:
Worked in KBR as Rigging Supervisor and Construction Equipment Inspector at Saudi Kayan Project
Conduct initial inspections for all mobilized construction equipment on sites such as Cranes, Forklift, Man lift, Boom Truck, Excavator (Crawler Type and JCB) Loader, Grader, and Trucks etc.
Monitoring and auditing Cranes and documents, certification checks.
Review the rigging study and method statement submitted by all contractors.
Present during the entire lift operation especially for heavy lifting and critical lift.
Perform initial and periodic inspections of hoisting and rigging equipment.
Ensure that work method statements, ‘Job Safety Analysis and Risk Assessments’ have been carried out as required by the nature of the lifting operation.
GIS - Grand Isle Shipyard Rigging Foreman
Dec 2005 - Jun 2007 USA
Mars Tlp & St-52 Platform Project for [Shell & Chevron] In Gulf of Mexico Duties:
Worked in Gulf of Mexico at Offshore as Rigging in charge in a various platform Reconstruct and revamp platform, Rig, Pipe, Valve, Structure etc., Co-ordinate day-to-day works to Riggers and assisting them for any rigging / lifting activities.
Engaged in the offloading / loading of cargo/materials and supplies from boat to jack up barge either platform.
Monitoring all safety related matters involving safety drill.
Prepare safety & rigging gadgets for our lifting jobs such as shackles, slings, & other related lifting equipment for incoming and outgoing materials used in our platform.
Co-operate with line management in the prevention of all work related incidents / accidents and promote environmental good practices, by adopting the appropriate behaviors.
Engaging in JSA /JHA and presenting toolbox meeting on a weekly basis and prestart toolbox talk on daily basis and ensure all work is progressed in a safe manner.
EEI Corporation Rigging Foreman
Mar 2004 - Dec 2004 Philippines
Ctci Goht -3 / Lvn Project (Contractor)
Petron Bataan Refinery Limay Bataan Philippines
Client: CTCI
Duties:
Worked in EEI as Rigging Foreman at Petron Bataan Refinery (Hometown)
Responsible for the safe execution of rigging activities in support of the Construction work programs
Inspection of all rigging hardware such as wire rope, web sling, spreader bar, shackles, chain blocks, body harness.
Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure the safety of workers and material handling, using the hand signal or radio.
Determine the actual position of Crane involving the degree and angle of the boom. MMG Rigging Foreman
Aug 1999 - Dec 2003 Saudi Arabia
JUPC K-035 Project (Contractor)
Client: Flour Arabia
Kemya Olefins Project (Contractor)
Client: Lummus Alireza
Jubai Saudi Arabia
Duties:
Worked in MMG as Rigging Foreman in two different Projects, Responsible for execution the required work activities within the area for the attainment of project safety and project development.
Train subordinates in the correct method of doing their works.
Prepare JSA (Job Safety Analysis), method statement and risk assessments during lifting and rigging operations.
Explain and enforce company rules and regulation, quantity and safety requirements, and train subordinates in the correct method of doing their work.
Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure the safety of workers and material handling, using the hand signal or radio.
Prepare safety & rigging gadgets for our lifting jobs such as shackles, slings, & other related lifting equipment for incoming and outgoing materials used in our platform.
Performs daily accomplishment Reports and details of works. EEI Corporation Rigging Foreman
June 1998 - Dec 1998 Philippines
Pbr A&B Expansion Project (Contractor)
Petron Refinery Bataan Philippines
Client: Daelim
Duties:
Worked in EEI as Rigging Foreman at Petron Bataan Refinery (Hometown)
Monitor and report daily work accomplishment and corresponding person-hour and equipment work hour utilized.
Maintain proper signals in actual lifting engaged in hoisting and moving loads to ensure safety of workers and material handling, using a hand signal or radio.
Ensure that cranes and rigging equipment inspections are current before equipment put into operation.
Ensure that lift planning is complete and reviews the lift with all participating personnel before the lift begins. Mc Connell Dowell Rigger
Jan 1998 - Apr 1998 Bangladesh
Sangu Field Gas Plant Project
Chittagong Bangladesh
Client: Brown & Root
Duties:
Worked as Rigger in Sangu Project
Attain daily safety toolbox and obey the instruction of superior for daily activities.
Erection of pipe spool to pipe rack and Assist to the piping group for alignment & fit-up of pipe spool.
Prepare rigging tools for heavy lifting activities.
Rig-up all heavy equipment’s such as Vessel, Turbine, Drum, Exchanger, etc.
Worked at the elevated area with full body harness and 100% tied off. CCC – Consolidated Contractors Company Charge Hand Rigger Jan 1997 –Dec 1997 Saudi Arabia
Ibn Rushd Pta & Aromatic Project (Contractor)
Client: Yanpet
Duties:
Worked as Lead Rigger in IBN Rushd (Yanpet) Project
Attain daily safety toolbox talks and maintain good housekeeping.
Engaged and lead to riggers for loading and offloading of fabricated pipe, Spool, random pipe, Structural materials. Equipment etc. from Fabrication Shop, yard to the job site. Responsible and operate overhead crane for lifting of pipe spool from Fabrication shop.
Prepare rigging tools for heavy lifting activities. Daelim Rigger
Aug 1996-Nov 1996 Taiwan
Formoza Aromatic Plant Project
Client: Formoza
Duties:
Worked in Daelim Co. as Rigger at Formoza Project Taiwan
Attain daily safety toolbox and obey the instruction of Superior for daily activities, Erection of pipe spool to pipe rack and Assist to the piping group for alignment & fit-up of pipe spool.
Lift and hauled Equipment materials, and piping materials from lay down yard thru job site.
Inspect all rigging gears before and after use.
Obey safety rules and regulations.
Barricade the swing radius of the Crane counterweight, and post “Danger-Keep out sign”
Communicate in daily bases to Crane Operators, Lift Supervisors and co-workers to function as a member of a team. Al-Suwaidi Rigger
Nov 1994 - June 1996 Saudi Arabia
Maphar Sabayek Project (Hadeed Steel Plant)
Client: Sabic
Duties:
Worked in Al-Suwaidi Co. as Rigger and Assistant DCC
Filing all incoming documents and segregates all superseded documents.
Attain daily safety toolbox and obey the instruction of superior for daily activities, Erection of pipe spool to pipe rack and Assist to the piping group for alignment & fit-up of pipe spool.
Lift and hauled Equipment materials, and piping materials from lay down yard thru jobsite.
Prepare and Rig-up heavy load such as Vessel, Drum, Reactor, etc.
Barricade the swing radius of the Crane counterweight, and post “Danger-Keep out sign” Hyundai Eng’g Rigger
Sept 1993 - Sept 1994 Malaysia
MLNG Dua Plant Project
Client: Kellog
Duties:
Worked in Hyundai Eng’g. As Rigger at MLNG Project East Malaysia
Communicate in daily bases to Crane Operators, Supervisors and coworkers to function as a member of a team.
Assign as Banks Man / Rigger for the crane and assist Piping group for erection and installation of pipe and Mechanical Equipment’s.
Assist to Piping group for pulling chain block / come along for fit-up of spool, and alignment.
Attain daily safety toolbox and obey the instruction of superior for daily activities,
Maintain good housekeeping.
Barricade the swing radius of the Crane counterweight, and post “Danger-Keep out sign”
Perform inspection on the rigging gear such as Wire rope, shackle, Web sling, and Chain blocks regularly. Training:
Rigging Supervisor (TR) 13 Dec 2017
Wataniya Environmental Training Institute 13 Dec 2019 Id # 200262 Kuwait
Work Permit Authorization Executor (TR) 24 Sept 2017 Mab/Cpf Pckg-2 Pmc/Pmt Knpc 24 July 2020
Kuwait
Rigging Supervisor (TR) 12 Sept 2017
Lloyds Inspection Agency 11 Sept 2018
Cert # 170463 Kuwait
Lifting Supervisor (NCOC) 14 June 2016
Industrial Safety Rules 13 June 2019
Kazakhstan
Bosiet /Huet (NCOC) 10-12 June 2016
Seftec Global Training Atyrau 11 June 2020
Opito Approved Kazakhstan
FFT & Basic H2s (NCOC) 9 June 2016
Seftec Global Training Atyrau 8 June 2020
Opito Approved Kazakhstan
IIF-Incident & Injury Free (Petrofac) 23 Feb 2016
JML Associates Zadco Island Abu Dhabi UAE
Basic H2s (Petrofac) 30 Sept 2015
ETSDC Course Code 9014 29 Sept 2019
Opito Approved Abu Dhabi UAE
ZADCO Offshore Safety (Petrofac) 30 Sept 2015
Modules Covered: Safety Induction Installation & Lifeboat Evacuation 29 Sept 2019 Fire Fighting Self Rescue & First Aid Abu Dhabi UAE TSBB-Travel Safely By Boat (Petrofac) 29 Sept 2015 ETSDC Course Code 5605 28 sept 2019
Opito Approved Abu Dhabi UAE
Rigger 1 (Jacobs) 4 Mar 2015
Test-Testing Equipment Specialist Team 4 Mar 2016
Cert # Test-Id-2015-046 Abqaiq Saudi Arabia
Lift Director & Site Supervisor (Jacobs) 31 Jan 2015 ITI-Industrial Training International E-Learning Course Module 1, 2&3 Jubail Saudi Arabia First Aid (Petrofac) 17 Sept 2013
Petrofac-HSE Counsel Hamriyah Fze Sharjah UAE
Basic First Aid (Petrofac) 21 May 2011
American Safety and Health Institute South Yoloten Gas Field Mary Turkmenistan First Aid Emergency Care Education (KBR) 7 Oct 2009 SKOP Saudi Kayan Olefins Project Jubail Saudi Arabia S.A.F.E. Shaping Accident Free Environments (KBR) 6 June 2009 SKOP Saudi Kayan Olefins Project Jubail Saudi Arabia First Aid / CPR (KBR) 2 Apr 2008
Al-Mana Hospital Jubail Saudi Arabia
License To Go Offshore (GIS) 22 March 2007
Overview Of Enhance Ems And Ghser Galliano Louisiana USA B.S.T.C. (GIS) 22-30 Jan 2007
Personal Survival Techniques Manila Philippines
First Aid 1&2 Personal Safety & Social Responsibilities 1&2 Fire Fighting Rigging Confined Space L.O.T.O. Ppe Respiratory (GIS) 17-19 Dec 2005 Grand Isle Shipyard Training Centre Galliano Louisiana USA Bosiet /Huet H2s Sea Survival Fire Fighting (GIS) 5-9 Nov 2005 CTSI Cavite Philippines
Rigging 21 Sept 2005
ETC Trade Test and Training Manila Philippines
Educational Attainment:
Marine Engineering 1990-1992
Bataan Heroes College Balanga Bataan Philippines
Secondary / High School 1986- 1990
Lamao High School Lamao Limay Bataan Philippines
Primary / Elementary 1980-1986
Lamao Elementary School Lamao Limay Bataan Philippines Personal Data:
Name: Roberto M.Villaluz
Date Of Birth: December 9, 1973
Address: Brgy. Maligaya Caluluan Concepcion Tarlac Philippines Passport No: P6431622A
Expiry Date: 14 March 2028
Place of Issue: PE Kuwait
Mob No: +639********* (Philippines)
Mob No: +965******** (Kuwait)
Roberto M.Villaluz