Post Job Free
Sign in

Power Plant Operator

Location:
Bhopal, Madhya Pradesh, India
Salary:
Negotiable
Posted:
July 28, 2018

Contact this candidate

Resume:

RESUME

Satyam Kotha Mobile : +919*********

DOB : 1 0 Aug 1973 : k *********@*****.***

OBJECTIVE:

Looking for a challenging and Rewarding Position in Power Generation Oriented organization, which offers diverse Job responsibility in Power plant Engineering & fully utilize both my Technical & operational Skills to the best.

EXPERIENCE: 20 Years

Currently working in Orient Paper Mills Limited Amlai, a group company of CK Birla under Operational Energy Group India as Shift in charge

Duration: 22 06 2012 to TILL

Th ermax make (AFBC)1 50TPH water tube boiler with Siemens make extraction cum condensate

(1*25MW & 1*30MW)T urbines, 90TPH CHP,110TPH DM PLANT, P revious Employer:

Worked in power plant of KSK Energy Limited Unit : Arasmeta under the O perational Energy Group India a Desk Engineer

Duration: 25 02 2006 to 04 05 2012

P LANT DETAILS:

● There are T wo Water tube Boilers (AFBC) of Capacity 90 TPH each (Total 180 TPH) for Phase 1 Thermax Make & Babcock & Wilcox Type. Coal Size: 6 mm . Three Super Heaters i.e., Primary SH, Secondary SH and In Bed SH

● There are O ne Water tube Boilers (CFBC) of Capacity 190 TPH for Phase 2 Make : IJT. P rimary SH, wing wall SH and Final SH

● Both Boilers, Steam Pressure: 89 Kg/Cm2 & Temperature: 515 5 Deg C.

● Both Turbines, BHEL Make of Capacity 2Χ43 MW Impulse reaction type w ith total no. of Stages: 38 And 32, with Three extractions, there are H.P, Blead,and L.P, .

● Power generated is consumed by L afarge C ements (LIPL ACP) a nd S onadhi Cement Plant

(LIPL SCP) through Grid.

● Switch yard Capacity 132 KV.

CLIENTS : Lafarge India Ltd.

P ROJECT : O&M of 2x43 MW Captive Power Plant.

LOCATION : Arasmeta.

DURATION : Feb 2006 to till date

Previous Employer:

1) Ind Barat Energies Ltd. Turbine Operator

Duration: 27 06 2000 to 20 02 2006

Turbine is D.L.F. make (Skoda Design), worked as Turbine Operator, turbine rolling and maintains all turbine area running equipment parameters for safe operation of Turbine. 1

2) Subhodaya Chemicals Pvt. Ltd. Boiler cum Turbine Operator Duration: 19 07 1999 to 25 06 2000

Turbine is Gujarat Prime movers 0.5 MW make, worked as Turbine cum boiler Operator, turbine rolling and maintain all turbine area running equipment parameters for safe operation of Turbine and (WHR) Boiler Operation (5 Ton capacity).

3) Delta Paper Mills Ltd. Turbine Operator

Duration: 01.07.1993 to 21 08 1999

Turbine is G.E.C England 1.5 MW make, worked as Turbine Operator, turbine rolling and maintains all turbine area running equipment parameters for safe operation of Turbine. Academics:

Exam Institute Board D ate of

pass out

marks

SSC Unguturu Z.P.H School

Unguturu S.S.C

March.198

9

297/600

ITI Sri Lakshmi Memorial Industrial

Training Center

The Director of Technical

Education

July.1991 495/650

Diploma (Mech) Distance Education

Academic and Executive

council for management

Studies

Feb.2010

1s t

class Boiler

Holder Andhra Pradesh Chief executive and

Director of boilers

June.2010

TRAININGS ATTENDED:

● 1 A ttended a Training on “Improving Steam Turbine Operation” from 25 11 2008 to 28 11 2008 by India Boiler Dot Com at vadodara.

● 2 I JT cfbc boiler t raining classes Attend at Arasmeta captive power plant PERSONAL DETAILS:

Name : Satyam Kotha

Father’s Name : Sreerama Chandra Murthy

Date of Birth : 10 Aug 1973

Nationality : Indian

Religion : Hindu

Marital Status : Married

Present Address : K. SATYAM

C/o.U.V.R.PATNAIK GARU

H.no B/8 sahara vihar colony, Near maszid

Kasimpara, Bilaspur (R.S.)

Janjgir Champa (C.G.) pin.495004

Permanent Address : K. Satyam

B/o K. V. V. S. Nageswara Rao

Unguturu Post & Mandal

West Godavari Dist. A.P. Phone: 088********.

D ECLARATION:

In the light of above mentioned facts, if I would be give a chance I shall charge my service to entire satisfaction of all my superiors.

2

SIGNATURE

(Satyam Kotha)

3



Contact this candidate