Post Job Free

Resume

Sign in

Project Manager

Location:
Cairo, Cairo Governorate, Egypt
Posted:
July 22, 2018

Contact this candidate

Resume:

AAhhmmeedd EEll--GGhhaarreeeebb NNaassrr KKaasssseemm

Mob: 0020-1101001811

Email: ac6c5g@r.postjobfree.com

Career objective:

Seeking for the opportunity to achieve a successful career, where my abilities and skills can be utilized and glossed within a cooperative teamwork in the field of engineering management.

Career Summary

14 Years work experience in the field of Civil Engineering, with high Managerial, Technical, Constructional and problems solving skills in both Egypt and Saudi Arabia.

Qualified to:

Managing budget and maintain the projects cost, committed spend, payments, manpower & equipments.

Coordinating, supporting and supervising the projects construction.

Leading a huge team even with different department, culture and nationalities.

Handling employee’s relations and motivate them.

Identifying the project risks and provide proposals to solve it.

Scheduling and recognizing reports variances and made the financial forecasts to ensure the accuracy of overall spend forecasts.

Target/Result Oriented; With Planning & Management Skills.

Personal Effectiveness [Organizational/Communication/Time Management]

Estimating and studying construction projects.

Work Experience:

1. Projects Manager at (ABIS) - Saudi Arabia

From September 16, 2013 to September 15, 2017.

Define and manage Company and projects scope.

Define and manage plans, timelines and projects cost.

Develop and manage projects CAPEX and assets.

Manage departments and projects communication processes.

Maintain the repository for status reports, work plans, proposals, change requests, etc.

Identify and resolve common problems and potential risk issues across projects.

Improve project management capabilities, knowledge, competence, and skills.

Reduce cost of projects to positively impact the overall portfolio management cost.

Works with senior management to provide strategic and tactical advice on program/project planning and execution.

2. Owner of (Infinity: surveying & contracting).

From March 9, 2006 to July 15, 2013.

3. Civil engineer at AAW (Ahmed Abd ELwares Consulting Group) IN SAUDI ARABIA.

From June 9, 2005 to February 9, 2006.

4. Civil engineer at the Surveying Consultancy Unit - Faculty of Engineering – Ain Shams University. From August 6, 2004 to June 4, 2005. (Part Time)

5. Civil engineer at SMT Consulting Group.

From August 6, 2004 to June 4, 2005.

On the course of my work, I’ve participated in numerous projects such as:

1. Marriott Hotel (Project Manager)

4-star hotel with BUA 40,400 m2, 250 keys with budget 175 million SAR.

2 basement starting from -10 m, ground, mezzanine and 5 typical.

Lead the technical team to make value engineering and success to decrease the budget from 264 million to 175 million. 2. AL-Fursan Project (Project Manager)

Construct 233 villas (turnkey project) and one mosque with amount 122 million SAR.

Make value engineering by redesign the structural for all 22 models and change the tanks.

3. Abo Hedriya Camp (Projects manager)

- Huge camp on 100,000 m2 contain:

9 concrete building with two floors.

8 steel buildings with two floors.

Main kitchen with 5900 m2 to serve Eastern Province.

Main store with 7000 m2.

Transportation work shop with heavy equipment garage.

Heavy duty plastic crashing machine with truck scale (piscol).

Gas filling station (Freon).

Mechanical work shop on 2000 m2

Firefighting network to serve all the project HDPE pipes.

water network with two will and RO plant.

Electric network with 9 huge generators 800 KVA. 4. Plastic Factory CRE (Projects manager)

Construct a steel structure factory with BUA 5000 m2 on land with 13000 m2 including all finishing, fence, gates and facility. 5. Barrak Farm and Palace (projects manager)

Huge LUXURY farm on 100,000 m2.

Luxury palace with the highest finishing specs.

4 secondary villas for gests, dining, gym, spa and worker’s accommodation.

Luxury Arabic tent with budget 2,000,000 SAR

13,000 m2 natural lake.

Swimming pools with water fall.

Animal farm with caves and horses track.

6. Well heads with two gas lines (projects manager)

Total 9 kilometer gas pipes.

7 kilometer electrical cable and communication cables.

Change the cellars and construct the concrete walls and pet for the new well heads with all facility.

7. Operate maintenance and modification projects with volume 20 million/year (projects manager)

Saudi Aramco

Sabic (Saudi Kayan, Hadeed, United, Saudi Cheveron

Maaden Aluminum

Chemanol.

8. Ras El-kher port offloading facility

Extremely fast track project with budget 2,000,000 SAR in 14 days only.

Offloading facility which can serve 2 truck on the same time from the ship directly with piping network on steel structural.

Very restricted safety condition due to the location wharf and the offloading material nature (sulfate).

9. Dream Land

Construct a building with BUA 9400 m2 area contain of basement and five Floors (turnkey)

Construct a 16 villas in flower resort area.

Digging about 60000 m3 (rocky soil) in kanion area. 10. Central Agency for Public Mobilization and Statistics In Ismallia city (Renovation)

11. Security building in United Nations camp in Ismailia/Egypt 12. Galaxy Gym in Cairo

13. Apple restaurant (finishing)

14. Osman ebn Affan school (Full Renovation)

15. Nasser club (Full Renovation)

16. La gona Sokhna (Construction of 6 chalet)

17. Construct a building of five floors in Ismailia- Egypt. 18. Construct six villas in different places in Cairo. 19. OM Barka - Marsa Matroh.

Construction of four villas turnkey for staff housing (Khalda Petroleum) Surveying work:

Sheraton Al-Jazeera hotel.

Jolly vile golf hotel

Mena House Hotel

Novotel Airport Hotel

Sonesta San Gorge Hotel (luxury)

Mohammed Ali Palace in Manial

El-Ahly Bank Capital branch

Bloom Bank Mansoura branch & Shobra branch

Audi Bank Zamalek branch & New Heliopolis

Zawet Abo mosalam Village

The Second Stage of drainage network in Taef

The Second Stage of drainage network in Jeddah

The Third Stage of drainage network in Jeddah

The Second Stage of drainage network in Makkah

The Holy Land (Mena, Mozdalefa and Arafat)

6 Tanks on The Top of Makkah Mountains

Personal information:

Date of birth: November 18th, 1981

Religion: Muslim

Nationality: Egyptian

Marital Status: Married

Military service status: Permanently exempted

Linguistic & Computer Skills

Fluency in spoken and written Arabic (Mother Tongue).

Excellent in spoken and written English.

Excellent operating knowledge of MS office.

Internet skills / AutoCAD / Surfer.

Academic record:

Bachelor of Science, Civil Engineering

Faculty of Engineering, Civil Department - Ain Shams University, Egyp Year of graduation: 2004 Grade: Accepted

Graduation project: Surveying Grade: Excellent

References furnished upon Request.



Contact this candidate