PRANIT KALYANKAR
Phone: (M) +974-********; Email: ******.*********@*****.***
MMUP Certified Engineer, MSc. PM, BE Civil, DCE
Planning Professional with 13+ Years of Experience Result-driven professional with 13+ years of experience in the field of Infrastructure (Roads & Bridges), Urban Development (Villas, Residential & Commercial Building Constructions) and Real Estate industries; Through association in project planning, scheduling and controlling of engineering & construction works with a solid, verifiable career track record. Exceptional communicator with strong negotiation, problem resolution, and client needs assessment aptitude.
Expertise in managing end-to-end operations with key focus on profitability and optimal utilization of resources. Technically strong in handling planning, scheduling and controlling functions.
Proficient in developing budget, business plan, master list of various resources & their rolling plans.
Coordinating and ensuring the job accomplishment within budgeted cost, time, quality and safety in accordance with the project specifications, standards & regulations.
In depth understanding of modern methodologies & best engineering practices across discipline.
Demonstrated abilities in organizing resources and optimizing man, material & machine resources.
Clear understanding of scope, complexity, priority, resources requirement & procurement. CORE COMPETENCIES
Planning Techniques
Primavera Project Planner P- 6
Project Planning & Coordination
Project Monitoring & Control
Delay Analysis & EoT Claims
Root Cause Analysis Techniques
Risk Analysis Techniques
Project Budgeting
Project Execution
Construction Management
Operations Management
Resources Capacity Utilization
Materials Reconciliation
Cost Monitoring & Control
PROJECTS COMPLETED
Roads, Bridges & Infra Projects – a) Worked on 18 Projects in different regions of Oman and Qatar b) Worked on major mixed utilities network Infra and Road projects. c) Together counts road length more than 437 Kms with 37 bridges
Maintenance Projects – 6 Projects of Paved & Track Road Maintenances, Sultanate of Oman
Sewerage Project – Expansion & Renovation of Sewage Treatment Plant at Nasik, India
Building Projects – a) 6 small and medium Residential Buildings at London, UK b) Residential colony of 11 Villas and 22 Duplex houses at Ulceby, UK c) Shopping Mall, 7 small & medium Buildings at Nasik, India
Industrial Project – Industrial shade for Khade Industries covering area of 18,600 Sqm. EDUCATIONAL QUALIFICATIONS
MSc Project Management from Sheffield Hallam University, UK. (Jan’07 – Jan’08)
Bachelors of Civil Engineering from Pune University, India. (Jul’03 – Jun’06)
Diploma in Civil Engineering from Maharashtra State Board of Technical Education, India. (Jun’98 – Jul’01)
Registered with Engineering & Consulting Offices Accrediting Committee (MMUP / UPDA), Reg. No.17603 SOFTWARE SKILLS
Primavera P6
Auto CAD
MS Excel
MS Word
MS Power Point
MS Visio
ERP
IPMS
PROFESSIONAL EXPERIENCE
NAEL & BIN HARMAL HYDROEXPORT WLL, QATAR (Oct’2015 – Till Date) – 2 Years 9 Months Position Project Planning Manager
Project Handling: Roads and Infrastructure in West Muaither (DW002 - PHASE 1) Project Outline: The Project is located entirely within Zone 55 of the Al Rayyan Municipality and covers an area of approx. 245 hectares of Doha West. Project work includes about 39 km of roadwork, 36 Km of storm surface water drainage network along with 2.7 Km of micro tunneling, 2.2 Km of foul sewer lines, Laying of 10 Km new TSE pipeline network, 86 Km street lighting cable with erection of about 1,700 street lighting poles and luminaries installation, civil ducting works for OOREDOO, QNBN and ITS networks, MV/LV cabling works, traffic signals and signage, soft and hard landscaping etc. Key Deliverables:
Preparation of Baseline Program, it’s monitoring and updating, computing variances
As and when required, preparation of Mitigation plan, Revised Program etc.
Preparation and Updating Short term Look ahead Programs
Preparation of KPI’s, resources Rolling plans, Histograms and Progress S-curves
Preparation and submission of Daily, Weekly and Monthly Progress Reports
Maintaining Monthly / Quarterly Martials planned vs. actual and forecast quantities log.
Monitoring of various Permits Submission, Approval & their Renewals from various authorities.
Preparation of Progress Review Presentations and various charts like Organization Chart, Resources Distribution Charts, Progress Charts etc.
Preparation & monitoring of Drawings / Materials Submittal Schedule and Materials Procurement Schedule
Based on Program following construction priorities with site execution teams, subcontractors
Preparation of monthly Projections (Commodities Planned, Manpower & Vehicle/Equipment requisitions, Materials required, Subcontractor’s & inter-unit input and estimated income & expenses for the month etc.)
Notifying Constraints to achieve monthly target and areas scouts’ Management Intervention.
Analyzing Capacity Utilization of key Machineries & Tradesmen
Conducting delay analysis & preparation of comprehensive Extension of Time Claim KHALID BIN AHMED & SONS LLC, OMAN (May’12 – Sep’15) - 3 Years 4 Months Position Dy. Planning Manager (reported to the General Manager Projects) In a capacity of Head of Department successfully leaded “Planning & Monitoring Division” of this organization
Projects Handled:
a) Sinaw-Mahut-Duqm Asphalt Road (81 Kms Main + 22 Kms Link Rd) (Sep’12 – Sep’15) – On Going b) Al Murri to Al Ayn Asphalt Road (33 Kms + 2 Bridges) (May’12 – Apr’15)- Completed c) Wadi Hilti Asphalt Road (23 Kms + 5 Bridges) (May’12 – Dec’14)- Completed d) Qumairha to Hail Al Khanabisha Asphalt Road (22 Kms) (May’12 – Jan’15)- Completed e) Wadi Mistal Asphalt Road (12 Kms + 1 Bridge) (May’12 – Jun’13)- Completed f) Oman Convention & Exhibition Centre Internal Roads (5 Kms + 2 Bridges) (Jan’13 – Jun’14)- Completed g) Al Murtafa Street Interchange & Roads (12 Kms+3 Bridges) (May’13 – Sep’15) – On Going h) Ras Al Hamra Mina Al Fahal Carriageway Dualization (Mar’13 – Nov’14)- Completed i) Wadi Al Jazzer Bridge at Willayat Sur (8 Kms + 2 Bridges) (Sep’12 – Sep’15) – On Going j) Sumail Transfer Station Facilities & Internal Roads (Sep’13 – Jan’15) – Completed k) Al Sahira Asphalt Road (12 Kms) (Jun’ 11 – Apr’ 12)- Completed l) Rehabilitation of Al Khad Sham Asphalt Road (6 Kms) (Mar’14 – Sep’15) – On Going m) Other Six Projects of Paved & Track Road Maintenances (May’12 – Sep’15) – On Going n) Dualization of BidBid-Sur Road, Sec-II, Part-2 (52 Kms + 9 Bridges) (Jun’14 – Sep’15) – On Going o) Dank Al Khubayb Asphalt Road (6 Kms + 1 Bridge) (Sep’14 – Sep’15) – On Going p) Ubhyla Fayyad Asphalt Road (42 Kms + 2 Bridges) (Oct’14 – Sep’15) – On Going q) Internal Roads at Wilayat Bidbid Phase-1, Phase-2 & Wilayat Ibri (27 Kms) (Jan’15 – Sep’15) – On Going r) Grade Separated Interchange at Ibri – Haffith Junction. (6 Kms + 1 Bridge) (Mar’15 – Sep’15) – On Going s) Dualization of Sur – LNG R/A road (14 Kms) (Oct’14 – Sep’15) – On Going Key Deliverables:
Preparation of Baseline Programs as per contract specifications
Preparation of KPI’s, Resources rolling plans, histograms and financial S-curves for baseline schedule
Preparation of projects Budgets, Cash Flows and Revisions of it in case of Scope Variation
Providing guidance to the Planning Engineers on revision, recovery & updating of construction schedules
Ensuring schedule revisions and updates by planning engineers are realistic, practicable and appropriate
Reviewing and ensuring that rolling plans/histograms, progress S-curves, critical materials procurement schedule, subcontractor’s deployment schedule prepared by planners are logical and correct
Summarization of Master Programmes / Business Plans/ Cash Flows of all projects at Corporate Level
Monitoring progress of all ongoing projects, Updating and Computing Variances
Preparation of Weekly and Monthly Dashboard Reports for Management Review
Monitoring Resources Capacity Utilization on actual production
Verification of projected manpower and machineries Requisitions raised from Projects
Preparation of Delay Impact Analysis and EOT submissions
Monitoring of Materials Submittal Schedules and Materials Procurement Schedules for ongoing projects
Preparation of Site Organization Charts, Leveling and identifying Additional/ Surplus Staff Requirements
Providing the site team with various Monitoring Formats & Progress Charts
Assessing Constraints to achieve monthly targets of all current projects and informing top management about areas scouts’ Management Intervention
MIS generation and presentation for all in hand projects & in-house profit centers
Conducting progress review meetings
Preparation of Project Close Out Reports
GALFAR ENGINEERING & CONTRACTING SAOG, OMAN (Apr’ 09 – Apr’ 12) - 3 Years Position Planning Engineer (reported to the Sr. Project Managers) Projects Handled: a) Al Faroosiya Street Interchange (15 Kms + 7 Bridges) (Jun’ 11 – Apr’ 12) Project Outline: Grade separated interchange (2 box girder bridges), 6 wadi bridges of “I” girders, service roads, 1 roundabout, 6kms Wadi channelization, 40 box culverts, pipe culverts, retaining walls, MSE walls, riprap works, safety barriers and other furnishing works.
b) Wadi Bani Kharus Asphalt Road (35Kms+2 Irish Bridges) (Apr’ 09 – Jun’11) Project outline: New asphalt road of 35 kms consist of 1 Roundabout, huge Hill Cutting, 60 Box Culverts, 4 Irish bridges, 16 Irish crossings, 5.3kms Rigid Pavements, 3.8Kms Gravity Wall, Retaining Walls, Riprap works, Shotcreting, Safety barriers and other furnishing works
Key Deliverables:
Preparation of Baseline Programme, it’s monitoring and updating
Preparation of project Budget, Cash Flow and Revision of it in case of Scope Variation
Preparation of yearly Business Plan and its quarterly Updates
Preparation and Updating Short term Look ahead Programmes
Preparation of KPI’s, resources Rolling plans, Histograms and Progress S-curves
Preparation & monitoring of Drawings / Materials Submittal Schedule and Materials Procurement Schedule
Based on Program fixing construction priorities for Subcontractors
Preparation of monthly Projections (Commodities Planned, Manpower & Vehicle/Equipment requisitions, Materials required, Subcontractor’s & inter-unit input and estimated income & expenses for the month etc.)
Notifying Constraints to achieve monthly target and areas scouts’ Management Intervention.
Progress Monitoring, Updating and Computing Variances
Analyzing Capacity Utilization of key Machineries & Tradesmen
Preparation of Daily, Weekly and Monthly Progress Reports
Monitoring & reporting activity Slippage/ Gain and its impact on Milestones, Critical path etc.
Conducting regular site progress meetings to discuss various Critical Issues
Assisting Project Manager in Progress Meetings, Reports Preparation, Analysis & Analytical information.
Foreseeing Delays, intimating management and promoting consequent Recovery Action
Identifying the grounds for delays beyond contractor’s control and preparation of Extension of Time (EOT)
Preparation and Updating Risk Register.
FRONTLINE SITE ENGINEERING LTD, UK (Jul’08 – Feb’09) – 8 Months Position Freelance Planning Engineer (reported to the Planning Manager)
During my stay, worked on more than 6 Small and Medium Projects, mainly included Residential Buildings at London, UK. Key Deliverables:
Develop Schedules for projects in consultation with the Contractor & their GECs
Monitoring and reporting Time and Cost of the projects
Assisting contracts team for preparation of extension of time claims
Periodically updating progress with respect to the approved B.L. schedules
Preparation of recovery/ revised schedules
Preparation of Cash flows for projects, forecasting trends and cost / financial reporting
Preparation of weekly, bi-weekly and monthly reports
Frequent site visits in order to verify and record the physical progress
Preparation of monthly Look-ahead Programmes (Commodities Planned, Manpower & Machineries requisitions, Materials required, Subcontractor’s input along with estimation of income & expenses etc.)
Participation in the progress and coordination meetings in order to discuss the status of the projects
Data capturing, calculating, analyzing variances and measuring performances WILDGOOSE CONSTRUCTION LTD, UK (Feb’ 08 – Jun’ 08) - 5 Months Position Site Engineer (reported to the Site Manager) Project Handled: Residential project at Ulceby, North Lincolnshire, UK Project Outline: Construction of new residential colony, Project scope included construction of 11 bungalows and 22 duplex houses with the provision of internal roads, street lighting and garden etc.
Key Deliverables:
Surveying the site; Setting out & leveling the site
Planning the work & efficiently organising the plant & site facilities to meet deadlines
Day-to-day management of the site, including supervising and monitoring the site labour force
Monitoring subcontractors for work progress
\
CHAITANYA BUILDERS & DEVELOPERS, INDIA (Jul’ 06 – Jan’ 07) – 7 Months Position Planning Engineer (reported to the Project Manager) Project Handled: Const. of Shopping Mall + Residential flats at Nasik City, India Project Outline: Building was partly in RCC structure and partly in steel structure. Scope of work included construction of Car Park at basement floor, Shopping Mall at ground & 1st floors and residential flats at 2nd & 3rd floors. Key Deliverables:
Preparation of efficient Programme of works meeting contract milestones requirement
Implementation of Project plans & ensuring logical sequencing of works and availability of resources
Preparation KPI’s, Resources rolling plans, histograms and progress S-curves
Preparation of Daily/Weekly/Monthly program updates and progress reports
Monitored construction schedules and highlighted the anticipated delays/ deviances in advance.
Extractions of short term look ahead programs for effective monitoring
Identification the areas/sectors of concern with less productivity and advise execution team to adopt effective measures or strategies to avoid future delays
Assisting Project Manager in progress meetings, preparation of reports, analysis etc.
Conducting regular site progress meetings to discuss various critical issues with project
Preparation of Method Statements & Risk Analysis for the concerned works
Foreseeing Delays, intimating management and promoting consequent Recovery Action SHALKE ASSOCIATES, INDIA (Aug’ 04 – Apr’ 05) - 9 Months Position Trainee Structural Design Engineer (reported to the Sr. Architect) While conducting thesis of my engineering academics, availed an opportunity to work with Shalke Associates an excellent engineering consultancy firm in my locality, where I could practice on 7 small and medium size projects which included Residential & Commercial Buildings, Industrial Shades, Villas etc. at Nasik City, Maharashtra, India
Key Deliverables:
Assisting for Structural analysis, design and detailing of RCC structures
Preparation of Construction Drawings
Preparation of Shop Drawings
Preparation of BOQs and Specifications
Preparation of Presentations for the Projects
Inspection of execution works to ensure that engineering is implemented to a definite Design & Quality CHAITANYA BUILDERS & DEVELOPERS, INDIA (Jul’ 01 – Jun’ 03) – 2 Years Position Site Engineer (reported to the Projects Manager) Project Handled: Expansion & Renovation of Sewage Treatment Plant at Nasik, India Project Outline: A sustainable approach without fossil fuels in sewage treatment plant expansion & renovation also comprised relocation, protection
& maintenance of various sewerage lines.
Key Deliverables:
Responsible for Setting Out, Planning and Controlling the project with appropriate allocation of resources
Liaising with any Consultants, Sub-Contractors, Supervisors, Planners, Quantity Surveyors and the General Workforce involved to ensure the satisfactory progress
Overseeing the selection & requisition of Materials & Equipment’s for use in construction
Agreeing rates for Materials, making Cost-effective solutions and Proposals
Delivering quality of construction to the engineering standards
Coordinating and managing numerous Subcontract Work Packages
Responsible for Health and Safety during the execution stage TRAININGS & CERTIFICATIONS
Certified training of Primavera 6.8 from IMTC, Oman, 1st Mar 2013
Certified training of 35 contact hours required for PMP® certification examination, 5th Jun 2012
Certified training of Primavera 6.0 from CADD CENTRE, Pune, 9th Jan 2009
Member of Royal Institute of Chartered Surveyors (RICS), Member No. 5012840
Member of Institute of Civil Engineers (ICE), Member No. 65140253
Member of American Society of Civil Engineers (ASCE), Member No. 503512
Member of Civil Engineering Students Association.
Construction Skills Certification Scheme (CSCS) card.
Participated in “Solid Waste Management” workshop, 13th Apr 2006
Participated in “Entrepreneurship, Management Development Cell ” training workshop, 1st Mar 2006
Participated in “Entrepreneurship Development” workshop, 24th Sep 2005
Participated in “Building Services” workshop, 7th Aug 2004
Participated in “Remote Sensing and G.I.S. Application in Civil Engineering” workshop, 6th Mar 2004
Certified training of Auto CAD 2002, 17th Apr 2003
Certified training of Site Engineering from School of Setting-Out, London, Feb 2008 SKILLS PROFILE
Interpersonal/Communication: Well-developed communicational and interpersonal skills with the ability to listen effectively, respond appropriately and maintain mutual comfort level while relating to diverse group of individuals. Able to liaison between technical and non-technical persons. Shoulder a leadership role wherever required.
Initiative & Ability: Self-motivated, able to undertake multiple responsibilities, remain productive with time-sensitive and fast paced environment. Adaptable to new environment and technologies.
Analysis & Evaluation: Recognized for professionalism, thoroughness, analytical data assessments and formulating solutions.
Presentation: Developed ability to produce reports & presentations to a professional standard PERSONAL PROFILE
:
Nationality : Indian
Passport Number : N3776649
Marital Status : Married
Date of Birth : 21-Jan-1983
Languages Known : English, Hindi, and Marathi
Driving License : Qatar, Oman, India
(PRANIT KALYANKAR)