Post Job Free

Resume

Sign in

Engineer Project

Location:
Cicero, IN, 46034
Posted:
July 21, 2018

Contact this candidate

Resume:

Robert E. Truster

513-***-****

Objective:

To secure a position as a senior project engineer in a manufacturing environment involving product enhancement or development.

Skills and Qualifications:

Team Building

AutoCad 2014

CREO2

SAP knowledge

Problem Solver

Strong Communication Skills

Efficient and Organized

Excellent written and verbal skills

Inventor 3D

Solid Works 2010 3D

ERP knowledge

Professional Experience:

Early Engineering and Associates

2013 - Present

Midland, Ohio

Sr Project Engineer

Contracted to Milacron designed and detailed parts for the sheet line, extruders, and injectors. Added customer ordered specials to standard machines. Checked details to Milacron standards. Creo-2 3D platform. Working knowledge of quick E1 and E1. Issuing parts thru E1. Assigned task of distributing work with Milacron’s sister division in India.

Contracted to Armour Group

Responsible for piping and sheet metal for Can Washers and Mat cleaners-both 2D and 3D drawings.

Checking and updates for these machines.

In-house projects, proposal, design build and troubleshoot.

Projects include belt welder for Intelligrated, Weld fixture for Pennant Molding SolidWorks 2010 3D platform

Designed and detailed Work Station for Fives-Hebron, Ky Pro-e 3D platform

Contracted to Milacron design and detail of IR heater for extruded plastic line. Added customer ordered specials to standard machines. Checked details to Milacron standards. Creo-2 3D platform

Lead a design team to integrate a lift, rotation and tilt to an extruder. After initial proposal models, customer changed requirement to lift only (24” vertical). Completed lift, customer extremely satisfied with result of the project, wants 3 more.

Verified machine orders, and updated machine orders using the Enterprise BOM system.

MAG-IAS

2005 - 2013

Hebron, KY

Sr Project Engineer Composites Group

Responsible for issuing parts on a new machine orders (3-5 million dollar orders).

Capable of handling more than one order at the same time.

Responsible for understanding what the customer wants on new machine order.

Developed proposal drawings for the customer.

Developed project schedule and manpower requirements.

Engineered the customer specific changes.

Coordinated entire design effort including permanent staff and contract engineering.

Issued parts and determined that the BOM is correct and accurate.

Worked closely with electrical and software engineers to deliver the product.

Developed Parts and Service manuals.

Worked with outside manufacturing houses to resolve manufacturing problems.

Developed process to have a vendor supply powertracks pre-assembled with hoses and electrical cables. Pre-assembled in this manner reduced the shop floor assembly time from 7 weeks to 1 week.

Unova, Inc

1998 - 2005

Cincinnati, Ohio

Sr. Project Engineer

Responsible for design and development of units on a new machine order-per customer requirements

Responsible for understanding what the customer wants on new machine order.

Developed project schedule and manpower requirements.

Engineered the customer specific changes.

Solved a problem with the coolant system on a machine tool line.

Worked with manufacturing to resolve manufacturing problems.

Issued parts and determined that the BOM is correct and accurate.

Designs in both Inch format and Metric format

Participated on cost cutting programs

Cincinnati Milacron

1991 - 1998

Cincinnati, Ohio

Project Engineer- Applied Products

Provided mechanical engineering element in the development of applications for the customer to a standard platform

Developed project schedule and manpower requirements.

Engineered units to meet customer specifications

Coordinated entire design effort including permanent staff and contract engineering.

Worked closely with electrical and software engineers to deliver the product.

Developed Parts and Service manuals.

Developed BOM structure and completion of the BOM

Participated on cost cutting programs

Led first machine designed in metric format

Cincinnati Milacron

1981 - 1991

Wilmington, Ohio

Project Engineer- New project development

Provided mechanical engineering element in the development of a new state of the art turning center.

Developed project schedule and manpower requirements.

Engineered standard units of the turning center.

Coordinated entire design effort including permanent staff and contract engineering.

Worked closely with electrical and software engineers to deliver the product.

Developed Parts and Service manuals.

Developed BOM structure and completion of the BOM

American Tool –Division of White Consolidated

1980 - 1981

Cincinnati, Ohio

Design Engineer- New project development

Design units of a turning center

Developed BOM for these units

Check of these units

Cincinnati Milacron

1977 - 1980

Wilmington, Ohio

Design Engineer- New product development and standard options

Design units of a turning center

Developed BOM for these units

Check of these units

Education and Licensing:

B.S.A.S. in Electro-Mechanical Engineering Technology-Miami University-Oxford Ohio in 1977.

Additional Engineering classes @ University of Cincinnati College of Engineering.

Technological Skills

MS Word

Excel

AutoCad 2009

SAP

Cadra

Inventor 3D modeling

Solid Works

Reliability and Maintainability

Covey Leadership

Time Management

ERP



Contact this candidate