Post Job Free

Resume

Sign in

مساح

Location:
Alexandria, Alexandria Governorate, Egypt
Salary:
00000
Posted:
July 19, 2018

Contact this candidate

Resume:

HANY AHMED MOHAMED MOHAMED

LAND SURVEYOR

ac6b57@r.postjobfree.com

CAREER OBJECTIV012ES

***/718*****-**/470216.011

PERSONAL RECORDS

Date / Place of Birth:

Born in Alexandria, Egypt, on February 8th, 1980

Social Status:

Married and have Three Child.

Valid Driving Licenses:

Egypt

Address:

.9 Radwan st el agamy ALEXANDRIA - EGYPT

EDUCATION

2000-2004

Bachelor of Arts, Department of Geography, Branch of Surveying & Cartography.

University of Alexandria.

2006

AUTOCAD 2D Course in Science & Technology Engineering Center. SOKKIAPOWERSET- set 3030R

2009 GPS / GSR2700 ISX SOKKIA

WORK EXPERINCE

SURFER – SOKKIALINK – PROLINK - WINCOM APRIL .2016- MAY 2018 Abdul Ali Al-Ajmi CO A Saudi Joint Stock Company .Saudi Arabia . jizan

The project of Establishing the Economic City In Jizan of Saudi Aramco Company All Construction Works Of The Project : Sewage Lines – Water Networks – Storm And Flood Drainage Networks –Electricity Lines … All Infrastructure Works AUG.2014 – MARS.2016

MISR CONSULT ENVIR. INFRA, Str, Studies .

ALEXANDRIA, EGYPT.

Consultant Surveyor

-labour office EGYPY ENGINEERING CONSULTANCY &RESEARCH SOIL ( D/ SAMEH ABDEL GAWAD ) aconsultant space on the NASR COMPANY FOR BUILDINGS AND CONSTRUCTION ( EGYCO ) and credent me as asurveyor from a city BURJ AL ARAB the new private project irrigation network Almusthat floor wastewater treatment trilateral project is the number of ( (2 transformers + Adminstration building + mosque )Along with 72 kilometers of pipes with diameters from 100 to 1200 mm - Revise all Shop drawing submittal and contract drawing related to survey work.

- Checking /Assist in the establishment of survey vertical and horizontal control points.

- Checking all infrastructure networks [Water – sewerage] including layout, excavation, laying pipes and backfilling .

NOV.2006– AUG.2014

NATIONAL GAS COMPANY ( NAT GAS )

ALEXANDRIA, EGYPT

Senior Land Surveyors

Nat Gas Company Areal lift in the concession areas of the company in ALEXANDRIA and BEHERA acts along with the establishment of natural gas from the reduction of 70 to 7 bar - and the completion of many projects such as the Nile sugar factory / brick factories infantile / Poultry Processing Plants

*Under ground works (piping)

* As built pipis

NOV.2004 – JUN.2006

MORGANTI/ AIC LLC JOINE VENTUREALEXANDRIA, EGYPT

Senior Land Surveyors

The project comprises the construction of 72 KM of ductile iron pipe water distribution network . 34 KM of water transmission lines having diameter between 100 and 1600 MM . as well as the upgrades and modification works for seven water treatment plants together with their relevant raw water intakes. residual lines. outfalls and electro-mechanical works .

May 2002 - May 2004

Alexandria Construction Company (ACC)

ALEXANDRIA, EGYPT

Land Surveyor

All civil & Architect surveying works & shop drawing for coordinates layout The project consists of a building of mixed use (30) floor complex. which comprises (3) underground parking floor, 6floor for commercial in addition to beach marine

-Surveying works using several types of instruments. This, from the normal level machines to Theodolites till the most up-to date total stations and GPS As well.

Work Skills

Auto Level & Total Stations:

SOKKIA Topcon LIECA Tiodolite instruments

.Level instruments

GPS:

GSR2700 ISX SOKKIA

I hereby certify that all information that I have furnished herein are true and correct. All Required documents will be available upon request.



Contact this candidate