Wael BEN ALAYA - Methods and industrialization engineer
** *** ******* ******** ******
Tunisia
Tel : 50343218
**************@*****.***
Véhicule Permis B
CURSUS
juin 2014 ingénieur en Génie électrique
Universite Arabe Des Sciences (Tunis)
2010 Technicien supérieur en Génie électrique
Senior Technician in Electrical Engineering (Radès)
2006 Bac en Sciences
lycee ben arous (Nouvelle madina ben Arous)
EXPERIENCES PROFESSIONNELLES
December 2012 - today
Industrial engeneer (Project Leader) Zodiac aerospace (Soliman))
- Industrialize new products mainly in composites.
- Manage manufacturing transfers from a donor site (parent company (France - UK-Tunis).
- Plan and schedule the various transfers during the year
- Define the team, the objectives and establish the detailed schedule of transfers and associated action plans
- Supervise the team and direct it towards the objectives
- Budget development and management
- Ensure the progress of projects
- Draft transfer plans and validate them according to the procedures in force
- Ensure the smooth running of the projects by respecting the requirements (clients, normative
- Risk Analysis during Transfers (AMDEC)
- Establish and make available the means and documents of manufacture and control.
- Define manufacturing processes
- Establish and qualify manufacturing processes
- Create production and control documents
- Ensure the validation of the seeded part (FAI / DVI)
- Ensure the award of the project
- Lead projects for the development of products and processes
- Structural repairs according to specifications and drawings by the ANITA Suitcase, autoclave and oven.
September 2011 - September 2012
Technician Method LEAR CORPORATION (Borj Cedria)
•Define a manufacturing process taking into account the three factors Quality, Cost and Delay.
• Build manufacturing and industrial production lines,
• Provide standard means to be implemented at lower cost
• Optimize the installation of equipment on production ground by ensuring an organized flow and adopting the least expensive process solutions
• Determine the need for resources, means necessary to satisfy customer needs in terms of quality, quantity.
• Define the productivity objectives according to the production capacity of the zone, and the predefined range time, the increase in rate.
• Pilot the FMECA Trials meetings and the implementation of the defined actions.
• Identification of the components (Access database) / preparation of visual aids (Coreldraw).
• Balancing work stations to improve productivity, efficiency and overall plant efficiency.
• Define the monitoring plan and manufacturing diagrams.
• Continuous improvement of the process by triggering the KAIZEN yards.
• Pilot industrial trials and production of prototypes and Initial Samples.
September 2010 - September 2011
Product Technician LEAR CORPORATION (Borj Cedria)
• Followed by implementation of PCR in plane
• Prepare & Ford created the beam planes through PCR received CAPH / Designate.
• Update CAPH data base.
• Implementing new release.
• Pilot meetings of introducing PCR & Alert.
• Creation of BOM data base ... .PLANS (derivative / composite) UCS file, TST, Cutting- Cheet, Benchmark.
• Import CIOs and Compare plans with 3D than 2D.
• Handling basic components (Component Drawing)
• Communication / -Engineering information, logistics
COMPETENCES
Sense of responsibility, dynamic and serious, knowledge in computer science and office automation Technical: CATIA SolidWorks Composite MS PROJECT Project Planning AutoCAD Team Planning Project Planning Continuous Improvement
LANGUES
French - Good
English - Correct