Post Job Free

Resume

Sign in

Estimator

Location:
The Bronx, NY
Salary:
$ 95,000
Posted:
October 01, 2018

Contact this candidate

Resume:

Eng. Raymond Zaimi

**-** **** ****** ****: ( *** ) 559 - 2428

Astoria, NY 11105 e-mail: ac680g@r.postjobfree.com

Dated on : 12 – 23 – 2017

Profile

I’m a professional individual with a sharp attention to detail. I get along with my coworkers and very helpful as a team player.

I have a Mechanical Engineering Degree, and I've been an Estimator with more than 12 years of experience in estimating of Plumbing, Sprinkler and HVAC in both private and public sector projects.

In my job I'm organized & committed and I work really fast in doing meticulously take offs for Plumbing, HVAC & Sprinkler systems, than estimating them out with the best price possible to win a bid.

I have proven ability to estimate up to 20 projects a week, I have also done projects up to $40M.

If You give me the opportunity to put me to the test, you will not be disappointed with my skills, and solid knowledge and expertise in estimating,

Accomplishments

In my job as an estimator I have done mechanical project estimates from $1M to $40M..

All estimating was completed on time and within the budget price for my company.

Professional Experience

I’ve worked for more than 12 years as an ESTIMATOR at ENOBRAC- (Plumbing & Sprinkler) LI City, NY: PACE (Plumbing & Sprinkler ) Brooklyn NY,DRILLON (Plumbing, Sprinkler & Heating.) Brooklyn, NY; GLIMAX – (Plumbing & Heating, L. I. City, NY

From 2017 to 2018 I have been working as an Estimator at ENOBRAC ( Plumbing & Sprinkler ).- LI City, NY

From 2014 to 2017 I have been working as an Estimator at PACE ( Plumbing & Sprinkler ).- Brooklyn, NY

From 2010 to 2014 I have been working as an Estimator at DRILON Plumbing, Sprinkler & Heating), Brooklyn, NY.

From 2006 to September 2010, I have been working as an at GLIMAX _Plumbing & Heating – L.I.City, NY.

In my job as an Estimator in these companies, I was doing Take-offs & Pricing for Plumbing, HVAC & Sprinkler :

Plumbing : I know how to price out:: Plumbing Fixtures, Roughing, Trims, all types of Drains, Stack Risers, Water Risers, Vent Risers, Sewage Ejector Pumps, Sump Pumps, Simplex, Duplex & Triplex Domestic Water Service Pumps, Water Mains, Sewage Main, RPZ-s, Insulations, pipes ( cast iron, copper, PVC etc. ). Domestic Hot water Heaters, etc.

Sprinkler: I know how to price out Sprinkler Heads (pendant, upright, sidewall), Fire Pumps(Electric & Diesel), Jockey Pumps, Standpipe, Dry valve System, Fire Hose cabinet Assembly, Siamese Connection, Air Compressors, Floor Control Valve Assemblies, Fire Water Service etc.

I did estimating per head cost and square foot cost .

HVAC : I know how to price out : Heat Pump Systems, Cooling Towers, AC-Units, Condensing Units, Air Handling Units, Unit Heaters, Gas Fired Boilers(commercial & residential), Ductwork (rectangular & spiral), Heat recovery Ventilators, Fans Water Coil Piping, Chillers, Gas Fired Furnace,etc.

I did budget estimating for Heating, Ventilating and Cooling, by square foot of floor, and value engineering, as well.

From 2002 to 2006 - Security officer in West Trenton, New Jersey 08628-0068

From 1996 to 2002 - CEO of Government Vilas in Albania

From 1986 to 1996 - Mechanical Engineer in an American-Albanian Joint Venture Enterprise related to Food Industry

Education and Training

College of Engineering 1986

Tirana Albania

Mechanical Engineering

I have been graduated from The State University of Tirana, Albania, and I have worked as a Mechanical Engineer for 10 years in Mechanical Engineering Industry,

I've have now been working as an Estimator for more than 7 years

Languages

English

Italian

Albanian

Career Goal

To join an organization with highly dedicated and professional work environment, and to apply my best knowledge and experience as an Estimator to achieve challenging goals for the organization and advancement for my career

Below, there are Some of my Jobs:

Jobs at ENOBRAC Plumbing & Sprinkler

1st Job at ENOBRAC

Project: Building 127 -BRROKLYN NAVY YARD

Location: 63 Flushing Avenue, Brooklyn, NY 11205

Plumbing

We herewith submit our Cost Proposal for (Plumbing) for the above mentioned Project

All work shall comply with local codes and will be performed in accordance with plans as per Addendum # 2, issued for bid P-001,002, 004, 101, 102, 103, 106, 200, 301, 303 400, AND dm-301dated on 10-19--2017, by VAMOS Architecture PC and in coordination with all other trades. The Contractor shall provide all labor, materials, equipment and services for the complete installation of the above work, in full conformity with the requirements of authorities having NYC jurisdiction.

Scope of Work: 1st Fl. & Mezzanine, 2nd Fl. & Mezzanine, 3rd Fl. & Mezzanine & Trusses Floor

Work Includes

Furnish & Install (118) Plumbing Fixtures with New Roughing-in, as per plan, as follows:

o(63) Water Closets,

o(38) Lavatories

o(4) Urinal

o(12) Drinking Fountain

o (1) Janitor Sink

Furnish & Install all Floor Drains, Hub Drains and Funnel Drains, as per plan.

Furnish & Install all Wall Clean Out Deck Plate, as per plan.

Furnish & Install (3) 2" PRV & RPZ, on the Roof, as per plan.

Furnish & Install (1) 4" Meter, Strainer & PRV,, as per plan.

Furnish & Install (1) 4" RPZ, as per plan.

Furnish & Install (1) 1-1/2" RPZ & Sub Meter, serving Irrigation & Cooling tower, as per plan.

Furnish & Install (1) Hot Water Re -circulating Pump, Cast Iron -Bell & Gossett Model# NRF-22,as per plan.

Furnish & Install (2) Elevator Pump-Stancor SE-50, as per plan.

Furnish & Install (1) Triplex Domestic Water Pump, SYNCROFLO Pump Model# 160TVMS40EP-VFD-GAF, as per plan.

Furnish & Install (1) Gas Booster Pump, Eclipse Hermetic Model: HB-4412-1/2as per plan.

Furnish & Install (13) Circuit Setter at Hot Water Return piping-, as per plan.

Furnish & Install all Domestic CW piping, as per plan.

Furnish & Install (93) Condensate Pumps- HARTELL Pump Model: A2-X115as per plan.

Furnish & Install all 2" Condensate Piping, as per plan.

Furnish & Install all Domestic Cold water, Hot Water and Hot Water Return pipe RISERS, as per plan.

Furnish & Install all Domestic Cold Water & Hot Water piping, as per plan

Provide Insulation for all Domestic Water Piping, as needed.

Furnish & Install all Sanitary Piping, as per plan.

Furnish & Install all Vent piping, as per plan.

Furnish & Install all Ball Valves, Solenoid Valve and Check Valve, as per plan

Demolition work on 1st Floor & Mezzanine, as per plan DM-301

Remove all existing gas service equipment, & piping back to main,

Existing Plumbing Fixtures and Piping to be removed back to main.

Existing storm piping abandoned to be removed back to main.

Labor, Testing, Core Drilling as needed.

Fire Stopping

All hangers, support, elbows, tees etc.as needed.

Shop Drawings

Permit, controlled inspections and sign off.

EXCLUSIONS: Plumbing

4” New Domestic Water Service

Hot Water Heater and Boilers

Patch floor slab by others

All wiring of fixtures

All concrete work

All final grading & compaction of slab

Welding

All cutting/ Patching/ Restoration

Asbestos testing & abetment

Any drilling thru structural members

Flashing and waterproofing

Plumbing Cost: $ 1,325,900.00

Sprinkler

We herewith submit our Cost Proposal for (Sprinkler) for the above mentioned Project

All work shall comply with local codes and will be performed in accordance with plans issued for bid SP-001, 002, 003, 100, thru 131, 200, 400, 401, 402, 403, 500 dated on 09 -24 - 2017, by VAMOS Architecture PC, and in coordination with all other trades. The Contractor shall provide all labor, materials, equipment and services for the complete installation of the above work, in full conformity with the requirements of authorities having NYC jurisdiction.

Scope of Work: : 1st Fl. & Mezzanine, 2nd Fl. & Mezzanine, 3rd Fl. & Mezzanine & Trusses Floor

Work Includes:

(1,128) Total Sprinkler Heads

o(384) New Concealed

o(727) New Upright

o(13) Dry Sidewall-in the new Elevator Shaft

o(4) Pre-action Sprinkler Heads

Connect to existing lines as per drawings, existing floor control valve assemblies to remain.

Connect New Piping into Existing Sprinkler Main as per plan.

Furnish & Install (1) Pre-Action System on 1st Floor Mezzanine in IT /Server room, as per plan.

Furnish & Install all new 6” Sprinkler Main Piping, as per plan.

Furnish & Install all new Sprinkler Branch Piping, as per plan.

Furnish & Install all new 6” Fire Stand Piping, as per plan.

Replace Existing ” Sprinkler Branch Piping with New 1”Sprinkler Branch Piping.

New Sprinkler Heads to replace the existing Sprinkler Heads at the end of ” Branch Piping, as per plan.

Existing Sprinkler Heads, Sprinkler Piping and Sprinkler Equipment to remain. Contractor to ensure all existing Heads, piping and Equipment are in proper working conditions. If Sprinkler Heads, Sprinkler Piping and Sprinkler Equipment are not in proper working conditions replace them with New.

Existing Equipment of Fire Hose Connection to Remain. If Equipment is not in proper working conditions replace with new, as per plan.

CUT -In and Connect 6" FSP into Existing FSP piping, as per plan.

Furnish & Install (24) New 2 ” Fire Hose Valves, as per plan

Furnish & Install (13) New 2" Alarm Valve & drain, as per plan

Furnish & Install (10) 2 1/2" Shut of valve with TS WF, 2"Express drain down, as per plan

Provide SEISMIC Bracing, as per Note # 55 on General Notes, as per plan.

Provide Temporary Sprinkler System as per Note # 2, on General Notes.

Drop off Temp Loop

Provide Stock of Spare Sprinkler Heads as per Code.

Demolition:

Remove all Existing Sprinkler Heads (and replace with new), branch piping and Equipment as indicated in Demolition Drawings. Sprinkler piping to be removed back to Main.

Remove all Existing Sprinkler Heads and Replace with new. Branch piping and sprinkler equipment to remain, as indicated in Demolition Sprinkler Drawings.

Shop drawings and hydraulic calculations

Permit, controlled inspections and sign off.

Testing, Core drilling, Fire stopping

One Hydro-test for third Part Inspection.

Not Responsible for defect on Existing Sprinkler System

EXCLUSIONS:

Removal of existing ceiling and grids

PW1 Filing, LAA Filing

Protection/Patching/painting of walls, ceilings

Concrete work

Painting of sprinkler pipe

Asbestos Abatement

Debris Removal

Demolition Work

Dust Proofing

Electric

Engineering

Existing System Repair & Replacement

Sprinkler Cost: $ 950,000.00

The Total Cost for Above Scope (Plumbing & Sprinkler) is $ 2,275,900.00

2nd Job at ENOBRAC

Project: 110 Charlton Street

Location: 110 Charlton Street in Hudson Square, NY

Plumbing

We herewith submit our Cost Proposal for (Plumbing) for the above mentioned Project

All work shall comply with local codes and will be performed in accordance with plans as per issued for bid P-001,002, 003,004, 100, 101 thru 129, 300, 301,301 400,500,dated on 09 -24 2017, by A /R E n v i r o n e t i c s A r c h i t e c t s. P. C and in coordination with all other trades. The Contractor shall provide all labor, materials, equipment and services for the complete installation of the above work, in full conformity with the requirements of authorities having NYC jurisdiction.

Scope of Work: 27 Flores –High End Condominium

Work Includes

Furnish & Install (692) Plumbing Fixtures ( all WC, LAV, BT/SH, Kitchen Sinks and Service Sink) with New Roughing-in, as per plan, as follows:

Hook up Ref. Dishwashers, and Gas Ranges, as per plan

Furnish & Install all Floor Drains, and Shower Drains, as per plan.

Furnish & Install all Clean Out Deck Plates, as per plan.

Furnish & Install all Water Meters, with Strainer & PRV,, as per plan.

Furnish & Install all 6"Backflow Preventers and 6” DCDA, as per plan.

Furnish & Install all Elevator Sump Pumps-as per plan.

Furnish & Install all Duplex Sewage Ejector Pumps-as per plan.

Furnish & Install (1) Triplex Domestic Water Pumps, as per plan.

Furnish & Install (1) Gas Booster Pump, 2as per plan.

Furnish & Install all Electric Hot Water Heaters-, with Drip Pans, Thermostatic Mixing Valves, Leak Detection Funnel Drain and Trap primers, Solenoid Valves, check vales etc, as per plan.

Furnish & Install all Domestic CW piping, as per plan.

Furnish & Install all Hot Water & Hot Water Return piping.

Furnish & Install all Domestic Cold water, Hot Water and Hot Water Return pipe RISERS, as per plan.

Furnish & Install all Domestic Cold Water & Hot Water piping, as per plan

Provide Insulation for all Domestic Water Piping, as needed.

Furnish Heat racing for Hot Water Piping, Installation by others.

Furnish & Install all Ball Valves, Solenoid Valve and Check Valve, as per plan

Furnish & Install all Sanitary Piping, as per plan.

Furnish & Install all Storm Piping, as per plan.

Furnish & Install all Vent piping, as per plan.

Furnish & install all Sanitary Stacks, as per plan

Furnish & install all Storm Stacks, as per plan

Furnish & install all Vent Stacks, as per plan

Labor, Testing, Core Drilling as needed.

Fire Stopping

All hangers, support, elbows, tees etc.as needed.

Shop Drawings

Permit, controlled inspections and sign off.

EXCLUSIONS: Plumbing

New Domestic Water Service

New Fire Service

New Sanitary Service

New Storm Service

Patch floor slab by others

All wiring of fixtures

All concrete work

All final grading & compaction of slab

Welding

All cutting/ Patching/ Restoration

Asbestos testing & abetment

Any drilling thru structural members

Flashing and waterproofing

Domestic & Fire Tanks

Plumbing Cost: $ 4,520,000.00

Sprinkler

We herewith submit our Cost Proposal for (Sprinkler) for the above mentioned Project

All work shall comply with local codes and will be performed in accordance with plans issued for bid SP-001, 002, 101, 102, 103, 104, 105, 106, 107, 200, 400, 401 dated on 10-19 - 2017, by A /R E n v i r o n e t i c s A r c h i t e c t s, P . C. and in coordination with all other trades. The Contractor shall provide all labor, materials, equipment and services for the complete installation of the above work, in full conformity with the requirements of authorities having NYC jurisdiction.

Scope of Work: 27 Flores /High End Condominium

Work Includes:

(2,896) Total Sprinkler Heads

o(384) New Concealed

o(727) New Upright

o(13) Dry Sidewall-in the new Elevator Shaft

Connect New Piping into Existing Sprinkler Main as per plan.

Furnish & Install all new 6” Sprinkler Main Piping, as per plan.

Furnish & Install all new Sprinkler Branch Piping, as per plan.

Furnish & Install all new 6” Fire Stand Piping, as per plan.

Furnish & install(1) Fire Pump, 750 GPM, on Cellar, as per plan

Furnish & Install (1) Special Service Pump, as per plan

Furnish & Install all Galvanized Drain piping, asper plan.

Furnish & Install all 6” FIRE Standpipe Risers, as per plan

Furnish & Install all Sprinkler Risers, as per plan

Furnish & Install all Sprinkler Drain Risers, as per plan

Furnish & Install all Floor Control Valve Assemblies, w/TS and WFS, as per plan

Furnish & Install all PRV, as per plan

Furnish & Install all 2 ” Fire Hose Valves, as per plan

Furnish & Install all Fire Hose Racks, as per plan

Furnish & Install all Fire Hose cabinets, as per plan

Furnish & Install all Riser Control Valves, as per plan

Furnish & Install all Check Valves with ABD,, as per plan.

Furnish & Install all Siamese Connections, as per plan

Furnish & Install all Test Headers, as per plan

Furnish & Install all Roof Manifolds, as per plan

Furnish & Install all Key Cabinets, as per plan

Provide SEISMIC Bracing, as per plan.

Provide Temporary Fire standpipe and Siamese connection

Provide Dropping off Temp Standpipe and Siamese

Provide Core Drilling and Sleeve setting

Provide Fire-stopping, Testing.

Provide Stock of Spare Sprinkler Heads as per Code.

Shop drawings and hydraulic calculations

Permit, controlled inspections and sign off.

One Hydro-test for third Part Inspection.

Not Responsible for defect on Existing Sprinkler System

EXCLUSIONS:

Removal of existing ceiling and grids

PW1 Filing, LAA Filing

Protection/Patching/painting of walls, ceilings

Concrete work

Painting of sprinkler pipe

Asbestos Abatement

Debris Removal

Demolition Work

Dust Proofing

Electric

Engineering

Existing System Repair & Replacement

Sprinkler Cost: $ 2,465,000.00

The Total Cost for Above Scope (Plumbing & Sprinkler) is $ 6,985,000.00

3rd Job at ENOBRAC

Project: 580 5TH AVENUE

Location: 580 5TH AVENUE

Scope of Work: 18th thru 20th Floor and 23rd thru 34th Floor

Sprinkler work as per plans SP-100 thru SP-110 dated on 12-09-2017, by AMA Consulting

Work Includes:

(1,074) Total Sprinkler Heads

o(1,043) Concealed

o(31) Upright

Connect to existing lines as per drawings, existing floor control valve assemblies to remain.

Furnish & Install (~3,400’) 2 ” Sprinkler Main, as per plan

Drop off Temp Loop

Extra Sprinkler Heads as per Code.

Shop drawings and hydraulic calculations

Permit, controlled inspections and sign off.

One Hydro-test for third Part Inspection.

Not Responsible for defect on Existing Sprinkler System

EXCLUSIONS:

Removal of existing ceiling and grids

PW1 Filing, LAA Filing

Protection/Patching/painting of walls, ceilings

Concrete work

Painting of sprinkler pipe

Asbestos Abatement

Debris Removal

Demolition Work

Dust Proofing

Electric

Engineering

The Total Cost for Sprinkler: $ 953,200.00

Jobs at PACE Plumbing & Sprinkler

1st Job at Pace

Project: Empire Outlets

Location: 15, 15B, 35, 35B,55 Richmond Terrace

Scope of Work: 4 Levels, (4 Quadrants each Level)

Sprinkler work as per plans SP/SD-111 thru 114, 121 thru 124, 131 thru 134, 141 thru 144, 151 thru 154 dated on 08-15-2014. By TMP Architectural LLP.

Work Includes:

(7,642) Total Sprinkler Heads

o(104) Concealed

o(3,411) Upright

o(4,074) Dry Upright

o(53) Sidewall

Furnish & Install all 4”, 6”,8”,Fire standpipe, as per plan.

Furnish & Install all 2”, 3”, 4” Sprinkler Main piping, asper plan

Furnish & Install all 4”, 6” Insulation, asper plan.

Furnish & Install 4” Heat tracing, as per plan

Furnish & Install, 2” 3”Galvanized Drain piping, asper plan.

Furnish & Install all 2” 3” 4”Floor Control Valve Assemblies, w/TS and WFS, as per plan

Furnish & Install all PRV, as per plan

Furnish & Install all 2 ” Fire Hose Valves, as per plan

Furnish & Install all Fire Hose Racks, as per plan

Furnish & Install all Fire Hose cabinets, as per plan

Furnish & Install all 4” 6” Riser Control Valves, as per plan

Furnish & Install all 6”, 8” Check Valves with ABD,, as per plan.

Furnish & Install (4) Siamese Connections, as per plan

Furnish & Install (2) Test Headers, as per plan

Furnish & Install (2) Roof Manifolds, as per plan

Furnish & Install (12) 6”Dry Valves, as per plan

Furnish & Install (2) Fire Booster Pumps, 1,000 GPM,, as per plan

Furnish & Install all Key Cabinets, as per plan

Furnish & Install all Expansion Joints, as per plan

Furnish & Install all 6”Sleeves and Core Drills, as per plan

Provide Sleeve setting

Provide Shanties

Provide Temporary Dry Standpipe and Siamese

Provide BIM Coordination

Extra Sprinkler Heads as per Code.

Shop drawings and hydraulic calculations

Permit, controlled inspections and sign off.

One Hydro-test for third Part Inspection.

Not Responsible for defect on Existing Sprinkler System

EXCLUSIONS:

Removal of existing ceiling and grids

PW1 Filing, LAA Filing

Protection/Patching/painting of walls, ceilings

Concrete work

Painting of sprinkler pipe

Asbestos Abatement

Debris Removal

Demolition Work

Dust Proofing

Electric

Engineering

Existing System Repair & Replacement

Any additional sprinkler heads that may be required by Code but not shown on design drawings.

The Total Sprinkler Cost: $ 5,698,000.00

2bd Job at PACE

Project: SL GREEN REALTY CORP.

Location: 10 East 53rd Street

Plumbing

Plumbing work as per plans P-001, 201, 301 dated on 03-25-2015 by MICHAEL NEUMAN Architecture LLC

Scope of Work: Cellar thru 4th Floor & Roof / Residential New Building

Work Includes

Furnish & Install (31) Plumbing Fixtures with New Roughing-in, as per plan, as follows:

o(8) Water Closets,

o(12) Lavatories

o(4) Bathtub

o(3) Showers

o(4) Kitchen Sink

Install (5) Washer/Dryers (Supplied by Others) and their associated piping, as per plan.

Install (4) Dishwashers (Supplied by Others) and their associated piping, as per plan.

Furnish & Install all Floor Drains, Area drain & Trench Drains and all their associated piping, as per plan.

Furnish & Install (1) 2" DCDA Wilkins 350 XL, as per plan.

Furnish & Install (1) 4" House Sewer Trap, as per plan.

Furnish & Install (1) 4" House Strom Trap, as per plan.

Furnish & Install (1) 2" Water Meter, as per plan.

Furnish & Install all Vacuum Breaker sand Hammer Arrestors as per plan.

Furnish & Install (4) Gas Fired Water Heater- RHEEM RTG-64DVLNric Water Heater - HUBBELL MODEL HE30- 4 KW, 30 Gallons, as per plan.

Furnish & Install all Domestic CW and HW piping, and their Risers, as per plan.

Provide Insulation for all Domestic Water Piping, as needed.

Furnish & Install (1) Elevator Sump Pump, as per plan.

Furnish & Install all Storm Piping and Storm pipe Riser as per plan.

Provide Insulation for all Storm Piping, as needed.

Furnish & Install all Sanitary Piping, and Sanitary Pipe risers, as per plan.

Furnish & Install all Vent piping, and Vent pipe Risers, as per plan.

Furnish & Install all Gas piping, and Gas pipe Risers, as per plan.

Furnish & Install all Plug gas valves,, as per plan

Furnish & Install all Gate Valves, Ball Valves, Solenoid Valve and Check Valve, as per plan

Furnish & Install all Core Drilling as needed

Labor, Testing, Core Drilling as needed.

Fire Stopping

All hangers, support, elbows, tees etc.as needed.

Shop Drawings

Permit, controlled inspections and sign off.

EXCLUSIONS: Plumbing

Patch floor slab by others

All wiring of fixtures

All concrete work

All final grading & compaction of slab

Welding

All cutting/ Patching/ Restoration

Asbestos testing & abetment

Any drilling thru structural members

Flashing and waterproofing

Third party inspections

Utilities

Excavation

Protection/Patching/Painting of Walls, Ceiling

Debris Removal

The Cost for Above Scope (Plumbing) is $ 381,600.00 (Three Hundred Eighty One Thousand Six Hundred Dollars).

Sprinkler

Sprinkler work as per plans SP-100, 101, 200, 201,300, 301, 400, 401, dated on 11-27-2017, by MICHAEL NEUMAN Architecture LLC.

Scope of Work: Cellar & 1st Floors

Work Includes:

(118) Total Sprinkler Heads

o(76) New CONCEALED

o(20) New Pendent-Upright

o (3) New Upright

o(3) New Sidewall

o(2) Window Lot line Concealed Heads

o(2) Window Lot line Upright Heads

o(6) Window Lot line Pendant Vertical-Sidewall Heads

o(6) Temp Upright Heads

Furnish & Install (~60’) 2” Temp. Core Sprinkler Piping, on 1st Floor Only.

Furnish & Install (~440’) 2” Sprinkler Loop Piping, as per plan.

Furnish & Install all branch sprinkler piping, as per plan.

Furnish & Install 2” Drain Piping, as per plan.

Furnish & Install 3"Sp. Main Piping, as per plan

Furnish & Install 4"Sp. Main Piping, as per plan

Furnish & Install (2) 3" FCVA with TS & WFS, on Cellar, only.

Furnish & Install (1) 2" FCVA for Building Service Cellar Area, on Cellar, only.

Relocate (1) 2-1/2" FCVA for Stairwell, on Cellar, only.

Relocate 4" Sprinkler Riser from 1st floor down to Cellar, as per plan

Relocate 2" Drain riser from 1st floor down to Cellar, as per plan.

Furnish & Install all branch sprinkler piping, as per plan.

Core Drilling as needed.

Fire stopping as needed.

Drop off Temp Loop.

Demolition: Remove Existing Sprinkler Heads-Cut & Cap. Dropping off pipes by others

On Cellar existing 4" Sprinkler Main and 3" FCVA will be used for Temp.

Sprinkler Core System and will be removed after Completion of Work

Provide Core drilling, Sleeves, Fire stopping

Provide Testing.

Provide Stock of Spare Sprinkler Heads as per Code.

Shop drawings and hydraulic calculations

Permit, controlled inspections and sign off.

One Hydro-test for third Part Inspection.

EXCLUSIONS:

Electric Bell

Removal of existing ceiling and grids

PW1 Filing, LAA Filing

Protection/Patching/painting of walls, ceilings

Concrete work

Painting of sprinkler pipe

Asbestos Abatement

Debris Removal

Demolition Work

Dust Proofing

Electric

Engineering

Existing System Repair & Replacement

Any additional sprinkler heads that may be required by Code but not shown on design drawings.

The Cost for Above Scope (Sprinkler) is $ 88,900.00 (Eighty Eight Thousand Nine Hundred Dollars).

The Total Cost for Above Scope (Plumbing & Sprinkler) is $ 462,100.00 (Four Hundred Sixty Two Thousand One Hundred Dollars).

Jobs at DRILLON

Drilon Mechanical & Heating Inc.

Plumbing & Sprinkler Contractor

Sept. 24, 2014 6115 15th Avenue Brooklyn, NY 11219

Tel: 718-***-****; Fax: 718-***-****

E-mail : ac680g@r.postjobfree.com

Suffolk County : LIC = 50521-MP

A.J.S. Project Management Inc. BFP Tester = 8973

Larry Volkerick/ Anthony Sclafani III Z.C. Master Plumber

149 Fifth Avenue, 11th Floor Town of North Hemstead,

New York, NY 10010 Nassau County : LIC = 2141P

Tel: 212-***-****

E-mail: ac680g@r.postjobfree.com

Bids Due Date : 09/25/2014

Proposal

Re: 1350 Union Turnpike, New Hyde Park

New York, 11040

Attn: Mr: Larry Volkerick / Mr. Anthony Sclafani III

We herwith submit our Cost Propsal for (Plumbing & Sprinkler) for the above mentioned Project

All work shall comply with local codes and will be performed in accordance with plansissued for bid (P-001, P-002, P-100, P-101, P-102, P-103, SP-001, SP100, SP-101, SP-102, SP-103, SP-104) dated on 08/05/2014, and in cordination with all other trades . The Contractor shall provide all labor, materials, equipment and services for the complete installation of the above work, in full conformity with the requirements of authorities having NYC jurisdiction.

Scope of Work

Plumbing

Furnish & Install ( 4 ) Sinks and their associated piping as per plan.

Furnish & Install ( 4 ) Water Coolers and their associated piping as per plan.

Furnish & Install ( 7 ) Handycap Water Closets and their associated piping as per plan.

Furnish & Install (10) Water Closets and their associated piping as per plan.

Furnish & Install ( 5 ) Urinals and their associated piping as per plan.

Furnish & Install ( 1 ) Handycap Lavatory and their associated piping as per plan.

Furnish & Install ( 13) Lavatories and their associated piping as per plan.

Furnish & Install ( 4 ) Drinking Fountains and their associated piping as per plan.

Furnish & Install (11) Floor Drains, and their associated piping as per plan

Furnish & Install ( 8 ) Clean Out Deck Plates, and their associated piping, as per plan.

All Drains shall be 3” in size.

Provide Hose Bib in areas with Floor Drain..

In Toilet Room Install Hose Bib Connection Under Lavatory sink,.

Furnish & Install ( 2 ) Ejector Pumps “Federal Pump”,Model # VF-2, 15 GPM, 0.5 HP, with Tank, as per plan.

Furnish & Install ( 1 ) Duplex Sewage Ejector Pumps “Federal Pump”,Model # VSA-4F-2-4,100 GPM, 2 HP, as per plan.

Furnish & Install ( 2 ) Elevator Sump Pumps “Stancor”,Model # SE-50O/MELV,, 40 GPM, 0.5 HP, as per plan.

Furnish & Install ( 1 ) Electric Water Heater “Lochnivar” Model# ETT040KD, 40 Gallls, 30 GPH, 5 KW, 150 PSIG, as per plan.

Furnish & Install ( 2 ) Electric Water Heaters “Lochnivar” Model# EJJ010CS, 10 Gallls, 18 GPH, 3 KW, 150 PSIG, as per plan.

Furnish & Install 2''Underground Waste piping, as per plan.

Furnish & Install 3'' Underground Waste piping, as per plan.

Furnish & Install 4'' Underground Waste piping, as per plan.

Furnish & Install 2'' Sewage piping, as per plan.

Furnish & Install 3'' Sewage piping, as per plan.

Furnish & Install 3/4'' Cold Water piping, as per plan.

Furnish & Install 2'' Cold Water piping, as per plan.

Furnish & Install 3'' Cold Water piping, as per plan.

Furnish & Install 1 1/2'' Cold Water piping, as per plan.

Furnish & Install 1/2'' Hot Water piping, as per plan.

All domestic hot water piping lnsulation shall be 1'' thick.

Furnish & Install 2'', 2 1/2'' Vent piping, as per plan.

Furnish & Install 3'' Vent piping, as per plan.

Furnish & Install 3'' Gas piping, risers included,from existing gas service to existing Boilers as per plan.

Risers

Furnish & Install 1 1/2''Vent Risers, as per plan.

Furnish & Install 2''Vent Risers, as per plan.

Furnish & Install 3''Vent Risers, as per plan.

Furnish & Install 4''Sanitary Risers, as per plan.

All Labor, Testing, Core Drilling and Signs are Included

All Fire Stopping for Vertical Holes only, no Longer than 6”inch.

Furnish & Install all hangers, as needed.

Furnish & Install Pipe Insulation as required on plans.

Remove Existing plumbing Fixtures and accessories .as per plan.

Re-route and/or cap all associated piping system to source, as per plan.

Remove existing water fountain pipe to source, as per plan.

Remove existing gas pipe to source. Exact location verify in field.

The Cost for Above Scope (Plumbing) is $ 215,000 (Two Hundred Fifteen Thousand Dollars).

Sprinkler

Furnish & Install (526) Sprinkler Heads and their associated piping, as per plan.

Furnish & Install ( 2 ) Floor Control Valve Assemblies as per plan.

Furnish & Install all Water Flow Switches as per plan.

Furnish & Install all Tamper Switches as per plan.

Furnish & Install all Valves,hangers and supports as needed.

The Cost for Above Scope (Sprinkler) is $ 125,000 (One Hundred Twenty Five Thousand Dollars).

The Total Cost for Above Scope (Plumbing & Sprinkler) is $ 340,000 ( Three Hundred Forty Thousand Dollars).

Another Job at DRILLON

October, 13, 2013

Drilon Mechanical & Heating Inc.

Plumbing & Sprinkler



Contact this candidate