Post Job Free

Resume

Sign in

Engineer Construction

Location:
Lagos, Nigeria
Posted:
September 26, 2018

Contact this candidate

Resume:

CURRICULUM VITAE

Surname:

Obasi

Other Names:

Magnus Udoezi

Date Of Birth:

24th March, 1975

State Of Origin:

Imo State

Sex:

Male

Marital Status:

Married

Telephone:

081********; 090********

E-mail:

ac66q8@r.postjobfree.com

Contact Address:

Soul Winners International Church

Plot C4/C5 Works Layout

Owerri

Imo State.

INSTITUTIONS ATTENDED WITH DATES:

Trinity Institute of NDT Technology,India

2014

University of Port Harcourt

2006 – 2008

University of Calabar

1992 – 1997

Ibeme High School, Mbano

1984 – 1990

Community School, Umueze II

1978 – 1984

DEGREE OBTAINED WITH DATES:

Master of Engineering(Gas Engineering Option) (to be awarded)

Post Graduate Diploma in Petroleum Engineering, 2008

Bachelor of Science Degree (honours) 22 (Chemistry) 1997

Class of degree:

PGD(Petroleum Engineering) Lower Credit

B.Sc (hons) Chemistry Second Class Lower

Trainings:

Operations and Facility management training. 2017

Project Management Professionals and Primavera P6 Training 2015

NDT Level II in

VISUAL TESTING

LIQUID PENETRANT TESTING

RADIOGRAPHIC INTERPRETATION

ULTRASONIC TESTING

MAGNETIC PARTICLE TESTINGO

HSE Development Competence Course Levels 2 and 3 (2011)

SPDC PTW System/JHA Training (2012 and 2013 respectively)

SPDC AHSS Training (2013)

WORK EXPERIENCE:

CRUSH ROCK INDUSTRIES LIMITED, ISIAGU, EBONYI STATE (2016 – 2018)

Position: LOAD-OUT SUPERVISOR (mine & quarry)

Duties:

Supervises and coordinates activities of workers engaged in operating machines and equipment to separate sand and granite according to size, and in testing, stockpiling, and loading sand and granite into trucks

Reviews truck loading orders and issues directions to workers to expedite truck loading

Notifies YARD ENGINEER to clean and position specified trucks for loading.

Determines causes of malfunctioning equipment and notifies MAINTENANCE-MECHANIC SUPERVISOR .

Orders changes in ratio of material, according to test results, to conform to plant or customer specifications.

Coordinates changes in plant setup to maintain production specifications.

Collects truck loading records at specified intervals and submits records to office

Maintains record of vibrating screen setup in plant. Trains new workers.

Performs other duties as assigned by Depot Manager

BAYWOOD CONTINENTAL LIMITED (2015 to 2016)

Position: 1. CONSTRUCTION SUPERINTENDENT(BONNY TERMINAL CRUDE OIL TANK REHABILITATIONS AND CONSTRUCTION. SPDC, BONNY ISLAND)

2. PLANNING ENGINEER (BONNY TERMINAL PROJECTS)

Duties 1. (CONSTRUCTION SUPERINTENDENT)

Delegation of responsibilities and ensure sub-contractors perform in accordance with requirements and construction procedures.

Develop the Daily work Plan and supervise execution to the letter.

Develop the project schedule with the Project Management Team (PMT), and the staff and contractors focus on safety and environment awareness

Lead company representative on site when the Project Manager could not be available

Oversee fabrications, construction, and hookup activities

Champion on-site safety awareness and safe performance with contractor and among Project Team members.

Provide construction core competency expertise when assigned to the function

Manage the construction organizational plans commensurate with the requirements of projects, and ensure that each personnel have a full understanding of the project execution plan and other information pertinent to construction execution.

Oversee the functional direction, coordination and performance of all on-site construction operations and support departments, including field management, quality, safety, material management, procurement, construction engineering, human resources, business services and facility turnover.

Approve expenditures and operational requests and implement quality management plan

Manage the construction budget, schedules, costs, progress, productivity, deviations, scope of work and any constraints, administering job site personnel, control all changes and scope of work and approve or release the appropriate personnel as necessary.

Contribute to short and long-term organizational planning and strategy

Develop an environment with systems and processes in place which will enable and encourage business opportunities.

Gives direction and leadership to workers assigned to the Daily Activities and tasks

Proof reads and make inputs on construction drawings before submission for AFC (Approved For Construction)

Project/Construction execution

2.(PLANNING ENGINEER)

Schedules, plans and oversees the entire program of work/construction using Primavera and MS Project

Plans, organizes, and coordinates planning activities

Selects the most appropriate techniques and logical sequence of activities to complete project scope

Inputs the work breakdown structure information to assess an accurate forecast on time,

Determines appropriate logistics solution in managing resources

Sets up alerts for all important contractual and milestone dates

Prepares cash flow, charts and histograms on planning projects

Monitors progress periodically and compares it with the baseline planning

Updates the schedule based on inputs received from project team

Prepares the daily/weekly/monthly Progress reports

Accumulates, collects and analyses data and information required for planning

SHELL PETROLEUM DEVELOPMENT COMPANY (2011 – 2015)

Position: QC ENGINEER, PIPELINES/TANKS REHABILITATION(TK 14,16,23)

Duties:

Carry out all QC/Inspection functions on BOGT crude oil tank rehabilitations process in compliance with approved standards (ASNT, API, DEP(shell standard of quality))

Adequately reports to Project Engineer through the CSR every change request and cordinate inputs making sure they are adequately discussed and closed out during technical and progress meetings.

Investigates and resolves Corrective Action Reports (CAR’s) as assigned.

Carries out Receiving Inspection on materials, which might include the review of the accompanying MTR (Material Test Report) and comparing same with the DBI (Data Base Information) to determine other relevant information such as the dimension specifications, measurements and tests required to ensure quality and SPDC satisfaction.

Ensure that only appropriate monitoring and measuring devices are used in accordance with their measurement capability. To also ensure that measuring uncertainty, limitations or restrictions regarding usage are identified on each device,

Ensure that proactive action is taken to recalibrate all monitoring and measuring devices before their due date and maintain the calibration records throughout the life of each device

Supervises fabrication processes in line with approved standard and drawings

Ensure establishment and proper implementation of adequate control processes within the Contractor, as stipulated in the Project Plan and the Project Quality Plan

Review Contractor’s quality audit schedule, monitor Contractor’s audit program, and participate in selected audits

Manages multiple interfaces to achieve timely delivery while minimizing potentials for contractor downtime and claims

Promote safety within area of cover and take part in the daily tool box meetings.

Review and evaluate Contractor’s and Suppliers’ quality documents for accuracy and adequacy.

SHELL PETROLEUM DEVELOPMENT COMPANY (2008 – 2011)

Position: Statutory Inspector (Bonny Terminal Integrity Team)

Duties:

Tank Integrity Inspection

i.Full external visual inspection according to check list.

ii.Prepares inspection reports to indicate nature of repairs and replacements required and to specify safe limits of temperature and pressure to follow pending repair of unit.

iii.Recommendation for Storage tank required repair actions

iv.Follow up and approve action items close out by the maintenance sections, operations and engineering and project teams.

v.Tank full internal/external inspection, rehabilitations condition survey inspections.

vi.Tank hydrotest after major repairs.

In Plot Piping.

i.Total visual inspection of all pipelines and piping within BNAG, new and old fuel gas plant.

ii.Take baseline wall thickness measurement by conducting Ultrasonic measurement of pipeline and in-plot piping within the terminal of all vessels.

iii.Issue the required action items and follow up and approve its close-out.

Statutory Inspections

i.Inspects construction and installation of new mechanical equipment for conformity to specifications.

ii.Reports need for immediate repairs

iii.Installs and positions new or replacement parts, components and instruments.

iv.Store data and status of relieve valves, pressure vessels and lifting equipment.

v.Procure specifications of spares (blind flanges, gaskets, bolts, nuts, etc).

vi.Assist and record statutory inspections of relieve valves.

vii.Repairs, servicing, and replacement of relief valves

FEDEX REDSTAR EXPRESS LIMITED, NLNG MAIL RM, Bonny Island (2003 – 2006)

Position: Operations Supervisor/Courier

Duties:

Shipment tracking and tracing.

Prompt delivery of all shipments under custody

Generation of delivery reports and ensuring proper documentation in line with standards of the company

Document control

Coordinates operations at all areas under coverage.

Behavioral Competencies:

Team Player: Always willing to be involved in other activities to achieve company objectives.

Initiative: Understands and seeks to minimize waste in resources and processes.

Customer Focus: Takes time to question and understand the real, underlying needs of the customer, beyond those initially expressed.

Leadership skills: Communicates and gains team commitment to a vision, able to motivate staff and provide direction and vision

Effective Communication skills: Able to adapt communication to audience and create detailed written documents and reports. Able to maintain and manage communication links with a variety of stakeholders.

Problem Solving: Looks objectively at every side of an idea or situation to ensure that all outcomes are thoroughly assessed before deciding on an appropriate course of action

Knowledge of:

HSE and PTW systems

Applications of relevant procedures and standards

Project Management as well as Operations and Facility Management

Ability to:

Manage interface with various stakeholders( Operations,HSSE,Community Relations)

Lead, motivate, coach and develop the technical skills of site construction team

Ensure operational plans are aligned with business objectives

Contribute to functional strategy development

Understand the business with in depth functional expertise

Conduct NDT on materials

Read process diagrams.

Maintain detailed and accurate records; prepare clear and concise written reports.

Personal Attributes:

Sound administration skills with an understanding of the importance of paperwork and the accuracy and timeliness of submission of same

REFEREES:

Engineer Clement Ike

Maintenance Unit

Central Bank of Nigeria

Uyo

080********

Caroline Benstowe

SHE Inspector

BOGT,Shell Petroleum Development Company, Bonny

080********

Kingsley Okpara

MD, ONKA Concepts

48 Coat Street,

Surulere

Lagos.

080********



Contact this candidate