CURRICULUM VITAE
PRESENT ADDRESS
WAZID ALI
MOB NO. ++919********* OR +919*********
EMAIL ID. **********@*****.***
********@*****.***
PIPING ENGINEER
Objective
A resourceful, result-oriented, professional with demonstrated ability in identifying potential strategic opportunities and implementing comprehensive section plants to achieve objectives strong work ethics as well excellent inter perusal and organization skills and to get into a challenging creative and growth oriented position in industry the offer professional growth while being resourceful and innovative and to contribute my knowledge, skills and passion for the benefit of organization.
PERSONAL SKILLS
Good communication skills, extrovert, honesty, integrity, sincerity, couple with my committed to hard work from my basic strength dedicated toward my work and capable of understanding any engineering works and possess excellent communication skills, team work and management skills, can undertake charge of large project from project management, planning, execution and handling over. Executed satisfactory large oil & gas / power plant / petrochemical refinery and construction projects worth millions of Dollars.
ROLE
Working as part of the project manager team, reporting to the project Director, the lead piping engineer is responsible for all aspects of the project relating to services the role includes the management of the mechanical team to ensure that the day to day duties are performed professionally and expeditiously to support the ongoing progress of the project.
Personal Details
Name
:
Wazid Ali
Father Name
:
Abdul Wahab
Date Of Birth/ Place
:
15.02.1982 / Siwan Bihar
Marital Status
:
Married
Nationality / Religion
:
Indian / Islam
Languages know
:
English. Hindi. Arabic
Educational Qualification
S S C PASSED
Technical Qualification
Diploma in Mechanical Engineering
Computer Qualification
Basic knowledge of computer & MS Office
Permanent Address
Villa – Musehri
P.O – Sirisiyan
District – Siwan
State – Bihar 841413
Mob No – 099********
Passport Detail
Passport No
: N 8392588
Place of Issue
: Patna
Date of Issue
: 24.02.2016
Date of Expiry
: 23.02.2026
Total Experience : 10 Years
Experience in Gulf : 9 Years
Experience in India : 1 Years
Summary of Experience
More than 10 years of working experience in the field of installation, maintenance & serving industry and petrochemical refinery / oil & gas / power plant projects and construction.
Gulf Experience
Client -PUNJ LLOYD LTD.
Period- From 08.01.2017 TO 31.08.18
Project- Refinery ( Rapid )
Job Title- Piping Engineer
Duties & Responsibility-
Strong supervision skills in fabrication of pipe works as per issued construction drawing.Monitoring and Supervised erection of piping on site as per site isometric and plan drawing.Monitoring the job as well as responsible for quality workman ship in job.Achieving productivity improvements & eliminating non-value added operations. Taking daily progress reports from supervisor, foreman and lead man.Able to prepare punch list of line prepare the line for hydrostatic testing as per approved hydrostatictest package and marked on the isometric and P & ID drawing for the limit of test.Conducting hydrostatic test in accordance with the approved hydrostatic test procedure.Always instruct the people about safety and quality. Report immediately pipe line major problems day to day minor problems rectified.Look after site progress and coordinate with manpower. Also always think about people safety quality and productivity. To follow and check the erection and installation of mechanical equipment and piping work likevalves, fitting, tanks, vessels, pumps, separator, and associated supports for all equipment using ISO and P&ID drawing.To organize and prepare the startup activities.To order all materials as per site request and check if all materials and equipment are carried out as per standard specification (quality system, design, manufacturing and testing. I also involved in hydrostatic pressure testing of piping system using marked up P & ID and the version revision of each isometric covering the scope of the test.look after execution phase of the project or to be concise he takes charge on construction phase of the project Assisting construction team in reading drawings, locating the exact point of installation, supply and monitoring inventory Troubleshooting field raised issues and providing immediate solution to the execution team Monitoring the entire execution phase to make sure that the piping arrangements are exactly fabricated and installed as given in the drawings Verify the requirements of vent and drain more than specified in the drawings to facilitate the hydro testing and any other testing on demand from unit Ensure that safety measures are considered during construction and permits are granted after safety inspection Co-ordinate with operation and maintenance team to ensure that the unit requirements are met during construction Review drawings and study the site condition in prior to the construction phase to mobilize tools and man powers as necessary as required Follow up with quality inspection team to examine that the weld joints are tested for its integrity Examining hydro testing process and approve the piping after completion of testing Driving the construction team to complete the job on time as planned by facilitating the need of the contractors Prepare documentation about the summary of the project, safety issues, lesson learnt & material balance inventory report Coordinating with operation team during the commissioning of the project Involve in HAZOP and HAZID studies with team of mechanical and process engineers.Familiar with ASTM, ASME, API, ANSI, NACE, & AWS code of standards.
Client -M.S.AL.SUWAIDI
Period -From 06.06.2011 TO 26.06.15
Project -0il & Gas
Job Title- Piping Engineer
Duties & Responsibility-
Work as Piping Engineer to lead a team of technical / manual personnel and maintain harmonious working relationship.Strong supervision skills in fabrication of pipe works as per issued construction drawing.Comprehensive experience in all aspects of executing large piping projects.I also was in charge with materials procurement and order materials I followed and check if all materials and equipment are carried out standard specification of quality system ( ISO-9001 design( ASME B31.3,ASME B31.1,ASME section VIII pressure vessels manufacturing (ASTM A36,A53,A307,and A335 MSS, testing. To plan & schedule labor, material and equipment efficiently and within set time frames.Planning of job in advance on the priority basis.Interpret instruction and related information into meaningful and accurate work directivedrawing and guidelines.proficient in understanding isometric, plan and piping and instrumentation drawing.Maintain effective line of communication between the implementation and execution function.Maintain effective coordination with engineering and other department to resolve problem and enable completion of projects on schedule. Ensure that the work is performed in line with the planning and within the approved procedures.Arranging equipment as per the requirements and priority of job.Monitoring the job as well as responsible for quality workman ship in job. Achieving productivity improvements & eliminating non-value added operations.Able to prepare punch list of line prepare the line for hydrostatic testing as per approved hydrostatic test package and marked on the isometric and P & ID drawing for the limit of test.Conducting hydrostatic test in accordance with the approved hydrostatic test procedure.To maintain and enforce a safe working environment to help maintain client satisfaction. Prepare all installation and selection documents for all mechanical equipment. Collaborate with team of designers to complete all mechanical capital projects and provide all engineering support. Prepare and design all construction bid documents. Provide support to all expense projects and maintain accuracy in all piping project and ensure compliance to all piping material specifications and maintain knowledge on all orders. Analyze all mechanical designs and prepare various concepts for piping designs and develop required mechanical drawings. Provide support to all purchase activities and evaluate all vendor submittals. Inspect all mechanical equipment and analyze all equipment and ensure adherence to all present technology. Provide assistance to all senior engineers and recommend improvements to all design and travel to site to analyze all equipment and maintain efficient relation with all plant personnel. Assist to make arrangements for all business trips for various departmental tasks and design all technical specifications and assist to procure and fabricate all materials. Coordinate with various teams to administer all assignments. Provide appropriate solutions for all parties and evaluate and analyze all client requirements and design all piping specifications for clients and recommend appropriate alternatives. Interpret all codes and maintain overall performance of all piping activities. Provide support to all CADD functions and develop and maintain all activities according to project schedule and prepare appropriate forecasts. Develop new methods to recommend improvements to all activities of piping section.Familiar with ASTM, ASME, API, ANSI, NACE, & AWS code of standards.
Client - CCIC QATAR
Period - From 06.05.2007 TO 28.01.2010
Project - QGX-11 Project
Job Title - Piping Engineer
Duties & Responsibility-
Worked under the chief project manager and supervision erection of pipe & installation of support as per drawing. I also was in charge with materials procurement and order materials I followed and check if all materials and equipment are carried out standard specification of quality system ( ISO-9001 design( ASME B31.3,ASME B31.1,ASME section VIII pressure vessels manufacturing (ASTM A36,A53,A307,and A335 MSS, testing. Look after site progress and coordinate with manpower.Also always think about people safety quality and productivity. .Report daily progress and make planning for next day.Always instruct the people about safety and quality. Able to prepare punch list of line prepare the line for hydrostatic test as per the approved testpackage and marked on the isometric & P& ID drawing for the limit of test. The scope of this project is to construct an additional liquefy process gas plant at existing old oneto increase the capacity.To coordinate and plan all activities of work and manpower. I also was in charge with following up and checking of punch list construction and fixing .look after execution phase of the project or to be concise he takes charge on construction phase of the project Assisting construction team in reading drawings, locating the exact point of installation, supply and monitoring inventory Troubleshooting field raised issues and providing immediate solution to the execution team Monitoring the entire execution phase to make sure that the piping arrangements are exactly fabricated and installed as given in the drawings Verify the requirements of vent and drain more than specified in the drawings to facilitate the hydro testing and any other testing on demand from unit Ensure that safety measures are considered during construction and permits are granted after safety inspection Co-ordinate with operation and maintenance team to ensure that the unit requirements are met during construction Review drawings and study the site condition in prior to the construction phase to mobilize tools and man powers as necessary as required Follow up with quality inspection team to examine that the weld joints are tested for its integrity Examining hydro testing process and approve the piping after completion of testing Driving the construction team to complete the job on time as planned by facilitating the need of the contractors Prepare documentation about the summary of the project, safety issues, lesson learnt & material balance inventory report Coordinating with operation team during the commissioning of the project Involve in HAZOP and HAZID studies with team of mechanical and process engineers. Familiar with ASTM, ASME, API, ANSI, NACE, & AWS code of standards.
Indian Experience
Client- U B Engineering
Period- From 05.08.2006 To 01.05.2007
Job Title -Site Piping Engineer
Duties & Responsibility-
Worked under the chief project manager erection of pipe & installation of support as per drawing.Reinstatement of all the lines system wise after hydro-testing and pre-commissioning activity andSupervision of finished work prior to offer for final system walk down. Conduct fit up and offer welding release inspection prior to full welding and ensure that onlyqualified welder are attending the job in accordance with approved WPS. Familiar with ASTM, ASME, API, ANSI, NACE, & AWS code of standards.
Job Profile
Hydro testing preparation, water filling, pressurizing and pre inspection prior to offer RFI to client.Pre-commissioning commissioning assistance.Raise technical query if required.Modification of piping according to revised isometric or site instruction.Preparing day work sheets.Initiate action or recommend solution to prevent the occurrence of any non- conformities relating to installation, inspection, testing and commissioning. Identification and acquisition of any control, process, equipment ( including inspection and testequipment ) fixtures. Resources and skill that may be needed to achieve the required quality.Daily reporting to higher authority about the progress of work. Supervision of quality of fabricated spool prior to Q c release for painting. Supervision fabrication and erection of pipe support and their alignment. Reinstatement of all the lines system wise after hydro-testing and pre-commissioning activity andSupervision of finished work prior to offer for final system walk down. Conduct fit up and offer welding release inspection prior to full welding and ensure that onlyqualified welder are attending the job in accordance w/ approved WPS.Preparation of shut down activities including site verification for tie -in technical modificationscaffolding tagging UT / MPI color coding removal of insulation and material tag. Resolving field problem and liaison with client and supervise mechanical crew. Prepare as built drawing and update documents. Familiar with ASTM, ASME, API, ANSI, NACE, & AWS code of standards.Well familiar with U/G, A/G, RTR, GRP, FRP, process piping piping materials and their codesof identification. Well knowledge of P&ID, GA drawing, piping layout, isometric, sketch matric. Coordinate the consultant for received the piping drawing planning for the jobs and for any technical classification of site modification from our section manager. Close monitoring for all activities like fabrication, fit-up, welding . QC releases site deliveryerection and fit-up and welding at site.Monitoring all project activities and conducting weekly / monthly meetings. I also was in charge with materials procurement and order materials I followed and check if all materials and equipment are carried out standard specification of quality system ( ISO-9001 design( ASME B31.3,ASME B31.1,ASME section VIII pressure vessels manufacturing (ASTM A36,A53,A307,and A335 MSS, testing.( ANSI)To organize and plan the work and manpower. To follow and check the erection and installation of mechanical equipment piping system using different pipe class ( carbon steel,, alloy steel, stainless steel and all types of valves and all types offittings,static & dynamic equipment like tank, vessels,heaters, separator. Pumps, compressors,and also associated supports for all equipment using the isometric and P&ID drawings.I also coordinate that all executive and administration activities that are going on in site and camp belongclient,contractor and vendor.
Declaration;
I hereby confirm that above information are true and correct to the best to my knowledge & belief. If selected I will prove best and be an asset to the company and will do my job sincerely.
Wazid ali