Resume

Sign in

mechanical maintenance engineering with 6 years experience

Location:
Bhubaneswar, Odisha, India
Salary:
30000
Posted:
June 23, 2018

Contact this candidate

Resume:

RESUME

DIPAK KUMAR SATAPATHY Address:

C/O – PREMANANDA SATAPATHY

A.T-GATANAI

P.O - GATANAI

P.S - MARSAGHAI

DIST - KENDRAPARA

STATE- ODISHA

PINCODE No - 754141

Mobile: 099********

ac5zmx@r.postjobfree.com

CAREER OBJECTIVE:

Looking for a challenging career that will provide me an opportunity to apply my skills for the advancement of the organization and my continued growth. To grow with the esteemed concern by continuous up gradation of new technology and increasing performance. I want to be part of a team where I will be able to learn, can work with best talents and at the same time add value to the organization.

PERSONAL DETAILS:

Name : Dipak Kumar Satapathy

Father Name : Premananda Satapathy

Date of Birth : 15th, Nov, 1983

Gender : Male

Marital Status : Unmarried

EDUCATIONAL PROFILE:

Passed Madhyamik Pariksha in the year 1999 under H.S.C with 73 % marks.

Passed Higher Secondary (10+2) in the year 2001 under C.H.S.E. with 45 % marks.

PROFESSIONAL QUALIFICATION:

Passed 4 years certificate course B.TECH (MECHANICAL) in the year 2009 with 63 % from COLLEGE OF ENGINEERING BHUBANESWAR under B.P.U.T ODISHA.

SUMMARY OF EXPERIENCE:

Name of Employer : EASTERN TRADE LINK (Jamshedpur based company

Name of Project : Tata Steel Kalinganagar

Name of Job associated : fire detection and protection system

Extensively associated with the development of the following jobs:

Labour handling

Work execution

Billing process

Maintainance of FIRE HYDRANT POST, FIRE HOSE BOX, FIRE HOSE REEL, FIRE PUMPS (JOCKEY, ELECTRICAL, DIESEL), HIGH VELOCITY WATER SPRAY SYSTEM, MEDIUM VELOCITY WATER SPRAY SYSTEM

Name of Employer : ORISSA DISEL ENGINES PVT LTD

Name of Project : Tata Steel Kalinganagar

Name of Job associated : 40 MW DG PLANT STATION

Extensively associated with the development of the following jobs:

Maintainance of air compresser,lube oil heater,air bottle,engine starting air valve,pneumatic lube oil pump,fuel oil filter,light disel oil filter,lube oil filter change in 200KVA DG,lube oil cooler,high temperature and low temperature,water radiator,suction air filter,air washer,light disel oil purifier sealing test of engine cylinder,centrifugal pumps .

Maintainance of water pump,chain block maintainance .

General maintainance of 40MW DG power plant,routine maintainance of air filter.

Name of Employer : Larsen & Toubro Ltd. MMH IC

Name of Project : Tata Steel Kalinganagar

Name of Job associated : Blast Furnace of 3.2 MTPA capacity

Extensively associated with the development of the following jobs:

Job Planning

Job Monitoring

Sub-contractor billing

Site execution mechanical

Client billing

Preparation of all mechanical protocol in auto-cad related to Blast furnace

Daily progress Report Submission & Contractor bill Preparation

Maintaining all mechanical drawings as per DPR & Before issue of drawings to sub-contractors & subordinates once ensure any discrepancy in detail drawings and if any getting of resolution form EDRC.

Co-ordination with internal departments like safety, QA/QC, P&M, Stores to ensure smooth functioning of job.

Good Communication with client .

Name of Employer : CHENNAI RADHA ENGINEERING WORKS PVT LTD

Name of Project : Vedanta Aluminium Ltd, Jharsuguda, Odisha

Name of Job associated : Ash Handling Plant

Extensively associated with the development of the following jobs:

As a Operation Engineer, was responsible for

•Operating the flow pressure of centrifugal pump

•Operating the speed,power,voltage, current flow of pumps

•Operating the Electro Static Precipitator (ESP) System

•Operating the water level of various tanks

Operating the overall Ash handling & Coal handling of power plant

JOB DURATION

Works in ORISSA DISEL ENGINES PVT LTD as an Maintenance Engineer From 15.07.2015 TO 31.07.2016.

Works in L & T ltd as an Execution engineer and also worked for these following items - Sub contractor billing, Quantification, Estimation, Site execution, mechanical progress report since 2012 May to 2015 Feb - Kalinganagar TSL (Blast Furnace project).

Works in CHENNAI RADHA ENGINEERING WORKS PVT LTD as an Opration Engineer FROM Mar 2010 TO Mar 2011.

COMPUTER KNOWLEDGE

Microsoft Office

Microsoft Excel

Auto CAD

Internet

HOBBIES:

Listening music & Playing Cricket, Carom.

LANGUAGE KNOWN:

Odia, Hindi, English, Bengali.

STRENGTH:

Punctuality & Hard work.

DECLARATION:

I hereby declare that all the above furnished information is correct and to best of my knowledge

And belief.

DATE :

PLACE: JAJPUR Dipak Kumar Satapathy



Contact this candidate