Post Job Free
Sign in

Process Improvement Specialist

Location:
San Jose, CA
Posted:
June 21, 2018

Contact this candidate

Resume:

Kathy Alavi, PMP, CSSGB

San Jose, CA *****

*****.*****@*****.***

408-***-**** (m)

http://www.linkedin.com/in/kathyalavi

Senior Industrial Engineer with fourteen years of experience & strong track record in developing & implementing optimization algorithm & analysis to improve productivity & efficiency, reduce cost & generate revenue. Project Management Professional (PMP) & Certified Six Sigma Green Belt (CSSGB).

Areas of expertise include:

Lean Six Sigma methodologies, continuous process improvement

Process mapping, process documentation, SOP development

Metrics & Key Performance Indicator (KPI) development & periodic reporting

Optimization modeling & simulation

Facility layout & material flow analysis & design

Capacity modeling, bottlenecks & constraint analysis, Overall Equipment Effectiveness (OEE)

Advanced Statistics, forecasting & predictive analysis, risk analysis

Project management, project planning, time scheduling, resource & budget planning, progress reporting

Cross-functional team leadership

PROJECT ACHIEVEMENTS

Created fully customized, mathematically-based capacity planning models utilizing customers’ technical & contractual requirements that developed company strategies effectively

Modeled large scale inventory processes, collected & analyzed data to reduce $500K worth of inventory adjustment, generated strategic guideline to implement the recommendations

Eliminated inaccuracy in customer monthly & quarterly billings by developing analytical tools to process data & communicated the recommendations to upper level management & implemented the solutions

Identified root causes of unscheduled tool down events by using business intelligence tools & driving data analysis methods which improved equipment efficiency by 40%

Developed time scheduling & resource planning for projects with more than 5,000 activities by 95% accuracy

Created financial models to forecast weekly & monthly revenue with more than 98% accuracy

Improved cycle time by reducing waiting time & improving operational KPI’s by 25%

PROFESSIONAL EXPERIENCE

Apple Inc. Cupertino, California Jun, 2017 – Feb, 2018

Industrial Engineering Consultant

Create process maps for the current state operations, purchasing, shipping & receiving functions

Develop “Road map to 5S” for battery testing department, conduct lean & 5S trainings, execute 5S program at metrology lab & stock rooms

Conduct Value Stream Analysis, identify, measure & evaluate non-value add activities & make recommendation for reducing cycle time

Evaluate the existent Standard Operating Procedures (SOP’s) for battery testing department, analyze the gap between required & existent documents. Create & update new SOP’s by working closely with Subject Matter Experts (SME’s)

Design process map & material flow of a new facility & recommend solutions for storage, workstations & material handling systems

Analyze & estimate the required quantity of equipment in a new facility & design the layout of the new metrology lab

Create Proposal for process improvement roadmap at battery testing department, recommend optimization solutions for on-going processes, NPI projects & investment projects

BMC Building Material Pleasanton, California Aug, 2015 – Sep 2016

Industrial Engineer III

Led a lean-six sigma project from conception through implementation to save $500K worth of inventory adjustments

Created workflow, mapped current & future processes & developed requirements for new Fixed Asset system

Determined & developed statistical models to analyze & identify inventory improvement opportunities

Defined & implemented operational & financial metrics & KPI’s for 15 markets & 83 sites

Created project prioritization template for project managers to select high priority projects

Mapped & evaluated Design to Build (DTB) & Procure to Pay (PTP) workflows, identify process improvement opportunities & make recommendations

Developed office plan layout for new location

Medical leave of absence & family care leaves Sep, 2011 –July, 2015

Cypress Semiconductor San Jose, California Apr, 2011 – Aug, 2011

Operations Manager

Managed revenue & demand forecast of a $120M line of business. Interface sales & operations Managed built-plan for more than 2000 products per customers

Analyzed forecast defects & defined statistical analysis to improve forecasting models

Developed supply chain analytical reports

SVTC Technologies San Jose, California July, 2007 – Apr, 2011

Senior Industrial Engineer

Designed optimization model to identify optimum production rates for different business lines with capacity/demand constraints, applied sensibility analysis & made pricing recommendations

Created fully customized, mathematically-based capacity models utilizing customers’ technical & contractual requirements that developed company strategies effectively

Established a model to simulate the effect of process & technology variability on overall capacity, identified complexity effects, calculated Overall Equipment Efficiency (OEE) for bottleneck equipment & made recommendations to improve the overall capacity for future developments

Utilized Failure Mode & Effect Analysis (FMEA) to create a unique company-wide risk management model

Designed & developed metrics, Key Performance Indicators (KPI) & dashboards, managed weekly performance reports

Interviewed, trained & supervised junior engineers & new hires

Cognizant Technology Solution San Francisco, California Feb, 2005 – Apr, 2007

Assistant Director, Finance & Contracts

Stablished correct billing systems by collaborating with IT & finance departments, monitored progress of more than 40 active accounts, calculated monthly revenue of all projects, stablished a system to resolve invoice issues

Tracked contracts, generated & renewed Statements of Work (SOWs), estimated budgets, time & resources & calculated project pricing

Developed metrics to calculate the efficiency of engineering performance

Iran Offshore Engineering & Construction Company (IOEC) Tehran, Iran Sep, 1996 – Dec, 2001

Planning Manager

Developed & implemented projects plan for EPC (Engineering, Procurement & Construction) infrastructure projects

Developed progress measurement procedure &Coordination procedure for EPC projects

Created work breakdown structure (WBS), identified activities, resources & budget needed to implement project from start to end

Applied Critical Path Method (CPM) techniques, developed resource planning

Created metrics to measure physical progress, developed S-curves, standardized & updated progress reports

Monitored financial progress & provided invoice documents for clients, monitored consultants & sub-contractors’ invoices, assisted finance department in calculating project cash flow

Applied Critical Chain Method to develop project scheduling & resource planning for engineering & logistic projects

Developed proposals for projects pursuits

Ehdos Management Company Tehran, Iran May 1994 – Sep, 1996

Project Planner & Scheduler

Created master project plan for a mega project, including onshore & offshore facilities, introduced 22 sub-projects

Created standardize weekly progress report for more than ten active projects

Developed standardize method for WBS development, time scheduling & progress measurement techniques

EDUCATION

M.S., Industrial & Systems Engineering, San Jose State University, 2005

B.S., Industrial & Systems Engineering, University of Science & Technology, Iran, 1994

CERTIFICATIONS

Project Management Professional (PMP), Since 2014

ASQ Six Sigma Green Belt, Since 2010

APPLICATIONS

Minitab, JMP, Visio, OmniGraffle, Lindo, Primavera, MS Project, SAP, NetSuite, ARENA, PowerPoint



Contact this candidate