NAME

HIMANSHU BHUSAN PANI

EDUCATION

QUALIFICATION YEAR(S)

INSTITUTION

B.TECH., Mechanical Engineering, 2003-2007

Biju Patnaik University of Technology, INDIA

EMPLOYMENT HISTORY

POSITION YEAR(S)

EMPLOYER

Assistant Manager Piping within Industry and Energy department, 2016- Till date

IDOM

POSITION YEAR(S)

EMPLOYER

Manager Mechanical, 2013-2016

Tata Consulting Engineers Limited

POSITION YEAR(S)

EMPLOYER

POSITION YEAR(S)

EMPLOYER

Assistant Manager Mechanical, 2010-2013

Jindal Steel & Power Limited

Senior Engineer Mechanical, 2007-2010

Larsen & Toubro Limited, Engineering, Contracts & Construction Division

SKILLS & COMPTENCIES

MAJOR PROJECTS

CLIENT YEAR(S)

PROJECT

POSITION

DUTIES

* A professional with 11 years of experience in both Green & Brown Field Piping Project, Project Management & Coordination, Engineering, Quality & Contract Management, Budget and Billing in large scale industries like Steel, Mines & Metal, Process, Oil &Gas, Petrochemical.

* Review of Project technical documents and scope of project.

* Review and issue of Piping material specification and piping component datasheet.

* Piping general arrangement layouts, Isometric, Support details, Material take off, Equipment location plan, Tie-in Index & Tie-in Package.

* Review and approve vendor documentations for compliance with design and technical requirement.

* Preparation and review of piping material & valve datasheet, vendor technical specification.

* Review and provide input for P&IDs, PFDs & Plant Layout.

* Review and provide input to 3D Model from design, accessibility, Maintainability and constructability.

* Familiar with international regulations, codes and standards used for Project (ASME B31.1 & B31.3, ANSI, ISO, ASTM, API)

* Construction Supervision, documentation, inspection, Cold and Hot Commissioning,

ALGERIAN QATARI STEEL, ALGERIA, 2016-Till date

PMC & Engineering Services of 2.5 MTPA Gas based DRI, Rolling Mill (0.75 MTPA X 2), Wire Rod Mill (0.5 MTPA), 2 MTPA Steel Melt Shop & 5 Strand Billet Caster

Piping & Piping Equipment Responsible

Coordination of Piping and Piping Related Equipment’s Job of whole Plant including Gas based DRI Unit, Rolling Mill, Steel Melt Shop and Billet Caster.

Working with International Codes as ASME, ANSI, DIN, GB

Reviewing P&ID, 3D Model, Piping Specification & Piping MTO and providing comments to Design Group.

Co-ordinating with technology supplier for Basic & Detail Engineering and Plant Layout.

Verifying client interface, preparing scope of work, engineering estimates, inter-discipline co-ordination and schedule preparation and manpower forecast.

Providing technical assistance to the Piping Manager, Area Manager and Area Engineer and keeping them informed on matters relating to quality control.

Finalizing project schedule and delivery schedule as per project requirement.

Preparing and evaluate inspection and quality plans for site construction, manufacturer/supplier and conducting inspection.

Site Supervising of fabrication and erection of Piping and related equipment job.

Establishing with the client personnel, parameters on testing, installation and turnover of systems.

Determining area priorities for piping installation through consultation with Area Supervision.

Establishing communications with the Piping Design Group to resolve design problems.

Reviewing the project schedule and working with the Equipment & Piping Manager and Area Engineer.

Verifying Inspection Test Plan and Checklist based on specification of the project.

Performing inspection of all piping and related equipment work in progress on a continuing basis.

Witnessing Pressure test, Pickling, Flushing, reinstatement and completes final P&ID checks prior to turnover to the Client.

Assisting in solving piping construction and design related problems.

Issuing job wide inspection criteria that may be over and above the normal piping inspection.

Assisting project scheduling, tracking. Reporting weekly installed quantities to the Planning Manager.

Assisting Vendor in establishing pipe and piping components delivery priority.

Assisting Area Engineers on piping related problems to obtain vendor information, substitutions and other design related piping problems.

Determining the scope of any piping areas not shown on the normal piping drawings, such as venting, package unit interconnection piping and lubrication systems on equipment.

Analyzing the need for field shop spooling and assisting in determining the amount of piping to be shop fabricated.

Assisting Client in Commissioning of the individual Plant unit.

Ensuring the closing of the Punch list before Final Handover of the unit to the Client.

Maintaining proper documentation of Quality and Piping Testing related documents.

Certifying Milestone payment dossier and Progress Bill of Vendor referring to the Milestone Payment Agreement and considering the deliverables of the project.

Ensuring safe working environment in working site and reporting unsafe conditions and unsafe acts to HSE Manager.

Conducting daily co-ordination meeting with site construction personnel. Involve in weekly Progress Review meeting, monthly management meeting for deliverables of project in respect of Progress, Cost, Quality & Safety.

Co-ordination Cold Trail, Hot Trail sequence with technology supplier as per commissioning manual and project requirement.

Maintaining all required design and operation parameters as per project specification.

Completed pre-commissioning activities related to piping (Hydraulic/Lubrication, Gas, Utilities) and equipment.

Successfully completed the Cold/Hot commissioning of the Rolling Mill (75000 TPA capacity).

CLIENT YEAR(S)

PROJECT

POSITION

DUTIES

TATA STEEL LIMITED, INDIA, 2013-2016

Engineering & PMC Services of 1.5 MTPA Coke Plant Line Manager for Piping & Equipment job

Responsible for Piping & Equipment job of Coke Oven Battery, Anchorage System, Wet & Dry Quenching Tower, Coke Wharf, Coal & Coke Handling system, Propane dilution system, Hydraulic system of Charging & Pusher Machine, Compressor House and Fire Fighting system.

Discussion and finalizing for erection ad commissioning sequence along with client and technology supplier.

Involved Project Planning and schedule for Piping works.

Prepared installation sequence for Equipment and Piping.

Executed Fabrication and Erection of system wise piping and supervised well movement of spools to erection site.

Witnessed and reviewed NTDs and prepared Inspection Test Plan.

Coordinated with designer and technology supplier and solved technical issues.

Conducted Quality and Safety Audit and Daily & Weekly co-ordination meeting.

Involved in commissioning activity and maintained technical parameters prior to start-up.

Verified Vendor Project Progress quantity and Escalation quantity and certified the amount of Billing.

Involved with Coke Oven Battery Heating up with Technology Vendor.

Successfully commissioned 2 nos. of Coke Plants with Wet Quenching Technology and Coal & Coke Conveying System.

Acted as Coordinator for other discipline.

COMPANY YEAR(S)

PROJECT

POSITION

DUTIES

JINDAL STEEL & POWER LIMITED, 2010-2013

Erection & Commissioning of 1.8 MTPA Gas Based DRI Plant

Assistant Manager Piping

Executed fabrication, erection and pre-commissioning activities of Piping.

Independently and self-responsibly prepared comparative statement and conducting procurement negotiations for prices, terms & conditions for supply and payment and concluding agreements.

Involved in procurement materials related to piping job Such as Pipes, Pipe Fittings & Accessories, Manually, Mechanically and Pneumatically Operated valves.

Performed in selection of Turnkey Contractors and Site Contractors.

Prepared Project Schedule and day to day erection & fabrication plan.

Ensured safety and quality of Vendor’s supplied equipment, site fabrication and piping works.

Conducted Piping Pressure test, Flushing, Air Blowing, Painting, Insulation and achieved desired parameters as per project specification.

Proper documentation of piping documents for commissioning.

Assisting Project Management covering all engineering phases from basic, detail, commissioning, and construction.

Maintained of Pre- and Post-order tracking of piping material and accessories for smooth progress of project.

Prepare Techno-commercial offer of different vendor for finalizing the materials and execution vendor.

Defined sub and major milestone of the project as per schedule.

Ensuring safe work environment of erection site.

CLIENT YEAR(S)

PROJECT

POSITION

DUTIES

VEDANTA ALUMINA LIMITED, INDIA, 2007-2010

EPC Services of 6 MTPA Alumina Refinery Unit

Project Engineer Piping

Executed various departments such as Planning, Fabrication & Erection for Piping works.

Prepared day to day and monthly schedule.

Maintained progress and quality record and conducted NDTs as per project specification.

Made the coordination with Client and Consultant for technical query and project progress.

Checking of daily, weekly & monthly progress against target.

Involved in manpower assessment and deployment.

Maintained vendor progress and certifying of construction vendor monthly bills as per progress.

Certified monthly Progress Bills.

Involved in manpower mobilization and well utilization of resources.

Erected of 9 Lakhs Inch Dia Meter in Yard Piping and 4.5 Lakhs Inch Dia Meter in Unit Piping safely.

Successfully executed 4 kilo meters Under Ground Piping of Dia 1500 MM including trenching, rapping, lowering, Hydro Testing and Back Filling.

LANGUAGES

LANGUAGE

LEVEL

English, Hindi

Spoken: Fluent; Written: High-level

I.T SKILLS

- MS Office, SAP MM-Module

- Navis Work Freedom, PDMS Review

- OS: Dos, Windows

CONTACT DETAILS

- Himanshu Bhusan Pani

- Mobile - +213-*****-**** (W), +91-889*-**-****(H)

- Email: - ac5yuy@r.postjobfree.com