Post Job Free

Resume

Sign in

Project Test

Location:
Quezon City, NCR, Philippines
Posted:
June 12, 2018

Contact this candidate

Resume:

PROFESSIONAL RESUMES

OF

LARRY M. CANUEL

CONTACT #: +639*********/+639*********

EMAIL ADD: ac5uem@r.postjobfree.com, ac5uem@r.postjobfree.com

HOME ADD: GC. Berberabe Subdivision Pallocan West

Batangas City Philippines

NATIONALITY: Filipino

D.O.B : 03/03/1975

POSITION: QC MECHANICAL/PIPING INSPECTOR

PIPING/MECHANICAL CONSTRUCTION SUPERVISOR

MECHANICAL ENGINEER

EDUCATIONAL ATTAINMENT:

B. S. Mechanical Engineering

Golden Gate Colleges (1993 – 1998)

Registered Mechanical Engineer (055342)

Technical Automotive Mechanics (1991-1993)

Pablo Borborn Memorial Institute of Technology

Qatar driving license: 275********

Valid until: 2017-03-22

Saudi driving license: 243*******

Valid until: 2019-03-26

AFFILIATION:

ASNT LEVEL II (PT, MT, UT, RT)

SUMMARY EXPERIENCE:

More than seventeen (17) years of working experience in various engineering practices, in field of piping supervision and quality control inspection, construction and project management for oil and gas industry, heavy fabrication yard inspection, onshore pipeline, construction and repair of tank and utilities. Extensive Field Pre commissioning & commissioning supervision. Supervising commissioning /start-up activities of process items systems. Managing interfaces with contractors for anything related to commissioning of the project. Managing/using progress monitoring tools for commissioning preparation and execution. Responsible for P & ID conformity check. Perform follow up of process punch list & Generate punch list clearance procedure use. Ensure all handover requirements are anticipated and that final handover of facilities is achieved without any delay. Strong commitment to Quality Environmental, HSE, Construction, project management experience includes; Erection and fabrication supervision, line checking prior to testing, re-instatement and System Mechanical Completion, punch listing, preparing punch list, Preparing progress in dia-inch (large and small bore/field welds and shop weld). Preparing field change request and attending meeting to coordinate on going piping problem. Interfaces QA/QC with emphasis of inspection and testing various piping and structural works and during pre-fabrication and erection. Always remember that safety is the number one priority.

WORK EXPERIENCES:

PILIPINAS SHELL PETROLUEM CORPORATION thru BRUNEL PHILIPPINES

PSP4 2nd Bottom Loading Gantry Project

SHELL REFINERY TABANGAO BATANGAS CITY PHILIPPINES

FEBRUARY 24, 2016 to NOVEMBER 30 2017

Site Construction Engineer/Supervisor

Duties and Responsibilities:

Lead contractors in field construction activities with high safety standards; ensure all construction activities are comply to authorities, industrial and company HSE standards and requirements;

Provide solutions to subcontractor’s problems in order to achieve the successful execution of the project.

Ensure site execution procedures are 100% applied to project works and are fully complied on construction work processes, project procedures and instructions within assigned operations.

Final review of contractor Method statement, ITP’s and Procedure.

Final review of technical queries/change requests have been incorporated in the field construction and included in red line drawings document submissions.

Attend Weekly Progress Coordination Meeting with EPCM contractor and Sub contractors regarding safety, progress and concern for project improvement.

Witness and inspection Pumps receiving, anchor bolts setting, pumps installation, alignment, levelling & centering and final torqueing.

Witness and inspections all Civil related activities like compressive strength testing for cylinder sample, material inspection, final elevation check, dimensional and lay out inspection of rebar for foundation, pre casting of structural base foundation.

Supervise and inspection structural fabrication and site installation as per project specification procedure and project quality standards..

Coordination with the contractors for all welding procedure specifications and procedures qualifications reports as per project specifications;

Witness all project related NDT as defined in ITP, Checking the hydrostatic test packages for NDT compliance prior to testing Witness shop and field pressure test for piping, static equipment;

Witness Flange Management Assurance prior to box up including flange face serration, gasket, bolt torqueing.

Lead material receiving inspection including arranging of PMI, Selection of welds for non-destructive testing, Review of the radiographic film and all NDT report;

Carry out progressive test / line check on completion of mechanical work and ensure that the contractors develop the punch list for follow up till completion before hydrostatic test and witness later;

Review test packages submitted by contractors for completeness and ensure as built make up is done and

Ensure that contractors and commissioning personnel carry out, witness and record all Piping check requirements in accordance with the agreed commissioning schedule and all record documentation is available on a timely basis to facilitate system and equipment handovers and start up.

Witness and inspection hydro test and pneumatic test, air blowing, inspection to ensure that all requirements are meet the project specification standards.

Conduct Pre Start up Safety Review with main contractor, subcontractor and operation & maintenance representative.

TECHNIP thru BUREAU VERITAS PHILIPPINES

Yamal LNG Project Fabrication Module

AG & P Yard, Bauan Batangas Philippines

April 09 2015 to November 30 2015

QC PIPING INSPECTOR

Duties and Responsibilities:

Witness and inspection both fabrication and site activities ensuring that project specifications are built to requirements.

Conduct daily inspection, monitoring and surveillance activities both fabrication and site which involves safety, piping activities, material and equipment preservation, proper implementation of approved welding procedures and specification is being carried out to jobsite.

Conduct daily inspection for lay out and cutting, fit-up, material inspection, dimensional, spool release activities prior to painting.

Coordinate to NDT subcontractor regarding RT joint, MT/PT joint, UT joint and PWHT joint. Witness hardness test execution, positive material inspection, penetrant test and magnetic particle inspection.

Review and conduct line check inspection to ensure it comply both Engineering and Quality requirements, prepare punch list, punch list clearing on test package issued to subcontractor prior to release for testing.

Witness and inspection hydro testing and pneumatic test inspection to ensure that all requirements are meet the project specification standards.

Witness and inspection reinstatement and close out activities of piping systems after completion of test as per approved drawings, specification and commissioning requirements.

Witness and inspection reinstatement and close out activities of piping systems after completion of test as per approved drawings, specification and commissioning requirements. Conduct final inspection for system mechanical completion certificate (SMCC) for system completeness and prepare punch list for those did not comply with company requirement and final verification upon correction for final approval.

JAPAN GAS CORPORATION (JGC) thru Velosi Certification Qatar

Ras Gas Barzan Project

Ras Laffan, Qatar

PMC Supervisor (Inspector)

September 20, 2014 to December 30, 2014

Duties and Responsibilities:

Prepare permit as per method of statement and to complete all the signatories and all the necessary document need prior to start the work. Conducts daily Toolbox meetings (15 crews) or pre-task safety induction with co-supervisors and subordinates for discussion of Safety procedures and Methods on how to complete the daily tasks safely and more efficiently.

Responsible in planning and execution of pre-commissioning and commissioning activity as per Method statement and Company requirements for each sub system. (Air blowing, Water flushing, manual cleaning, Vacuum and Borescope inspection). Ensure that all tasks are followed and performed according to Company/Client Policies and ensuring all SHES guidelines are followed.

Responsible for the preparation of required documents before commencing pre-commissioning/ commissioning activity for each sub systems assigned, such as Method statement, Job Safety Analysis, (MSDS) Material Safety Data Sheet, Site Instructions0

Prepares manpower lineup to fulfill the pre-commissioning/commissioning activity in right schedule, Coordinates with the other Departments / Agencies to resolve Interface problems.

Responsibilities include monitoring, installation and erection of equipment as per erection and installation procedure.

Check System completion thru line checking based on (AFC) approved for construction drawings such as Isometrics & P&ID of each Test Package, check latest drawing revision.

Witness and supervises the Installation of Flow orifice, Restriction orifice, Strainers, Sampling Probe Analyzer and Final Box up of Equipment, checks required specification based on System Drawings and manufacturer data sheet with QC/QA and Company Inspector.

Responsible in Piping re-instatement, installation of Control valves (PV, FV, SDV, BDV), Check valves, Thermowell, Rupture disc, Manual valves, TG, PG, PSV and PRV. Checks alignment, flow direction and high pressure side after pre-commissioning activity.

Supervises punch clearing for each sub system, checks for (DMCC) Dynamic Mechanical Completion Certificate for preparation of Commissioning activities.

Responsible in planning and execution of Commissioning activities such as System Leak Test, Integrity Tightness Test (HPLT), Air freeing and System drying, Nitrogen purging, Chemical cleaning, Degreasing, In Service test, Mechanical Test Run for pumps, blowers, pin fans, mixers.)

QATARGAS PMT (Velosi Certification LLC)

Qatar Gas Platuea Maintenance Project (EXXONMOBIL)

Qatar Gas Operating Company Ltd.

Ras Laffan, Qatar

Mechanical/Piping Inspector

February09, 2013 to June 30, 2014

Duties and Responsibilities:

Supervise and witness both fabrication and site activities ensuring that project specifications are built to requirements. Conduct inspection for sea water line piping (RTR/GRP) from fit up, bonding, support installation, flange management, bolt torqueing, punch listing, testing and reinstatement.

Review test package (documents and NDTclearance) prior to release for line walk dawn.

Review and conduct final line check inspection to ensure it comply both Engineering and Quality requirements, prepare punch list, punch list clearing on test package issued by contractor prior to release for testing.

Inspection and witness Hydrostatic test/Pneumatic testing of process piping, utilities piping based on test boundaries and limitation with in P & ID if matching with isometric drawings. Review and check calibration certificate of all gauges use in hydrostatic test or pneumatic test

Witness and inspection reinstatement and close out activities of piping systems after completion of test as per approved drawings, specification and commissioning requirements. Conduct final inspection for system mechanical completion certificate (SMCC) for system completeness and prepare punch list for those did not comply with company requirement and final verification upon correction for final approval.

Witness and Supervise Pre-commissioning and commissioning activities such as flushing/ air blowing, system tightness/leak testing and nitrogen purging of piping systems. Conduct line walk down for system that issued for High pressure leak test (HPLT) for final verification of issued punch list prior for release for testing.

Responsibilities include monitoring and inspection according to the Inspection and test plan for the entire Equipment erection and installation

QATARGAS PMT (Velosi Certification LLC)

Qatar Gas 3&4 LNG Project (SHELL and CONOCOPHILLIPS)

Qatar Gas Operating Company Ltd.

Ras Laffan, Qatar

Mechanical/Piping Construction Supervisor

August 1, 2011 to December 31, 2012

Duties and Responsibilities:

As client supervisor Supervise and witness fabrication ensuring that project specifications are built to requirements .Review and familiarize drawings, specifications, Procedures, Method of statements, Materials specifications, identifications, Quantities, locations, and documentations, prior to construction executions. Daily monitor the contractor progress, daily execution monitoring, assist in all permit issuance, plant access, and all needed work to facilitate easy construction work.

Responsible for implementing and setting example for safety excellence during constructon. Conduct a safety walkthrough, as well as safe and unsafe auditing.

Supervise fabrication and erection of pipe spools and pipe supports according to the latest construction isometric drawing. Coordinate among various construction subcontractor and discipline supervisor for the execution of piping works and verify the availability and adequacy of material. To monitor progress with schedule and updating to construction superintendent.

Day to day monitoring of permits to works for all construction activities if validated and all concerned signatories are completed prior to start to work. Day to day monitoring and participate on contractor and subcontractor daily tool box to remind safety and all concerns prior to start work

Witness and Supervise hydrotest preparation to make sure all test limits are followed as per blinding activities insure all that blind installed are followed the correct thick as per project standard. Ensure that P & ID and Isometric drawings are matching, venting location, all removable items are remove, followed the correct gasket rating and bolt requirements.

Witness and Supervise Pre-commissioning and commissioning activities such as flushing/ air blowing, system tightness/leak testing and nitrogen purging of piping systems. Conduct line walk down for system that issued for High pressure leak test (HPLT) for final verification of issued punch list prior for release for testing.

Work for start –up as construction supervisor as well piping inspector for piping work activities for operation isolation activities. Ensure proper materials bolt, gasket and proper torque value as per project specification requirement. Supervise and monitor all piping related activities like, strainer cleaning, Filter replacement, PRV and Control valve removal and installation after calibration.

Coordinate subcontractor for other activities like, bolt tightening group, scaffolding erection and dismantling, insulation removal and installation, crane arrangement which required before proceeding piping work activities.

Coordinate with Operation Shift supervisor which job is priority prior to their notification. Arrange work permit after job assessment prior to start work activities. Conduct safety tool box talk to discuss associated hazard within the work activities. Coordinate planner and maintenance supervisor for arranging materials to Warehouse.

QATARGAS PMT(Velosi Certification LLC)

Qatar Gas 3&4 LNG Project (SHELL and CONOCOPHILLIPS)

Qatar Gas Operating Company Ltd.

RasLaffan, Qatar

Mechanical/Piping Inspector

December 06, 2009 to July 31,2011

Duties and Responsibilities:

Conduct daily monitoring and survillance activities which involves safety, material and equipment preservation, proper implementation of approved welding procedures and specification is being carried out to jobsite. Check and monitor welder qualification, consumable storage and handling, issuance and returned record, welding equipment calibration certificate. Record inspection finding in job site, issue inspection report and non-conformance report (NCR).Maintain log for inspection reports and monitor close out of non-conformance reports and ensure all documents pertaining to inspection and quality control in a retrievable manner.

Inspection and witness Hydrostatic test/Pneumatic testing of process piping, utilities piping based on test boundaries and limitation with in P & ID if matching with isometric drawings. Review and check calibration certificate of all gauges use in hydrostatic test or pneumatic test

Review and conduct final line check inspection to ensure it comply both Engineering and Quality requirements, prepare punch list, punch list clearing on test package issued by contractor prior to release for testing. Witness hydro testing and pneumatic test inspection to ensure that all requirements are meet the project specification standards.

Witness and inspection reinstatement and close out activities of piping systems after completion of test as per approved drawings, specification and commissioning requirements. Conduct final inspection for system mechanical completion certificate (SMCC) for system completeness and prepare punch list for those did not comply with company requirement and final verification upon correction for final approval.

Witness Pre-commissioning activities such as flushing/ air blowing, system tightness/leak testing and nitrogen purging of piping systems.

QATARGAS PMT (Velosi Certification LLC)

Qatar Gas II LNG Project (EXXONMOBIL)

Qatar Gas Operating Company Ltd.

Ras Laffan, Qatar

Piping Inspector

September 19, 2007 to July 31, 2009

Duties and Responsibilities:

Surveillance and monitoring of daily welding and piping site and fabrication activities of subcontractor to ensure proper compliance of welding procedure specification and piping erection procedure.

Check and review welder qualification if meet welding procedure specification. Check and monitor consumables storage and handling, issuance and return slip of each welder. Check calibration certificate of welding equipment, electrode mill certificate.

Conduct inspection for sea water line piping (RTR/GRP) from fit up, bonding, support installation, flange management, bolt torqueing, punch listing, testing and reinstatement

Monitor proper welding shelter and proper pre-heating for each welder before start welding due to below zero degree temperature. Conduct daily inspection on material storage to ensure properly protected, and segregated.

Witness all PT and MT joints as well as repair with joints with partial excavation to ensure that defect was properly remove before re-welding.

Coordinate to NDT subcontractor regarding RT JOINT, MT/PT JOINT, UT JOINT and PWHT JOINT. Review and check test packages prior to hydro testing to check all NDE requirements meet as per project specification. Check and review isometric drawings as test loop requirement and boundaries if matching with welding history sheet.

Responsible for final line checking of test package upon release from construction line checking group to insure all adequacy and balances of line are properly installed as per each requirement. Inspection and Witness Hydrostatic test/Pneumatic testing of process piping, utilities piping, based on test boundaries and limitation within P&ID if matching with isometric drawings. Review and check calibration certificate of all gauges use in hydrostatic test or pneumatic test.

Witness Pre-commissioning activities such as flushing/ air blowing, system tightness/leak testing and nitrogen purging of piping systems.

Chiyoda Toyo Sakhalin Development (CTSD)

Client: Shakhalin Energy Investment Company and Shell (SEIC/SHELL)

Sakhalin lI LNG Plant and Oil Export Terminal Project

Sakhalin Russia

QC Piping/Welding Inspector

December 2006 to July 2007

Duties and Responsibilities:

Area lead piping inspector for a total of 6 piping Inspectors. Coordinate and allocate assignment for each. Attend weekly meeting with subcontractor regarding inspection issues.

Surveillance and monitoring of daily welding and piping site activities of subcontractor to ensure proper compliance of welding procedure specification and piping erection procedure.

Check and review welder qualification if meet welding procedure specification. Check and monitor consumables storage and handling, issuance and return slip of each welder. Check calibration certificate of welding equipment, electrode mill certificate.

Monitor proper welding shelter and proper pre-heating for each welder before start welding due to below zero degree temperature. Conduct daily inspection on material storage to ensure properly protected, and segregated.

Witness all PT and MT joints as well as repair with joints with partial excavation to ensure that defect was properly remove before re-welding.

Coordinate to NDT subcontractor regarding RT JOINT, MT/PT JOINT, UT JOINT and PWHT JOINT. Coordinate to client inspector regarding daily activities.

Review and check test packages prior to hydro testing to check all NDE requirements meet as per project specification. Check and review isometric drawings as test loop requirement and boundaries if matching with welding history sheet.

Responsible for final line checking of test package upon release from construction line checking group to insurer all adequacy and balances of line are properly installed as per each requirement prior to release to client for final inspection.

Inspection and Witness Hydrostatic test/Pneumatic testing of process piping, utilities piping, based on test boundaries and limitation within P&ID if matching with isometric drawings. Review and check calibration certificate of all gauges use in hydrostatic test or pneumatic test.

TOYO ENGINEERING, IDRO, JGC AND DAELIM ENGINEERING JOINT VENTURE (TIJD)

Client: Petro Pars Company Limited

South Pars Gas Field Development Phases 6 7 & 8

ASSALUYEH, ISLAMIC OF IRAN

QC INSPECTOR (Piping/Welding)

May 2005 to October 2006

Duties and Responsibilities:

Assign on fabrication yard ensuring that project specifications are built to requirements, dimensional and material inspection as per required on isometric drawing.

Assist Welding Engineer in performing welding Procedure Qualification and Welder Qualification Test. Check and review welder qualification if meet in WPS. Check and monitor consumables storage and handling, issuance, and calibration certificate of welding equipment, electrode mill certificate.

Conduct inspection on joint preparation, fit-up, pre-heating, protection and provision in case of rain, wind, low temperature condition and 100% visual inspection on welding joint. Monitoring of welder performance and capability of each welder on basis of radiography inspection test.

Witness all PT and MT joints as well as repair with joints with partial excavation to ensure that defect was properly remove before re-welding.Coordinate to NDT subcontractor regarding RT JOINT, MT/PT JOINT, UT JOINT AND PWHT JOINT. Coordinate to Client inspector regarding daily activities.

Review and check test packages prior to hydro testing to check all NDE requirements meet as per project specification. Check and review isometric drawings as test loop requirement and boundaries if matching with welding history sheet.

Responsible for final line checking of test package upon release from construction line checking group to insurer all adequacy and balances of line are properly installed as per each requirement prior to release to client for final inspection.Inspection and Witness Hydrostatic test/Pneumatic testing of process piping, utilities piping, based on test boundaries and limitation with in P&ID if matching with isometric drawings. Review and check calibration certificate of all gauges use in hydrostatic test or pneumatic test

HYUNDAI ENG’G & CONSTRUCTION

Client: SAIPEM /ENI COMPANY

South Pars Gas Field Development Phases 4 & 5

ASSALUYEH, ISLAMIC OF IRAN

QC Piping /Welding Inspector

January 2004 to January 2005

Duties and Responsibilities:

Assign on fabrication yard ensuring that project specifications are built to requirements, dimensional and material inspection as per required on isometric drawing.

Assigned in line checking of all pipelines as per test package. Prepare punch list of all line checked. Items that are to be installed as per isometric drawing based in P&ID. Rechecking of all punch items that require clearing prior to hydro test/pneumatic test.

Assigned to witness hydro and pneumatic testing. Checking all test boundaries as per P&ID requirement if meet in testing, all removable item and item to be blinded is in correct position as per isometric and P&ID. Checked all gauge to be use are calibrated.

Assigned in welding inspection of all joints as per daily welding report of sub-contractor, have daily surveillance routine, checked welder qualification, WPS use in production, types of consumables uses and handling of consumables. Coordinate to NDT contractor for RT joint, UT joint, PT and MT joints

McCONNELL DOWELL COMPANY LIMITED

Nam Con Son Gas Plant

Baria Vung Tau Province, VIETNAM

Client : British Petroleum Vietnam

QC INSPECTOR Piping/Welding

September 2002 to July 2003

Duties and Responsibilities:

Assign on fabrication yard ensuring that project specifications are built to requirements, dimensional and material inspection as per required on isometric drawing.

Checking that the welding procedure to be used are approved and duly qualified as required. Verify that the welders are qualified to the approved project WPS. Checking that only approved electrodes, filler wire, flux and gas to be used. Checking the adequacy of equipment for pre-heating, welding, heat treatments and weld examination.

Assist Welding Engineer in performing Welding Procedure Qualification and Welder Qualification Test.

Supervision of the welding activities, checking in the particular the adequacy of joints preparation, protection and provision in case of rain, wind, low temperature, etc. Inspection of weld, visual examination and test are carried out and documentation in accordance with “QCP”, “ITP” for site activities, verifying the inspection record and validating the relevant result. Monitoring the performance and capability of each welder on the basis of radiograph inspection/test. Review of all procedure & other doc relates in Mechanical Welding/NDE aspect.

Checking heat treatments for PWHT diagrams. Checking the correct measurements of hardness, when required, and the acceptability of the result. Checking the issuance of the document required by contract of project specification.

Filling/documentation and retaining of all NDT reports, heat treatments report and inspection reports. Informing QC Manager regarding of problems, which are required, their decision. Checking welding parameters as per WPS required. Checking welding equipment Calibration Cert. and Mill Cert.

McCONNELL DOWELL COMPANY LIMITED

Libjo, Batangas City Philippines

Malampaya Onshore Gas Plant and Pipeline

Client: Pilipinas Shell Petroluem Corporation

QC Piping/Welding Inspector

July 2001 to July 2002

Duties and Responsibilities:

Verify the adequacy of the Quality Control Procedure. Checking the inspection and test are carried out and documented in accordance with the approved procedure and quality plans. Monitoring/Inspection and test according to the approved “QCP” for plans activities, verifying inspection reports and valid result. Documentation/filling of all piping inspections record.

Review of test packages clearance/punch listing as per project as per project specification as per system before hydrostatic testing prior to pre-commissioning. Assisting of commissioning works as per plant activities.

Inspection of piping pre-fabrication/erection as per ITP, QCP, FQP. Dimensional checking of piping as per approved isometric drawings. Line checking of piping, review of test packages, punch list and carried out conforming with IFC ISO, P&ID and project specification prior to test

Checking heat number on required piping traceability. Checking of pipe support prefabrication as per approved construction details drawing. Checking of piping material as per piping materials specification (PMS)

Coordinate with QC Clients representative regarding mechanical piping design drawings for approval. Inspection of work produced to verify compliance with drawings, specifications, and quality system procedure requirements. Perform and witness all hydrostatic test/pneumatic testing of process piping, utilities piping, and power plant piping system as per ASME 31.3/31.1/31.4.Prepare punch list record to monitor the progress of works inclusive of balance of joints for testing.

Prepare non-conformance reports for discrepancies encountered during inspection an as per project specification. Updating QC documentation reports for filling. Reporting to QC Manager to discuss problems during inspection/surveillance.

CHICAGO BRIDGES & IRON PHILIPPINES (CBI Phils.)

Tank Construction and Repair

San Pascual, Batangas

Client: CALTEX REFINERY PHILIPPINES

QC Piping Engineer

February 2000 to March 2001

Duties and Responsibilities:

Prepare design drafting works of technical drawings for updating of piping, equipment layout, spool isometric, piping plan layout, instrument diagrams, detailing of pipe supports, update design drawings of process piping including as-built drawings and P&ID drawings for process plant.

Planning and scheduling of piping erection works based on approved piping erection schedule and availability of resources, manpower, tools and equipments. Monitoring of piping works progress and check productivity and submit daily progress reports to Site Construction Superintendent. Coordinate with all foremen in all aspects of piping activities in order to meet schedule. Initiate piping field change notice to verify to resolve erection problems. Coordinate to the material control supervision for the materials needed on site erection.

Responsible to review plan drawings to P&I Diagrams to prepare isometric drawing, material take-off



Contact this candidate