Post Job Free

Resume

Sign in

Engineer Mechanical

Location:
Samrala, Punjab region, India
Posted:
June 12, 2018

Contact this candidate

Resume:

SHYAM KRISHNA RAI (Piping Engineer)

ac5ueg@r.postjobfree.com

Mob:-+91-910*******

Synopsis

Having Over 6.0 + years of experience as project execution, fabrication and erection in piping and cross country pipe line, Commissioning, and also equipments erection and maintenance in oil and gas sector

As a mechanical engineer exprience in maintenance & erection of horizontal and vertical multistage pumps in FIRE WATER PUMPS HOUSE AND COOLING TOWER.

Currently associated with Aarvi Encon pvt.ltd. at BORL Bina.

Adept in managing erection, commissioning, & maintenance of various equipment’s like Material handling equipment, Pumps in fire water pump house compressor, pump in clorination unit of cooling tower etc.

Have Expertise in planning & scheduling, resource utilization, material management and manpower management, safety and quality standards.

Able to generate Piping drawing and ISOMETRIC for execution fabrication and erection.

Able to read all GA, Isometric & P&I'd drawings.

Professional Experience

As part of my assignment I have been in site execution as piping execution engineer(mechanical).My responsibility are -

a)Preparation of MTO.

b)Checking of isometric,P&ID drawing.

c)To provide safe site condition and make JSA with client prior to work.

d)Making a plan for month and all required resources to deplo to achieve it.

e)Cast minimization (consumables vs progress).

f)Proper care of machinery at site.

g)Proper materials tracking(fittings and all pipe materials) priortywise as per site requirement.

h)Attending progress review meeting in every week.

i)To take all quality noms as per standard.

j)Commissioning and hand over project.

EXPERIENCE CHRONOLOGY

Aarvi Encon pvt. Ltd. Bina. Since May 2018- to till date

Associated with project as senior piping engineer.

Client details

Bharat Oman refinery limited Bina (MP)

Responsibility

Site execution.

Client interaction at regular activities.

Contractor billing.

Checking drawing and make material request to achieve month target.

Proper supervision of all work quality on site during execution.

JMC PROJECT (INDIA) LTD. Jamnagar APRIL-2017-- Sept 2017

Associated with projects as Senior piping engineer.

Client Details

J3 project Jamnagar Gujrat.

Responsibilities:-

Maintain, adherence & training of safety work culture as prime responsibility.

Engineering document (GA, Detail drawing, P&ID, ISOMETRIC Drawing)review as per standard specification.

AG & UG piping erection as per ISOMETRIC and P&ID of utilities service .

Interpretation of drawings and guiding to contractor to execute work.

Spool fabrication as per site requirement on site.

Spool hydro testing .

Spool fabrication in fabrication shop as per ISO .

NDT witness of shop joint of spool and hydro testing of spool .

Spool dispatch to site.

Material selection and issue as per drawing requirement.

Installation and erection of support and also fabricate support in AG pipe line as per isometric drawing requirement.

Loop file clearance, ISO clearance, mechanical clerence by execution, quality and maintenance department for hydro test clearance.

All category punch point closed and completed all documents which are necessary before hydrtest.

Hydro test coordination.

Pneumatic test coordination.

Make day to day planning and monitoring to execute work at site.

Scrutinized the contractor monthly bill and submitted to site incharge.

Appraise to client about work progress and quality of work.

Daily follow up of executed work as per ITP.

GANNON DUNKERLEY & Co. LTD. April 2014 – March 2017

Joined as a Assistant engineer in RIL J3 project jamnagar.

Client details

Relaince J3 Project,Jamnagar Gujrat.

My Responsibilities

Execution,fabrication and erection of fire water line, and difference service network as per ISOMETRIC and P&ID drawing in UG and all activities conduct as ASME 31.3.

Executed to sea water line (9k.m.) having 66" dia going from Marine tank to rail load tank

Generate a MTO as per ISOMETRIC requirement and before execute to work ensure about all materials as per MTO requirement .

Execution and fabrication of HDPE Line of portable water line network and irrigation network

Hydro test coordination of irrigation network, fire water,and other services pipeline network.

Commissioning and loop handover to client.

Erection and installation of valves in Under ground network.

Execution, fabrication and erection of AG piping of different services.

Loop file clerence, iso clerence and mechanical clerence through execution, quality and maintenance department of client.

Hydro test preparation of AG piping network.

Material handling equipments as EOT crain installation,erection, commissioning and maintenance.

Installation and erection of piping network and equipments in clorination unit

Installation and erection of centrifugal (vertical pump of multistage where 7- diesel driven,7- electrical driven and 2-jocky pump) in fire water pump house.

Maintenance of vertical centrifugal pump in fire water pump house.

Execution and erection of fire water network piping in fire water pump house.

Commissioning of fire water pump house.

Execution of fire water network for cooling tower.

Horizontal centrifugal pumps maintenance and erection in cooling tower.

Execution,installation and commissioningof sluice gate inside fire water pump house pond.

Making AS BUILT drawing which required as per site requirement.

Raising MTO for all material which works execute as per onsite requirement and also for hydro testing requirement.

Fabrication and erection of collection tanks of ETP,WTP,& STP tank.

Installation of ETP,WTP & STP equipments and pump.

Preparation of Gantt chart,BOM,shop floor plan layout etc.

Wilson engineering. Aug 2011-Jan 2014

Joined as GET in third party payroll in Dadri-Bawana-Nangal natural gas pipe line .

Client Details

Gail (India) LTD.

My Responsibility

Execution and fabrication of pipe line as per ASME 31.8

Pipe line stringing plan execute as per safety norms.

Check and ensure about crane load capacity and crane radius capacity.

Fabrication of pipe line.

Familiar with all documents which is completed after fabrication.

Witness of NDT clearance of pipe line joint.

Witness and execute coating on joint of pipe line .

Witness of holiday test before erection of pipeline to ensure that pipe line is not to be damaged.

Trench backfilling after erection..

Line cleaning as piggins activities to be done before hydrotest.

Launcher and receiver header to be installed on Pipeline header.

Hydrotest water sample testing report collection.

Hydrotest preparation.

After hydrotest pipe line cleaning.

System / Equipment Knowledge:

Centrifugal pumps(Mechanical seal, Gland Type)

Screw Pumps

Vertical multi stage Pump

Dosing pumps

Fire Engine.

Tanks (Dome and Floating roof)

Planned shutdowns of hooking of new facility with existing network and commissioning

Achievement

Got appreciation certificate for maximum equipments installation in RIL J3 project

Technical qualifications

Auto CAD,MS office,excel.

MSME -development course.

Educational Credentials

Specialization

Institute

Division

Year of Passing

SSC

General

Higher secondary board of education allahabad up

Second

2001

HSC

Science

Higher secondary board of education allahabad up

Second

2003

B.E.

Mechanical

Goutam budha technical University Lucknow up

First

2011

Diploma

Mechanical

Board of technical education Lucknow up

First

2008

Additional information

Present CTC: - Rs. 4.8 Lacs pa

Expected CTC :- ( For dream job profile salary is not a constraint)

Joining Period :- 1 week

PERSONAL DETAILS

Father name - Nerendra Kumar Rai

Village. - Amila

District. - Mau

State. - UP

Declaration

I hereby declar that the above furnished information is true and to the best my knowledge.

Place BORL Bina (MP). ( Shyam Krishna rai)



Contact this candidate