Sumeet Adhikari
**************@*****.***
EDUCATION
The University of Texas, Arlington
Master: Construction Management
May 2018 // GPA (3.7/4.0)
University of Pune, India.
Bachelor: Civil Engineering
May 2015 // GPA (3.5/4.0)
SKILLS
(Technical)
• Primavera P6
• Auto CAD
• Revit
• MS Project
• Microsoft Office Suite
• Planswift
• Sage Timberline
• eTakeoff
(Interpersonal)
• Leadership
• Written/Verbal communication
• Construction contracts
• Negotiation
• Detail oriented
Certifications:
• Construction Manager in
Training (CMIT) -Construction
Management Association of
America.
• OSHA 10-hour.
• LEED-GA In progress
PROFESSIONAL EXPERIENCE
Tharwani Infrastructure- India.
Construction Intern // Feb 2016– July 2016
• Managed field crew and assisted in interpretation of specifications and drawings
• Supervised the construction work in compliance with engineering principles, company standards and customer contract
• Served as liaison between the project management team and contractor
• Managed project close-out and inspected subcontractor’s work
• Provided safety orientation training to prevent, detect, and correct unsafe conditions or safety violations
• Conducted onsite inspections of subcontractor’s work and provided daily report to the project management team. Ishwar Parmar Group- India
Jr. Trainee Engineer // July 2015 – Dec 2015
• Assisted in detailed cost estimation for concrete and reinforcement activities of the residential tower using Sage Timberline
• Independently interpreted, reviewed and processed the plans, RFI’s, Transmittal,change orders and safety documents
• Performed a cost analysis of the material invoices and achieved 15 % cost reduction by understanding the market rates and unit prices
• Developed and maintained an expediting schedule and list of material procurement for the construction project. ACADEMIC PROJECTS
Cost Estimation and scheduling for a 9’ Diameter Water Transmission Project: Dallas, TX ( $9.5 Million)
• Performed quantity takeoff for 4.7million CY of soil, planned and scheduled the project in 18 months using Primavera P6.
• Evaluated sustainability techniques and OSHA safety regulations during the excavation of 153 miles trench.
• Performed detail production and cost analysis for the equipment’s (Dozer, Hoe, Trucks etc.)
Cost Estimation and scheduling of a Park renovation project: Crowley, TX ( $1.9 Million)
• Prepared bidding package with detailed cost estimate and quantity takeoff of project referring construction drawings and specifications, used Sage-Timberline for cost estimation and Primavera P6 for scheduling.
• Communicated with subs and suppliers to clarify pricing information.
• Developed an estimate by encapsulating all project costs including subcontractor bids, material costs, equipment costs, bonds, overhead and profit margins