Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Ahmedabad, GJ, India
Salary:
500000
Posted:
June 08, 2018

Contact this candidate

Resume:

Curriculum Vitae

JALAM SINGH

Village- Balupura

Tehshil - Jaitaran

Dist.-Pali(RAJ.)

Pin code-306709

Email :ac5sq4@r.postjobfree.com

Mobile +91-875*******, 805-***-****

OBJECTIVE

To obtain a challenging position in the area of POWER and ENERGY and strive for excellence with dedication, proactive approach, positive attitude and passion towards the work that will fully utilize my logical and reasoning abilities in the best possible way for the fulfillment of personal and organizational goals

SYNOPSIS

Young, energetic and result oriented professional with 5.11 Years of experience; strong academic background; Extended expertise in Operation of thermal power plant

Possessing first rate communication and collaboration skills to lead and work in concert with diverse groups effectively

Adroit at learning new concepts quickly, working well under pressure and communicating ideas clearly and effectively

Dedicated and highly ambitious to achieve personal goals as well as the organizational goals

Friendly with an upbeat attitude

Excellent decision making skills with a positive approach

EDUCATION

Diploma in Electrical Engineering from BTER Rajasthan June 2011-12 1st division (66.61%).

Passed 12th from R.B.S.E. Ajmer - 1st division (65.81%).

Passed 10th from R.B.S.E. Ajmer2006 - 1st division (76%).

Second Class Boiler Attendant Certificate From Rajasthan Board-2014.

WORKEXPERIENCE

Total Exp. - 5.11 Year

PRESENT WORKING GROUP :-

Presently Working with Nirma Group Industries Ltd. Bhavnagar Gujarat 82 MW (CFBC)Power plant from 2-March -2017 to till date As a Boiler desk operator.

COMPANY NAME NIRMA

BOILER MAKE IJT (Capacity-410 TPH-Re-heater type-CFBC)

TURBINE BHEL(RPM-3000-Surface condenser )

DCS ABB

M.S.PR. 145 Bar

M.S. TEMP 540 0 C

PAST WORKING GROUP:-

Worked with OPG Power Gujarat.2*150MW (PF BOILER) Power plant from 1-oct-2014 to 31-Jan.-2016- Enmas India Limited(O&M)

1-feb-.2016 to 27-Feb.-2017-OPGS POWER. As a Assistant engineer in operation (Turbine & Boiler) in OPG Power.

COMPANY NAME OPG POWER GUJRAT

BOILER MAKE BHEL (Capacity 510 TPH-Re-heater type-PF-BOILER)

TURBINE BHEL( R.P.M. 3000-Air cooled condenser)

M.S.PR. 138 Kg/Cm2

M.S. TEMP 540 0 C

Worked with Thermax ltd site J.K White Cement Gotan (Rajasthan) in 8 MW (AFBC) Power Plant from July-2012 to15-September- 2014. As a Boiler desk Engineer.

BOILER MAKE THERMAX (CAPACITY-32TPH-AFBC)

TURBINE HANGZHOU (CHINA)

M.S. Pr: 66 Kg/Cm2

M.S. Temp 4900 C

BOILER OPERATION:-

Responsible for the smooth operation of CFBC boiler From Desk and field. Compounded with Turbine with Air cooled condenser(ACC) and Surface condenser.

Responsible for the smooth operation of PF boiler from field.

Responsible for the smooth operation of AFBC boiler From Desk and field.

Cold Start up, Hot Start-up, Warm start up, Normal Operation, Emergency Handling and Safe shut down of Units.

Line up of the unit and its auxiliaries, Change-over of equipments, routine testing of protection system and annunciation system.

Issue and cancellation PTW (Permit to Work) system, safe isolation, personnel safety and equipment safety.

Monitoring plant operations and handle emergencies including shut-down of units and load throw-off to control generation as per requirement.

Instruction to Field operators for safe operation of Power Plant

Smooth startup and shutdown of boiler whenever required & to supervise site operators

TURBINE OPERATION:-

Manual Load Control with Hot well level& Dearator level maintain, Unit Synchronized.

Heaters charging from steam and water.

Vacuum pulling. Proper controlling of steam, water & oil system. Controlling various parameters of boiler & turbine within specified limit through D.C.S.

Air cooled condenser maintenance and operation

Operation of turbine auxiliary like AOP,MOP,EOP Overhead tank, Governor, Centrifuge machine, Ejector, GVC,LP heater etc.

Turbine heat rate and Boiler efficiency calculation and process losses

Having experience of turbine start up and rolling process.

Starting and stoppage of turbine during shut down and during emergency also

PLANT COMMISSING WORK:-

Work in 82 MW Project-410 TPH CFBC Boiler in Nirma Limited Bhavnagar Gujarat.

Boiler refractory and refractory dry out work.

Line fleshing and Line hydro test work

Equipment Trial work (All motor, control valve, mov )

Steam blowing work

Personal Profile:

Name: Jalam Singh

Father’s Name: Sh.Nain Singh

D.O.B. 17/05/1990

Sex: Male

Marital Status: Married

Permanent address: Vill.-Balupura, Tehshil-Jaitaran, Dist.-Pali (RAJ.)Pin code-306709



Contact this candidate