Post Job Free

Resume

Sign in

Project Quality

Location:
Muscat, Oman
Posted:
June 07, 2018

Contact this candidate

Resume:

CURRICULUM VITAE

FAIZAL P.A Email : ac5r8g@r.postjobfree.com

Mobile : +919********* ac5r8g@r.postjobfree.com

+968-********/+968-********/+968-********

CAREER OBJECTIVE:

To seek a challenging Position in the field of QA / QC Third party Inspection of, new construction / Equipment / Materials and Co-ordination with Vendors, Review of Vendor documents and procedure for the supplied items / Equipment’s as per relevant procedures / Company Sales OR Purchase order. Also in the field of Plant and Maintenance Inspection of Pressure vessels, piping, pipeline, structures, Review of proposed WPS / PQR / WPQT, Welding & NDT plan and Inspections, providing the opportunity to make a strong contribution to organizational goal through a continual professional development of Professional skill.

CAREER SUMMARY:

ONSHORE EXPIERIENCE- 13.5 YEARS

OFFSHORE EXPIERIENCE- 2.5 YEARS

13 Years of experience in the field of Oil & Gas, Petro chemical Industries and Power plants in Asian countries in QA/QC, Engineering and Inspection activities such as Co-ordination with Vendor procedures / supplied Equipment’s / Materials Inspection as per company requirements and also in Maintenance / Repair Inspection in Pressure Vessels, piping / pipeline related activities and Codes / Standards are Known ASME Sec II, V, VIII, IX, B31.3, B31.4, B31.8, B16.5, AWS D 1.1 API 1104, API 510, API 570 & API 650

EDUCATIONAL QUALIFICATION:

DME- Diploma in Mechanical Engineering.

TRAININGS AND CERTIFICATION:

CSWIP 3.2.2 Senior Welding Inspector ( Cert. No. 64794)

CSWIP 3.1 Certified Welding Inspector (Cert. No.: 40013)

BGAS Grade 2 Painting Inspector (Cert. No:598820)

ISO 9001 Lead Auditor Training

ASNT LEVEL-II in RT, UT, PT & MT

Qatar Driving License

Tropical BOSIET with EBS & Travel Safely by Boat (OPITO Approved )

H2s Safety Awareness (OPITO Approved )

WORK EXPERIENCE:

Company :PDO Oman

Location :Fahud,Oman

Designation :Sr.Pipeline inspector

Period :March 2017 till date

Project :Khulud Gas Development Projects

Responsibilities

Review of Quality documents and give comments as per codes and company specifications

Review of QCP/ITP are as per Company Specification and International codes

Witness Procedure Qualification for Mainline Welding using Internal clamp/ External clamp/ Full penetration Repair/Partial Penetration repair/Cap Repair

Witness and Record all essential variables as per QCP and Method statements

Verify Incoming Materials are carried out as per QCP, certificates shall be available with all required details

Verify All Parameters are followed and Applied as per Approved WPS

Verify All documents are Approved and ready for work with code status

Monitor for parameters before,during and after welding are followed and recorded

Verify all Instruments are calibrated and updated,Reference stickers shall be posted and available on the equipment’s used (Equipment Verify log shall be maintained)Certificates shall be available and checked prior to use

Verify All essential data’s are recorded and shall be made available in the reports

Perform visual inspection prior to welding,at each intervals/pass and after final completion prior releasing for Radiography

Witnessing of Fit-up as per WPS and alignment check as per ITP.

Ensuring pre heating temperature to be within the limits of the approved WPS.

Ensuring Oxygen PPM levels within the limits of WPS before starting of Root Welds.

Perform Inspections as per QCP on Behalf of PDO

Witness Mechanical testing

Daily surveillance shall be done and record the data’s if any deficiency is observed

Attend Quality meeting with Vendor/Sub contractor /contractor and discuss all related issues and quality documents are available

Assist Sr.QA in preparing the documents and review of the same

Ensure all activities are carried out with safety plans, Housekeeping shall be maintained at all times

Verify all the reports /records after the completion of Mechanical testing of both CS- and DSS

Witness Procedure Qualification for Heat shrink sleeves for Polypropylene (PP) and Polyethylene (PE)

Ensure safety measures are in place for coating works

Verify and record all data’s during application of coating from blasting till application of HSS

Witness Destructive testing of HSS as per QCP and DEP

Monitor Welder performance records are maintained for the repair rate and status

Closely monitor the repair rate monthly wise, also verify with Daily production for monitoring of welder performance

Remove welder immediately if the repair rate goes beyond company specification and Project KPI ( key Performance Indicator)

Necessary training shall be given and record all variables during training with Radiographic results.

Issue NCR if any Nonconformance to the project specification are observed at site

Proper close outs of NCR’s with RCA ( root cause Analysis ) corrective and preventive actions are taken in place, Close out meeting shall be conducted with related personal who are involved to share information and to avoid re-occurrence

Maintain all quality related documents are in place and with latest updated version

Ensure Approved documents/drawings are used with status code

Daily Review of Radiographic films

Analyze and report quality welds are given in the project, if not necessary actions shall be taken

Attend stage wise inspection from beginning till the end as per Approved QCP

Ensure Request for inspection are raised and verify all documents are mentioned as per requirements of project specification

Company :NCOC .N.V( North caspian Opertaing Company)

Location :Karbatan Onshore/Kashagan Offshore

Designation :Qc Inspector (Welding/Painting/NDT)

Period :13 July 2015 to 20 Sep 2016

Project :Kashagan Development

Material used :API5LX60+clad UNS 625

Project Description : The Kashagan field includes the production of crude oil and gas from the reservoir by a combination of offshore processing facilities and pipeline systems to transport the crude oil and gases from the Kashagan oil field, located in the north Caspian Sea in the Republic of Kazakhstan, approximately 80 km south east of the town of Atyrau, to a new Onshore Processing Facility (OPF), 40 km east of Atyrau, where the oil and gases will betreated and conditioned for custody transfer to in-country infrastructure by onshore dedicated oil and gas export pipeline systems.

The overall pipeline system from the Kashagan fields, Island D, offshore facilities to the OPF presently

Comprises two dedicated 28” oil and gas pipelines, about 95 km long, running in a northerly direction with an offshore length of approximately 66 km and an approximate onshore length of 29 km, including 3 km in swamp area. To provide fuel gas to the offshore process facilities an 18” fuel gas pipeline is also installed, in the same pipeline corridor and parallel to the 28” pipelines, from the OPF to offshore process facilities.

Two fiber optic cables are also installed for communication and control purposes between the OPF, the valve stations and the offshore facilities at the D-Island Central Control Room

RESPONSIBILITIES:

Review of Project specifications & Procedures.

Inspection carried out as per the approved ITP & Quality Control Procedures.

Witnessing Material Receiving inspection for the CRA Clad pipes, Valves, Flanges, Elbows Etc.

Witnessing of Pipe for Calibration by using Automatic Pipe Checker laser measurement tool.

Witnessing of Welder Qualification Test as per applicable code & Specification.

Witnessing of Mechanical Testing and reviewing the reports.

Witnessing of Pre production testing welds as per the specification.

Witnessing of Dye Penetrant Testing for each CRA Clad pipe bevel ends before fit up.

Witnessing of Manual UT for Clad Disbond and Lamination Check.

Witnessing of Residual Magnetism checking for the bevels before fit up as per approved procedure.

Witnessing of Fit-up as per WPS and alignment check as per ITP.

Ensuring pre heating temperature to be within the limits of the approved WPS.

Ensuring Oxygen PPM levels within the limits of WPS before starting of Root Welds.

Monitoring Interpass temperature to be within the limit as per approved WPS.

Internal Root Weld Visual Inspection Carried out after completion of Root and Hot pass for GMAW Process Mechanized Welds by using INTERNAL LASER CAMERA. Witness of IVT after Root and Hot pass (Internal Visual Test ) using Video camera

Familiar with SWS ( Saipem Welding System)

Internal Root Weld Visual Inspection carried out by Root Open Window for Manual GTAW process welds.

External Weld Visual Inspection carried out for GMAW, SMAW Process Welds.

Calculating Heat Input Energy for each welded joint.

Interpretation of Intermediate RT films for Root & Hot pass and Final RT films for Full welds.

Witnessing/Interpretation of UT, MPI, LPI as per Applicable code and specification.

Witnessing of Partial weld repair and Cap weld repair as per ITP & WPS.

Witnessing of DPT for weld repair Excavation.

Witnessing of In Process Touch Up repair welds by using GMAW process.

Ensuring Minimum required of remain ligament weld deposition thickness for Repair Welds.

Witnessing of Internal Root Repair Back welds by using GTAW & PLASMA process.

Internal root weld visual inspection carried out for the root repair welds.

Reviewing & Monitoring Welding Parameter records for the Full completed and repair welds.

Monitoring of calibrations for Equipment’s, Inspection Instruments etc.

Reviewing of Daily Welding reports and NDE reports from Sub contractor.

Attending Meeting with Respective Section Engineers & Sr Quality Engineers.

Conducting Tool Box Meeting with Welders & field Supervisors.

Day to Day Inspection Status reporting to Quality Coordinator.

Issuing of NCR to Site Sub contract Construction groups.

Reviewing the String release for Lowering Dossiers.

Monitoring of Welder Weekly Performance and Repair Percentage.

Review of Pipeline Hydrotest Packages & Get approval from client.

Witnessing of Pipeline Cleaning and Hydrotest.

(Cleaning, Gauging, Flushing, Filling, Stabilization, Pressurization, Swabbing).

Performing Pipeline Walk down Inspection for Issuing punch list and Follow up.

Review and Submission of Final QC Dossiers.

Review of project specifications & procedures.

Inspection carried out as per the approved ITP & Quality Procedures.

Witnessing Material Receiving Inspection for the CRA Clad

Witness of Fit-up check as per ITP

Responsible for yard and field ongoing activities for painting inspection.

Ensuring the correct and valid calibration status of the inspection equipment.

Raise RFI’s to client inspection department through project management

Witness & Inspection for Field Joint Coating.

Physical examination of the surface to be insulated is clean, dry and free from other foreign matters. .

Monitoring / Maintain Log & Storage Conditions of Coating / Painting Consumables as per the Project Specification.

Carry out PQT prior to production as per required the Project Specification.

Carry out Training & Qualification of Blaster & Applicator Personnel as per the Project Specification.

Inspection carried out as per the applicable inspection Test Plan & Project Specification.

Witness Destructive and Non Destructive Test.

CANUSA HSS & RAYCHEM HSS for Pipeline Field Joints

Ensure that weather conditions (viz. Relative Humidity and Dew Point) are suitable for surface preparation and paint application.

Inspection of Blasting & Painting Activities in the Firing Line and fabrication shop.

Ensure that the surface cleanliness and surface profile of blast-cleaned surface are in accordance with the specification requirements.

Ensuring the required safety standards during all the stages of Coating / Painting operation.

Company : ZADCO Secondment Through DNV-GL

Location : South Island, Abhudhabi Offshore

Designation : Qc Multi Discipline Inspector (Welding/Painting/NDT)

Period : Aug 2014 to 03 July 2015

Project :UZ750 (Upper Zakum Project ) The project comprises engineering, procurement, modules and buildings fabrication, transportation, construction and commissioning of island surface facilities (EPC-2) on four artificial islands. Specifically, this will include cluster manifolds, crude oil process facilities, water injection and gas lift, oil export pumps, power generation and associated utilities

RESPONSIBILITIES:

Read and clearly indentify the conflict between the reference documents and approved drawings and shall apply stringent or precedence criteria as per the project specification

Monitor Mechanical activities and ensure that inspections are carried out as per approved ITP.

Ensure the correct application of Project Quality Plan and the implementation of the relevant procedures, Quality Control and Safety Plans.

Material Identification and traceability review and verification of MTC.

Ensuring that the correct revisions of drawings and procedures are being used for fabrication.

Verify calibration of equipment and inspection tools.

Verify the qualifications of inspection personnel’s, welders and NDT operators.

Witness PQR’s, Welder Qualifications, and Mechanical testing.

Organizing and witnessing various types of NDT as required.

Witnessing the Hydro test for CS/AS Piping /GRE/GRP/HDPE

Read and Verify the Piping is installed and routed as per Piping P&ID

Coordinate with client and third party inspection agencies to check &record welding parameters and verify compliance with approved Welding Procedure Specifications (WPS) and technical procedures. Liaison with Client and Third Party Inspection.

Execute Quality Activities as per Approved ITP.

Dimension inspection before welding and during Fit-Up as per Approved Drawings

Review of Radiographs

Visual inspection of welds as per Project specification

Verify test Packs are as per project specifications/signed and properly documented

Verify Contractor documents are as per Company specifications and updated with latest revision are properly traced and well documented

Company :DNV-GL

Client : Oman Oil Company Exploration & Production

Location :Kasab,Musandam

Designation :Plant Inspector

Period :April 2014 to June 2014

Project :MGP Base Line Survey of Newly Installed Pressure Vessels, Heat Exchangers, Columns, and Slug catcher, Initial UT Reading of CML’S ( Corrosion Monitoring Locations )

Company :Adinin Sdn Bhd

Client : Brunei Shell Petroleum

Location : Offshore, Brunei

Designation : Senior Inspector(Welding/Painting)

Period : June 2013 to Jan 2014

Project : Offshore Maintenance, Installation,Hook Up,New construction & Extension of Platforms ( Piping/Structural/Vessels/Module) etc

WORKED FOR FOLLOWING YEARLY SHUTDOWN ACTIVITIES –

CPCA07 CAMPAIGN SHUTDOWN

CPCB07 CAMPAIGN SHUTDOWN

MGCX01 CAMPAIGN SHUTDOWN

SECX01 CAMPAIGN SHUTDOWN

AMCX09 CAMPAIGN SHUTDOWN

AMCX06 CAMPAIGN SHUTDOWN

FACX04 CAMPAIGN SHUTDOWN

QA/QC INSPECTION OF MATERIALS, WELDING, NDT PLANNING AND ARRANGEMENT, NDT INTERPRETATIONS &EVALUATIONS, PAINTING AND PROGRESSIVE AND FINAL DOCUMENTATION AND COORDINATE WITH CLIENT FINAL INSPECTION, PRE-COMMISSIONING AND START-UP OF PLATFORM.

HIGHLIGHTS OF EXPERIENCE IN MAJOR PROJECTS IN BRUNEI

PROJECT WORK DETAIL:

MPM – CHAMPION WATERFLOOD MAJOR PROJECT – QA/QC INSPECTION OF MATERIALS, WELDING, NDT PLANNING AND ARRANGEMENT, NDT EVALUATION, PAINTING AND FINAL AND PROGRESSIVE DOCUMENTATION SUCH AS ITRs IN ISO PACK / MC PACK CLOSED-OUT AND COORDINATE WITH CLIENT IN INSPECTION AND PRE-COMMISSIONING OF SYSTEMS WORK PACKS:

RESPONSIBILITIES:

Carry out regular external visual examinations complemented with NDT examination as required on company equipment such as vessels,boilers,heat exchangers,piping,lifting equipment, Risers, Structures according to company established policies and procedures and issues inspection reports.

Co-ordinate with Vendors, Review of Vendor document and procedure for the supplied Equipment / items as per Company’s Purchase order.

Review / Prepare and execute Inspection plans in conjunction with Maintenance and operation Department.

Maintain company’s Inspection filing system and update next Inspection due dates and equipment history.

Performing pressure vessel internal assembly visual Inspection, thickness survey, preparing anomaly reports, repair recommendation and follow-up.

Entering plant equipments, observing conditions, making preliminary interpretations and issuing recommendations.

Deploying Inspection / NDT personals during Campaign Shut down and maximize the Inspection activities parallel with Plant maintenance construction work. Updating previous anomalies and recommend to repair / rectify this unplanned work, with available resources and if, time permitted.

Maintain and update all Inspection documents as needed and develop and /or review repair recommendations to ensure compliance with engineering standards, applicable codes and original design.

Maintain facilities and equipment as well as other Inspection tools and equipment in clean and operational condition.

Organizing and witnessing various types of NDT as required.

Witnessing the Pneumatic/Hydro test for Piping and equipment

Witnessing the Leak test for new Piping system prior to handover to plant.

Witnessing sub-sea pipeline hydro test / leak test and verifying / reviewing final documentation.

Riser Inspection / Repair recommendation / follow-up for repair work and Review NDT.

Witnessing the Surface preparation and paints mixing / thinning process.

Painting Inventory and material expiry check.

Visual Inspection of coating and verifying the coating thickness WFT/DFT as per project specification.

Holiday testing of Vessel Internal painting.

Raise Noncompliance reports where applicable and ensure the requirements are fulfilled satisfactorily and closed out.

Compiling final documentation and updating in the system

.

Company :Cairn Energy India Ltd

Location :Barmer, Rajasthan

Designation :Qc Coordinator(Welding/Painting/NDT)

Period :Sep 2012 to May 2013

Project :Mangala, Bhagyam & Aishwarya Piping works from Wells to Manifolds, Pipelines to MPT Terminal

Roles & Responsibilities:

Monitor Mechanical activities and ensure that inspections are carried out as per approved ITP.

Ensure the correct application of Project Quality Plan and the implementation of the relevant procedures, Quality Control and Safety Plans.

Material Identification and traceability review and verification of MTC.

Ensuring that the correct revisions of drawings and procedures are being used for fabrication.

Verify calibration of equipment and inspection tools.

Verify the qualifications of inspection personnel’s, welders and NDT operators.

Verification and monitoring the contractor’s adherence to technical specifications, latest Approved documents, Approved Inspection & test plans

Verification of the status of welder and weld procedure qualifications

Fit up inspection and dimensional verification of fabricated items.

Ensure welding is carried as per approved WPS.

Weld parameter verification.

Visual inspection of welds.

Stage wise Inspection of Tanks as per ITP

Monitoring repair procedure, Surveillance checks to prevent malpractice in NDT methods.

Preparation of Final QA/QC dossiers as per Project Management Requirements

Verify NDT is carried out in accordance with approved project procedures and specifications.

Review of radiographs.

Review/assessment of contractor site inspection and NDT reports.

Painting & coating inspection.

Stage wise inspection for Pressure vessel as per ASME Sec VIII

Witness Hydro Test and verify test packs

Company :Velosi Certification Working For JGC

Client : RasGAs

Location :Ras laffan Qatar

Designation :Qc Multi Discipline Inspector(Welding/Painting)

Period :Sep 2011 to April 2012

Project :Barzan Onshore Project

Duties and Responsibilities:

Read and understand clearly the Project Specification, Approved Drawings, Approved ITP’s

Material Inspection as per client specifications and Recommended Codes.

Surface inspection of Materials as per codes and advising if any problems.

Verify and Advice Welding consumables control to the sub-Contractors.

Check daily welding consumables control log sheet.

Frequent Surveillance on consumables for its manufacture Recommended Temperature

Read and clearly indentify the conflict between the reference documents and approved drawings and shall apply stringent or precedence criteria as per the project specification

Witness NDT testing as per Approved ITP.

Execute Quality Activities as per Approved ITP.

Dimension inspection before welding and during Fit-Up as per Approved Drawings.

Verify and advise the Distortion control during welding to the sub-contractors.

Visual inspection of welds as per Project specification.

Carry out Inspection As per RFI (Request For inspection).

Frequently Advice the Sub-Contractors on need of Quality and help them to attain the same

Strive to attain Quality through Safety.

Check the competency of the Quality Personnel in Sub-contractor and educate them the requirement of Project Specification to Attain Quality.

Identified Deviation from Project Specification in field and Report to Immediate Superior.

Verification of calibration documents for welding generators, welding ovens, baking ovens, holding ovens, quivers, temperature measuring devices.

Witnessing adhesion tests (x-cut, cross hatch, pull off test) prior to commencement of painting

Periodic calibration checks of instruments for functional importance.

Monitoring paint storage, shelf life.

Witness blasted surface & profile using comparator/replica tape & dial micrometer. To carryout salt contamination tests on blasted surface to ensure the salt level is within the specified limits.

Witness Holiday Detection test for internal coated piping/tanks, pipelines external and underground piping.

Witness surface preparation, salt test, moisture content test and documentation.

Company :Punj Lloyd Oil &Gas Sdn Bhd

Client : Petronas

Project :Sabah to Sarawak Gas Pipeline project,Malaysia

Designation :QC Inspector

Period :Feb 2010 to June 2011

Description of the project:

The SSGP (Sabah-Sarawak gas pipeline project) is an EPCC awarded to Punjlloyd-dialog-petrosab consortium. The project constructs the transportation line of natural gas from the state of Sabah to MLNG plant at Bintulu (in Sarawak) which is about 512 km of which has a major steep ups and downs. It is also includes major piping works of 1 lakh inch diameter for compressor station and various metering stations at different location, process piping and storage of firewater tanks at compressor station

Duties and Responsibilities:

Inspection of raw material as per procurement order(P.O)and reviewing of related procurement documents for mechnaical/chemical properties in accordance with applicable codes &standards for piping works.

Inspection of welding in pre,in process and final stages.

Monitor Welder performance and conduct visual inspections of welds and repair of welds in accordance with company procedures and international codes of practice.

Conduct fit up and dimension inspections as per Inspection and Test Plan(ITP)

Review of NDT Reports.

Conduct training of welders for new techniques and additional processes as per job requirements.Provide verification of electrodes backing and holding tempereture including control and issue.

Carried out inspection of piping welding in pre,in process and final stages.

Ensuring that Welding is executed in accordance with the instruction and regulations of the specification.

Quality planning and control with respect to customer,control of welding process as per the applicable WPS & PQR requirements.

Review of inspection&test plan,material verification,all stages of inspection,final visual and dimensional inspections.

Coordinate with client and third party inspection agencies to check &record welding parameters and verify compliance with approved Welding Procedure Specifications(WPS)and technical procedures. Liaison with Client and Third Party Inspection.

Company : Sonamet

Client : BP,Exxon Mobil, Chevron

Location : Lobito Yard, Angola

Designation : Welding Inspector

Period : June 2006 to Dec 2009

Projects : Block-15 Gas Gathering-Exxon Mobil /Stinger FabricationScope of Work: Fabrication, assembly, welding, painting and testing of Plems, Plets, Suction Anchor Piles, Single hybrid riser structures, jumpers and stinger for Polaris

Previous Project (1) : Tombua Landana Export Pipe Lines –Chevron

Scope of Work : Construction of Plets, Jumpers and Spools.

Previous Project (2) : BP Angola Block 18 Greater Plutonio URF Development -BP

The projects in Lobito yard Angola are fabrication of Riser Tower, CALM buoy, FTA’s &ILT’S, Piles, Manifolds, Spools and Jumpers

Materials Used : Alloy Steel/Carbon Steel/ Super Duplex Stainless Steel 2205

Roles & Responsibilities:

Monitor site activities with respect to correct reporting and ensure inspections are carried out as per approved ITP.

Verify NDT is carried out in accordance with approved project procedures and specifications

Monitoring performance of welders.

Fit-Up, welding inspection, heat treatment, hydrostatic pneumatic test and preparation of test pack.

Witness and review of NDT (RT, UT, PT and MPT).

Verifying dimensional control reports.

Witness and review welder qualification.

Reviewing weld maps and updating status.

Weld repair analysis.

Reviewing method statements and WPS for various repairs.

Monitor handling and Storage of consumables.

Inspections on finished weld appearance weld size, weld length and the dimensional accuracy of weldment.

Welding machine calibration verification.

Rectification of weld defects.

Make sure that welding is carried out as per requirement and approved WPS.

Co ordination of welder qualifications.

Company : J. Ray McDermott Middle East, Inc.

Client : Saudi Aramco,Shell,Elf, ONGC

Location : Dubai, UAE.

Designation : Welding Supervisor

Period : Dec 2001 to Apr 2006

Project : Fabrcation of Elf,ONGC &shell Deck, Saudi Aramco Deck,Ras Gas Deck,QP Jackets..

Roles and Responsibilities:

Arrangements of Welding consumables; tools; machineries and PPE arrangements.

Hands on training for Welders for the SMAW, SAW, GTAW, FCAW process and hands on training for welders for Steam boiler tubing for both hand Tig welding practice

Assists and co-ordinates with welding Engineering regards to PQR & WPQ qualification.

Implementation of weld procedures & process.

Evaluates and proposes welding methods to be used in order to maximize cast effectiveness and productivity.

Monitors and minimizes/ eliminates weld repairs.

Controls and monitors welding consumable used and adherence to WPS.

Reinforces and maintains Quality with respect to: - Applicable codes and standards, Client's. Specifications, Dimensions and instructions according to working documents (drawings), Workmanship, company's Quality Manual and production cycle

Monitors and optimizes the productivity of the assigned workforce with respect to the allocated budget.

PERSONAL DETAILS:

Date of Birth : 11-07-1981

Nationality : Indian

Marital Status : Married

Languages Known : English, Hindi, Kannada, Tamil & Malayalam

Passport Number : L2974191

Place of Issue : Malapuram

Date of Issue : 19/07/2013

Date of Expiry : 18/07/2018

Address : Kalathilmadu House,

Chelari,Thenipalam PO

Malapuram Dist.

Kerala, India

Pin 673636

Tel.Res. : +91-494-*******,

References: 1) Mr. Ahmed El-Kholy (Project Manager)

Mail Id: ac5r8g@r.postjobfree.com

Mobile Contact No’s: +968 982631/ +968-********

2) Mr.Israr Ahmed (Quality Team Leader)

Mail Id: ac5r8g@r.postjobfree.com

Mobile Contact No’s: +971-*********

3) Mr. Joby Thomas (Client Representative)

Mail Id: ac5r8g@r.postjobfree.com

4) Mr. Ceebu Nair (Branch Manager)

Mail id: ac5r8g@r.postjobfree.com

Mobile No: +770********



Contact this candidate