CURRICULUM VITAE
FAIZAL P.A Email : **************@*****.**.**
Mobile : +919********* ******.****@*****.***
+968-********/+968-********/+968-********
CAREER OBJECTIVE:
To seek a challenging Position in the field of QA / QC Third party Inspection of, new construction / Equipment / Materials and Co-ordination with Vendors, Review of Vendor documents and procedure for the supplied items / Equipment’s as per relevant procedures / Company Sales OR Purchase order. Also in the field of Plant and Maintenance Inspection of Pressure vessels, piping, pipeline, structures, Review of proposed WPS / PQR / WPQT, Welding & NDT plan and Inspections, providing the opportunity to make a strong contribution to organizational goal through a continual professional development of Professional skill.
CAREER SUMMARY:
ONSHORE EXPIERIENCE- 13.5 YEARS
OFFSHORE EXPIERIENCE- 2.5 YEARS
13 Years of experience in the field of Oil & Gas, Petro chemical Industries and Power plants in Asian countries in QA/QC, Engineering and Inspection activities such as Co-ordination with Vendor procedures / supplied Equipment’s / Materials Inspection as per company requirements and also in Maintenance / Repair Inspection in Pressure Vessels, piping / pipeline related activities and Codes / Standards are Known ASME Sec II, V, VIII, IX, B31.3, B31.4, B31.8, B16.5, AWS D 1.1 API 1104, API 510, API 570 & API 650
EDUCATIONAL QUALIFICATION:
DME- Diploma in Mechanical Engineering.
TRAININGS AND CERTIFICATION:
CSWIP 3.2.2 Senior Welding Inspector ( Cert. No. 64794)
CSWIP 3.1 Certified Welding Inspector (Cert. No.: 40013)
BGAS Grade 2 Painting Inspector (Cert. No:598820)
ISO 9001 Lead Auditor Training
ASNT LEVEL-II in RT, UT, PT & MT
Qatar Driving License
Tropical BOSIET with EBS & Travel Safely by Boat (OPITO Approved )
H2s Safety Awareness (OPITO Approved )
WORK EXPERIENCE:
Company :PDO Oman
Location :Fahud,Oman
Designation :Sr.Pipeline inspector
Period :March 2017 till date
Project :Khulud Gas Development Projects
Responsibilities
Review of Quality documents and give comments as per codes and company specifications
Review of QCP/ITP are as per Company Specification and International codes
Witness Procedure Qualification for Mainline Welding using Internal clamp/ External clamp/ Full penetration Repair/Partial Penetration repair/Cap Repair
Witness and Record all essential variables as per QCP and Method statements
Verify Incoming Materials are carried out as per QCP, certificates shall be available with all required details
Verify All Parameters are followed and Applied as per Approved WPS
Verify All documents are Approved and ready for work with code status
Monitor for parameters before,during and after welding are followed and recorded
Verify all Instruments are calibrated and updated,Reference stickers shall be posted and available on the equipment’s used (Equipment Verify log shall be maintained)Certificates shall be available and checked prior to use
Verify All essential data’s are recorded and shall be made available in the reports
Perform visual inspection prior to welding,at each intervals/pass and after final completion prior releasing for Radiography
Witnessing of Fit-up as per WPS and alignment check as per ITP.
Ensuring pre heating temperature to be within the limits of the approved WPS.
Ensuring Oxygen PPM levels within the limits of WPS before starting of Root Welds.
Perform Inspections as per QCP on Behalf of PDO
Witness Mechanical testing
Daily surveillance shall be done and record the data’s if any deficiency is observed
Attend Quality meeting with Vendor/Sub contractor /contractor and discuss all related issues and quality documents are available
Assist Sr.QA in preparing the documents and review of the same
Ensure all activities are carried out with safety plans, Housekeeping shall be maintained at all times
Verify all the reports /records after the completion of Mechanical testing of both CS- and DSS
Witness Procedure Qualification for Heat shrink sleeves for Polypropylene (PP) and Polyethylene (PE)
Ensure safety measures are in place for coating works
Verify and record all data’s during application of coating from blasting till application of HSS
Witness Destructive testing of HSS as per QCP and DEP
Monitor Welder performance records are maintained for the repair rate and status
Closely monitor the repair rate monthly wise, also verify with Daily production for monitoring of welder performance
Remove welder immediately if the repair rate goes beyond company specification and Project KPI ( key Performance Indicator)
Necessary training shall be given and record all variables during training with Radiographic results.
Issue NCR if any Nonconformance to the project specification are observed at site
Proper close outs of NCR’s with RCA ( root cause Analysis ) corrective and preventive actions are taken in place, Close out meeting shall be conducted with related personal who are involved to share information and to avoid re-occurrence
Maintain all quality related documents are in place and with latest updated version
Ensure Approved documents/drawings are used with status code
Daily Review of Radiographic films
Analyze and report quality welds are given in the project, if not necessary actions shall be taken
Attend stage wise inspection from beginning till the end as per Approved QCP
Ensure Request for inspection are raised and verify all documents are mentioned as per requirements of project specification
Company :NCOC .N.V( North caspian Opertaing Company)
Location :Karbatan Onshore/Kashagan Offshore
Designation :Qc Inspector (Welding/Painting/NDT)
Period :13 July 2015 to 20 Sep 2016
Project :Kashagan Development
Material used :API5LX60+clad UNS 625
Project Description : The Kashagan field includes the production of crude oil and gas from the reservoir by a combination of offshore processing facilities and pipeline systems to transport the crude oil and gases from the Kashagan oil field, located in the north Caspian Sea in the Republic of Kazakhstan, approximately 80 km south east of the town of Atyrau, to a new Onshore Processing Facility (OPF), 40 km east of Atyrau, where the oil and gases will betreated and conditioned for custody transfer to in-country infrastructure by onshore dedicated oil and gas export pipeline systems.
The overall pipeline system from the Kashagan fields, Island D, offshore facilities to the OPF presently
Comprises two dedicated 28” oil and gas pipelines, about 95 km long, running in a northerly direction with an offshore length of approximately 66 km and an approximate onshore length of 29 km, including 3 km in swamp area. To provide fuel gas to the offshore process facilities an 18” fuel gas pipeline is also installed, in the same pipeline corridor and parallel to the 28” pipelines, from the OPF to offshore process facilities.
Two fiber optic cables are also installed for communication and control purposes between the OPF, the valve stations and the offshore facilities at the D-Island Central Control Room
RESPONSIBILITIES:
Review of Project specifications & Procedures.
Inspection carried out as per the approved ITP & Quality Control Procedures.
Witnessing Material Receiving inspection for the CRA Clad pipes, Valves, Flanges, Elbows Etc.
Witnessing of Pipe for Calibration by using Automatic Pipe Checker laser measurement tool.
Witnessing of Welder Qualification Test as per applicable code & Specification.
Witnessing of Mechanical Testing and reviewing the reports.
Witnessing of Pre production testing welds as per the specification.
Witnessing of Dye Penetrant Testing for each CRA Clad pipe bevel ends before fit up.
Witnessing of Manual UT for Clad Disbond and Lamination Check.
Witnessing of Residual Magnetism checking for the bevels before fit up as per approved procedure.
Witnessing of Fit-up as per WPS and alignment check as per ITP.
Ensuring pre heating temperature to be within the limits of the approved WPS.
Ensuring Oxygen PPM levels within the limits of WPS before starting of Root Welds.
Monitoring Interpass temperature to be within the limit as per approved WPS.
Internal Root Weld Visual Inspection Carried out after completion of Root and Hot pass for GMAW Process Mechanized Welds by using INTERNAL LASER CAMERA. Witness of IVT after Root and Hot pass (Internal Visual Test ) using Video camera
Familiar with SWS ( Saipem Welding System)
Internal Root Weld Visual Inspection carried out by Root Open Window for Manual GTAW process welds.
External Weld Visual Inspection carried out for GMAW, SMAW Process Welds.
Calculating Heat Input Energy for each welded joint.
Interpretation of Intermediate RT films for Root & Hot pass and Final RT films for Full welds.
Witnessing/Interpretation of UT, MPI, LPI as per Applicable code and specification.
Witnessing of Partial weld repair and Cap weld repair as per ITP & WPS.
Witnessing of DPT for weld repair Excavation.
Witnessing of In Process Touch Up repair welds by using GMAW process.
Ensuring Minimum required of remain ligament weld deposition thickness for Repair Welds.
Witnessing of Internal Root Repair Back welds by using GTAW & PLASMA process.
Internal root weld visual inspection carried out for the root repair welds.
Reviewing & Monitoring Welding Parameter records for the Full completed and repair welds.
Monitoring of calibrations for Equipment’s, Inspection Instruments etc.
Reviewing of Daily Welding reports and NDE reports from Sub contractor.
Attending Meeting with Respective Section Engineers & Sr Quality Engineers.
Conducting Tool Box Meeting with Welders & field Supervisors.
Day to Day Inspection Status reporting to Quality Coordinator.
Issuing of NCR to Site Sub contract Construction groups.
Reviewing the String release for Lowering Dossiers.
Monitoring of Welder Weekly Performance and Repair Percentage.
Review of Pipeline Hydrotest Packages & Get approval from client.
Witnessing of Pipeline Cleaning and Hydrotest.
(Cleaning, Gauging, Flushing, Filling, Stabilization, Pressurization, Swabbing).
Performing Pipeline Walk down Inspection for Issuing punch list and Follow up.
Review and Submission of Final QC Dossiers.
Review of project specifications & procedures.
Inspection carried out as per the approved ITP & Quality Procedures.
Witnessing Material Receiving Inspection for the CRA Clad
Witness of Fit-up check as per ITP
Responsible for yard and field ongoing activities for painting inspection.
Ensuring the correct and valid calibration status of the inspection equipment.
Raise RFI’s to client inspection department through project management
Witness & Inspection for Field Joint Coating.
Physical examination of the surface to be insulated is clean, dry and free from other foreign matters. .
Monitoring / Maintain Log & Storage Conditions of Coating / Painting Consumables as per the Project Specification.
Carry out PQT prior to production as per required the Project Specification.
Carry out Training & Qualification of Blaster & Applicator Personnel as per the Project Specification.
Inspection carried out as per the applicable inspection Test Plan & Project Specification.
Witness Destructive and Non Destructive Test.
CANUSA HSS & RAYCHEM HSS for Pipeline Field Joints
Ensure that weather conditions (viz. Relative Humidity and Dew Point) are suitable for surface preparation and paint application.
Inspection of Blasting & Painting Activities in the Firing Line and fabrication shop.
Ensure that the surface cleanliness and surface profile of blast-cleaned surface are in accordance with the specification requirements.
Ensuring the required safety standards during all the stages of Coating / Painting operation.
Company : ZADCO Secondment Through DNV-GL
Location : South Island, Abhudhabi Offshore
Designation : Qc Multi Discipline Inspector (Welding/Painting/NDT)
Period : Aug 2014 to 03 July 2015
Project :UZ750 (Upper Zakum Project ) The project comprises engineering, procurement, modules and buildings fabrication, transportation, construction and commissioning of island surface facilities (EPC-2) on four artificial islands. Specifically, this will include cluster manifolds, crude oil process facilities, water injection and gas lift, oil export pumps, power generation and associated utilities
RESPONSIBILITIES:
Read and clearly indentify the conflict between the reference documents and approved drawings and shall apply stringent or precedence criteria as per the project specification
Monitor Mechanical activities and ensure that inspections are carried out as per approved ITP.
Ensure the correct application of Project Quality Plan and the implementation of the relevant procedures, Quality Control and Safety Plans.
Material Identification and traceability review and verification of MTC.
Ensuring that the correct revisions of drawings and procedures are being used for fabrication.
Verify calibration of equipment and inspection tools.
Verify the qualifications of inspection personnel’s, welders and NDT operators.
Witness PQR’s, Welder Qualifications, and Mechanical testing.
Organizing and witnessing various types of NDT as required.
Witnessing the Hydro test for CS/AS Piping /GRE/GRP/HDPE
Read and Verify the Piping is installed and routed as per Piping P&ID
Coordinate with client and third party inspection agencies to check &record welding parameters and verify compliance with approved Welding Procedure Specifications (WPS) and technical procedures. Liaison with Client and Third Party Inspection.
Execute Quality Activities as per Approved ITP.
Dimension inspection before welding and during Fit-Up as per Approved Drawings
Review of Radiographs
Visual inspection of welds as per Project specification
Verify test Packs are as per project specifications/signed and properly documented
Verify Contractor documents are as per Company specifications and updated with latest revision are properly traced and well documented
Company :DNV-GL
Client : Oman Oil Company Exploration & Production
Location :Kasab,Musandam
Designation :Plant Inspector
Period :April 2014 to June 2014
Project :MGP Base Line Survey of Newly Installed Pressure Vessels, Heat Exchangers, Columns, and Slug catcher, Initial UT Reading of CML’S ( Corrosion Monitoring Locations )
Company :Adinin Sdn Bhd
Client : Brunei Shell Petroleum
Location : Offshore, Brunei
Designation : Senior Inspector(Welding/Painting)
Period : June 2013 to Jan 2014
Project : Offshore Maintenance, Installation,Hook Up,New construction & Extension of Platforms ( Piping/Structural/Vessels/Module) etc
WORKED FOR FOLLOWING YEARLY SHUTDOWN ACTIVITIES –
CPCA07 CAMPAIGN SHUTDOWN
CPCB07 CAMPAIGN SHUTDOWN
MGCX01 CAMPAIGN SHUTDOWN
SECX01 CAMPAIGN SHUTDOWN
AMCX09 CAMPAIGN SHUTDOWN
AMCX06 CAMPAIGN SHUTDOWN
FACX04 CAMPAIGN SHUTDOWN
QA/QC INSPECTION OF MATERIALS, WELDING, NDT PLANNING AND ARRANGEMENT, NDT INTERPRETATIONS &EVALUATIONS, PAINTING AND PROGRESSIVE AND FINAL DOCUMENTATION AND COORDINATE WITH CLIENT FINAL INSPECTION, PRE-COMMISSIONING AND START-UP OF PLATFORM.
HIGHLIGHTS OF EXPERIENCE IN MAJOR PROJECTS IN BRUNEI
PROJECT WORK DETAIL:
MPM – CHAMPION WATERFLOOD MAJOR PROJECT – QA/QC INSPECTION OF MATERIALS, WELDING, NDT PLANNING AND ARRANGEMENT, NDT EVALUATION, PAINTING AND FINAL AND PROGRESSIVE DOCUMENTATION SUCH AS ITRs IN ISO PACK / MC PACK CLOSED-OUT AND COORDINATE WITH CLIENT IN INSPECTION AND PRE-COMMISSIONING OF SYSTEMS WORK PACKS:
RESPONSIBILITIES:
Carry out regular external visual examinations complemented with NDT examination as required on company equipment such as vessels,boilers,heat exchangers,piping,lifting equipment, Risers, Structures according to company established policies and procedures and issues inspection reports.
Co-ordinate with Vendors, Review of Vendor document and procedure for the supplied Equipment / items as per Company’s Purchase order.
Review / Prepare and execute Inspection plans in conjunction with Maintenance and operation Department.
Maintain company’s Inspection filing system and update next Inspection due dates and equipment history.
Performing pressure vessel internal assembly visual Inspection, thickness survey, preparing anomaly reports, repair recommendation and follow-up.
Entering plant equipments, observing conditions, making preliminary interpretations and issuing recommendations.
Deploying Inspection / NDT personals during Campaign Shut down and maximize the Inspection activities parallel with Plant maintenance construction work. Updating previous anomalies and recommend to repair / rectify this unplanned work, with available resources and if, time permitted.
Maintain and update all Inspection documents as needed and develop and /or review repair recommendations to ensure compliance with engineering standards, applicable codes and original design.
Maintain facilities and equipment as well as other Inspection tools and equipment in clean and operational condition.
Organizing and witnessing various types of NDT as required.
Witnessing the Pneumatic/Hydro test for Piping and equipment
Witnessing the Leak test for new Piping system prior to handover to plant.
Witnessing sub-sea pipeline hydro test / leak test and verifying / reviewing final documentation.
Riser Inspection / Repair recommendation / follow-up for repair work and Review NDT.
Witnessing the Surface preparation and paints mixing / thinning process.
Painting Inventory and material expiry check.
Visual Inspection of coating and verifying the coating thickness WFT/DFT as per project specification.
Holiday testing of Vessel Internal painting.
Raise Noncompliance reports where applicable and ensure the requirements are fulfilled satisfactorily and closed out.
Compiling final documentation and updating in the system
.
Company :Cairn Energy India Ltd
Location :Barmer, Rajasthan
Designation :Qc Coordinator(Welding/Painting/NDT)
Period :Sep 2012 to May 2013
Project :Mangala, Bhagyam & Aishwarya Piping works from Wells to Manifolds, Pipelines to MPT Terminal
Roles & Responsibilities:
Monitor Mechanical activities and ensure that inspections are carried out as per approved ITP.
Ensure the correct application of Project Quality Plan and the implementation of the relevant procedures, Quality Control and Safety Plans.
Material Identification and traceability review and verification of MTC.
Ensuring that the correct revisions of drawings and procedures are being used for fabrication.
Verify calibration of equipment and inspection tools.
Verify the qualifications of inspection personnel’s, welders and NDT operators.
Verification and monitoring the contractor’s adherence to technical specifications, latest Approved documents, Approved Inspection & test plans
Verification of the status of welder and weld procedure qualifications
Fit up inspection and dimensional verification of fabricated items.
Ensure welding is carried as per approved WPS.
Weld parameter verification.
Visual inspection of welds.
Stage wise Inspection of Tanks as per ITP
Monitoring repair procedure, Surveillance checks to prevent malpractice in NDT methods.
Preparation of Final QA/QC dossiers as per Project Management Requirements
Verify NDT is carried out in accordance with approved project procedures and specifications.
Review of radiographs.
Review/assessment of contractor site inspection and NDT reports.
Painting & coating inspection.
Stage wise inspection for Pressure vessel as per ASME Sec VIII
Witness Hydro Test and verify test packs
Company :Velosi Certification Working For JGC
Client : RasGAs
Location :Ras laffan Qatar
Designation :Qc Multi Discipline Inspector(Welding/Painting)
Period :Sep 2011 to April 2012
Project :Barzan Onshore Project
Duties and Responsibilities:
Read and understand clearly the Project Specification, Approved Drawings, Approved ITP’s
Material Inspection as per client specifications and Recommended Codes.
Surface inspection of Materials as per codes and advising if any problems.
Verify and Advice Welding consumables control to the sub-Contractors.
Check daily welding consumables control log sheet.
Frequent Surveillance on consumables for its manufacture Recommended Temperature
Read and clearly indentify the conflict between the reference documents and approved drawings and shall apply stringent or precedence criteria as per the project specification
Witness NDT testing as per Approved ITP.
Execute Quality Activities as per Approved ITP.
Dimension inspection before welding and during Fit-Up as per Approved Drawings.
Verify and advise the Distortion control during welding to the sub-contractors.
Visual inspection of welds as per Project specification.
Carry out Inspection As per RFI (Request For inspection).
Frequently Advice the Sub-Contractors on need of Quality and help them to attain the same
Strive to attain Quality through Safety.
Check the competency of the Quality Personnel in Sub-contractor and educate them the requirement of Project Specification to Attain Quality.
Identified Deviation from Project Specification in field and Report to Immediate Superior.
Verification of calibration documents for welding generators, welding ovens, baking ovens, holding ovens, quivers, temperature measuring devices.
Witnessing adhesion tests (x-cut, cross hatch, pull off test) prior to commencement of painting
Periodic calibration checks of instruments for functional importance.
Monitoring paint storage, shelf life.
Witness blasted surface & profile using comparator/replica tape & dial micrometer. To carryout salt contamination tests on blasted surface to ensure the salt level is within the specified limits.
Witness Holiday Detection test for internal coated piping/tanks, pipelines external and underground piping.
Witness surface preparation, salt test, moisture content test and documentation.
Company :Punj Lloyd Oil &Gas Sdn Bhd
Client : Petronas
Project :Sabah to Sarawak Gas Pipeline project,Malaysia
Designation :QC Inspector
Period :Feb 2010 to June 2011
Description of the project:
The SSGP (Sabah-Sarawak gas pipeline project) is an EPCC awarded to Punjlloyd-dialog-petrosab consortium. The project constructs the transportation line of natural gas from the state of Sabah to MLNG plant at Bintulu (in Sarawak) which is about 512 km of which has a major steep ups and downs. It is also includes major piping works of 1 lakh inch diameter for compressor station and various metering stations at different location, process piping and storage of firewater tanks at compressor station
Duties and Responsibilities:
Inspection of raw material as per procurement order(P.O)and reviewing of related procurement documents for mechnaical/chemical properties in accordance with applicable codes &standards for piping works.
Inspection of welding in pre,in process and final stages.
Monitor Welder performance and conduct visual inspections of welds and repair of welds in accordance with company procedures and international codes of practice.
Conduct fit up and dimension inspections as per Inspection and Test Plan(ITP)
Review of NDT Reports.
Conduct training of welders for new techniques and additional processes as per job requirements.Provide verification of electrodes backing and holding tempereture including control and issue.
Carried out inspection of piping welding in pre,in process and final stages.
Ensuring that Welding is executed in accordance with the instruction and regulations of the specification.
Quality planning and control with respect to customer,control of welding process as per the applicable WPS & PQR requirements.
Review of inspection&test plan,material verification,all stages of inspection,final visual and dimensional inspections.
Coordinate with client and third party inspection agencies to check &record welding parameters and verify compliance with approved Welding Procedure Specifications(WPS)and technical procedures. Liaison with Client and Third Party Inspection.
Company : Sonamet
Client : BP,Exxon Mobil, Chevron
Location : Lobito Yard, Angola
Designation : Welding Inspector
Period : June 2006 to Dec 2009
Projects : Block-15 Gas Gathering-Exxon Mobil /Stinger FabricationScope of Work: Fabrication, assembly, welding, painting and testing of Plems, Plets, Suction Anchor Piles, Single hybrid riser structures, jumpers and stinger for Polaris
Previous Project (1) : Tombua Landana Export Pipe Lines –Chevron
Scope of Work : Construction of Plets, Jumpers and Spools.
Previous Project (2) : BP Angola Block 18 Greater Plutonio URF Development -BP
The projects in Lobito yard Angola are fabrication of Riser Tower, CALM buoy, FTA’s &ILT’S, Piles, Manifolds, Spools and Jumpers
Materials Used : Alloy Steel/Carbon Steel/ Super Duplex Stainless Steel 2205
Roles & Responsibilities:
Monitor site activities with respect to correct reporting and ensure inspections are carried out as per approved ITP.
Verify NDT is carried out in accordance with approved project procedures and specifications
Monitoring performance of welders.
Fit-Up, welding inspection, heat treatment, hydrostatic pneumatic test and preparation of test pack.
Witness and review of NDT (RT, UT, PT and MPT).
Verifying dimensional control reports.
Witness and review welder qualification.
Reviewing weld maps and updating status.
Weld repair analysis.
Reviewing method statements and WPS for various repairs.
Monitor handling and Storage of consumables.
Inspections on finished weld appearance weld size, weld length and the dimensional accuracy of weldment.
Welding machine calibration verification.
Rectification of weld defects.
Make sure that welding is carried out as per requirement and approved WPS.
Co ordination of welder qualifications.
Company : J. Ray McDermott Middle East, Inc.
Client : Saudi Aramco,Shell,Elf, ONGC
Location : Dubai, UAE.
Designation : Welding Supervisor
Period : Dec 2001 to Apr 2006
Project : Fabrcation of Elf,ONGC &shell Deck, Saudi Aramco Deck,Ras Gas Deck,QP Jackets..
Roles and Responsibilities:
Arrangements of Welding consumables; tools; machineries and PPE arrangements.
Hands on training for Welders for the SMAW, SAW, GTAW, FCAW process and hands on training for welders for Steam boiler tubing for both hand Tig welding practice
Assists and co-ordinates with welding Engineering regards to PQR & WPQ qualification.
Implementation of weld procedures & process.
Evaluates and proposes welding methods to be used in order to maximize cast effectiveness and productivity.
Monitors and minimizes/ eliminates weld repairs.
Controls and monitors welding consumable used and adherence to WPS.
Reinforces and maintains Quality with respect to: - Applicable codes and standards, Client's. Specifications, Dimensions and instructions according to working documents (drawings), Workmanship, company's Quality Manual and production cycle
Monitors and optimizes the productivity of the assigned workforce with respect to the allocated budget.
PERSONAL DETAILS:
Date of Birth : 11-07-1981
Nationality : Indian
Marital Status : Married
Languages Known : English, Hindi, Kannada, Tamil & Malayalam
Passport Number : L2974191
Place of Issue : Malapuram
Date of Issue : 19/07/2013
Date of Expiry : 18/07/2018
Address : Kalathilmadu House,
Chelari,Thenipalam PO
Malapuram Dist.
Kerala, India
Pin 673636
Tel.Res. : +91-494-*******,
References: 1) Mr. Ahmed El-Kholy (Project Manager)
Mail Id: *****-*****.**-*****@*****.***
Mobile Contact No’s: +968 982631/ +968-********
2) Mr.Israr Ahmed (Quality Team Leader)
Mail Id: **********@*****.**
Mobile Contact No’s: +971-*********
3) Mr. Joby Thomas (Client Representative)
Mail Id: ****.******@**.***
4) Mr. Ceebu Nair (Branch Manager)
Mail id: *****.****@**.*************.***
Mobile No: +770********