PROFESSIONAL OVERVIEW
PROFESSIONAL EXPERIENCE
WILLIAM MUSSER
**** *. ****** ***., *******, CA 92804 H: 714-***-**** *************@*****.*** Profound knowledge of BIM process, AutoCAD Architecture, Civil 3D and MicroStation Proficient with AutoCAD, BIM and Revit software
Thorough knowledge of Building Information Model (BIM) systems, including model sharing and objects families creation
Superior planning, organization and time management skills Self-motivated, detail oriented, and well organized Good Drafting skills and drawing aesthetics
Excellent Written and oral communication skills
Resilient, positive & confident character
Enthusiastic and keen to use new technologies to improve traditional ways of working Innovate by sharing ideas and challenging standard practices Understanding and experience of appropriate software tools to view and interrogate models Proficient skills in standard Microsoft office suite 01/2016 to Current BIM Project Lead/ Coordinator
Southland Industries - Garden Grove, CA
Creating new Revit Content
Project Setup
Weekly Teaching/Classes
Title 24 for projects
Pick up all red lines for MEP as needed
Head most Revit related jobs
Organize files as needed in our system update and create new jobs from the architectural DWG
Take care of all transmittals plot request and prints Navisworks Clash Coordination for all Disciplines
Coordinate all jobs for clients
Classes weekly on Revit OED University
Focus on Revit
Responsible for changes in architectural backgrounds as updates comes and address them in a timely manner
Responsible for Set-Ups and updates of all plans transmittals, plot requests and PDF's
Material Take offs CFM Sheet Notes Job Set (Revit) Content Creation for both families and annotations. 08/2014 to 01/2016 CAD Manager
Foster Design Group - Irvine, CA
Pick up all red lines for MEP as needed
Redesign if needed as some redlines may need a whole new design instead of just pick ups
Organize files as needed in our system update and create new jobs from the architectural DWG
Take care of all transmittals plot request and prints Title 24 for projects
Photometrics as needed for each job
Coordinate all jobs for clients.
Classes weekly on AutoCAD.
Set Ups and Updates of all plans Transmittals plot requests and PDF's. 10/2013 to 07/2014 BIM Operator/Designer
AJ Kirkwood and Associates - Tustin, CA
Building Information modeling which included but not limited to placement of all cad files into a 3D environment that allowed a visually pleasing and accurate 3D description of the project for the GC and or customer
Collaborated with PMC also helped PMC with any portions of the drawing that were not understood and or misinterpreted
Placed and organized all file drawings created for these tasks as well as kept the head engineer up to par daily on progress and or any issues they may have come from any drawing
Three Phase calculations and field work
04/2013 to 10/2013 Estimator/Designer
Central Plumbing - La Habra, CA
Visiting the assigned sites and reviewing the Task to be drawn and Estimated
Recording all the measurements of the tasks
Responsible for estimating and counting all plumbing material including waste hot/cold lines ventilation and in some case grease waste also for calculations including sanitary waste, water supply, natural gas systems, some storm sizes
Fixtures and material were Cal green Cert
Responsible for all Plumbing (MEP) for this company and structural/civil part of the drawings as well as Revit for HVAC
Commercial mainly / some residential
Covered BOM (bill of materials on all drawings)
Made all calls to the city and other engineers based on required situation were attention was needed for the original drawings and corrections needed to take place
Made all orders for materials shipped materials (returns) Assisted engineers (from the other firms) in overseeing drawings and making sure they were always correct and drawn to the best degree Did appointment setting for corrections to drive down and show the issues at hand with drawings from other firms
Followed code requirements for specific area in which the work was being carried out on drawings and material orders
06/2012 to 04/2013 Drafter/Engineer
KOR Fire Security - Lake Forest, CA
Engineer all new and prefab Drawings Battery Calculations Voltage Drops Full Layout
Excel use for all Battery Calculation Timesheets and City Notes Update Current Database of all Drawings
Take-offs and Bids for possible and potential new Jobs Microsoft Word for Letter presentation for new customers Map Matrix Record of Completions
Maintain and upkeep Project Log for all jobs as well as full Database of drawings
Submit all Drawings to their Prospective City's and complete any Corrections per the City
In Field Work with Technicians Installing Fire Equipment and notification Devices
Drawing Details
Bill of Materials
Zone List
Sequence of Operations
Riser Diagrams
Follow all code Requirements per California Building Code, NFPA72, and International Building Code
AS-BUILT Drawings
10/2011 to 05/2012 Assembler/Fabricator (Contract) Pelican Case Center - Santa Ana, CA
Used Revit for most foam related assembly drawings as well as drawings of the Items that are needed for all the cases drawn for it Used Blueprints to decipher and assemble foam interiors for cases custom work with new prints and new assembly
De burring, heat treating ABS, Delrin, metal deburring with air tools for case frames, and tapping holes cleaning them and making them usable for machinist screws (some sanding involved for better finishes) Problem solver for all drawings and prints
Think of better and faster ways to create a faster and more efficient assembly
Assist others with solving issues
Make sure all items are delivered in timely manner and of excellent quality Cut measure all assemblies to make sure they are exactly as what the customer ordered
All assemblies are assembled in layers making sure that they are all presented correctly
Build prototypes for new assemblies that are shipped for the customer Experience with SAP program Revit Drafts and BOMS
Assemble foam assemblies cut trim as well as Assemble case with proper latches handles ECT
07/2010 to 02/2011 Independent Contractor
Solid experience in residential construction and remodeling, procedures, techniques and tools equipment, materials, specifications, quality control, cost control, and safety
Tile, travertine, granite, onyx, and, ceramic
Perform finish carpentry work, i.e., moldings, trim work, cabinets, etc. Hang drywall as required and perform drywall finishing Staining, painting, and some glazing
EDUCATION
Install drop ceilings when necessary
Install vinyl tile
Shower installs, plumbing, electrical, and some HVACs Perform window, door, and minor roof repairs
Install hang doors (Regular and Security)
Respond in an expeditious and timely manner to all work requests regarding carpentry expertise
Presentation drawings in Revit per customer request on material for layouts throughout the floor plan.
Phone installations and cable installations and stub outs for each room. Lamps, Ballasts and many other lighting and electrical fixtures. Installed many plumbing types' vents, traps, and waste, hot and cold underground and above always following CBC as well as CPC codes. 06/2006 to 09/2009 Foreman
C and H Construction - Cincinnati, OH
Visiting the assigned sites and reviewing the tasks to be accomplished Recording all the measurements of the tasks
Responsible for electrical, drywall, masonry, framing, painting and plumbing as well
I also did all the Mechanical, Electrical and Plumbing (MEP) for this company and structural/civil part of the drawings as well as Revit for HVAC and electrical
Commercial mainly
Covered BOM (bill of materials on all drawings)
Forklift Driver Sit down and Stand up
Made all orders for materials shipped materials (returns) loaded and unloaded most material
Assisted engineers in overseeing drawings and making sure they were always correct and drawn to the best degree
Cable installation
Electrical Fixture and wiring installations
Plumbing material and fixture orders as req. by Ohio and nationalnal building code
WORK PORTFOLIO AVAILABLE UPON REQUEST.
2014 Structural and Civil Drafting
ITT - Riverside, CA