SUMMARY

Coordination, expediting and monitoring of all construction activities

Implementation of contract policies, enforcement of Safety practices, OSHA, Minority Participation and Quality Assurance Programs.

Budget/cost control, tracking of General Conditions and CPM Scheduling, Negotiation of Change Orders, Cost estimating, Review and Process Sub/Contractor payment Requisitions.

Development and Execution of punch list items

Sub-contractor closeout

Liaison functions between Architect/Engineers/Contractors and Clients

80% of projects are Design and Build from the Ground Up

WORK HISTORY

NEW AGE CONSTRUCTION, Conshocken, PA 2017-2018

SENIOR PROJECT SUPERINTENDANT, Aldi Grocery Store Lehighton PA

12 week turnover Demo 3800 sq ft, add new facade with windows and main doors along with interior

renovations including new freezers, coolers, lighting, and all utilities needed.

CS BUILDERS LLC 2013-2016

PROJECT MANAGER

Wrightstown, NJ

1.2 mil sq ft Warehouse space

Manage all Construction Activity including Demo, Sitework, and Maintenance of Property

New Construction of Office Space

Tilt up construction and Precast concrete walls

Liason between Township, Property Owner, and Administration Personnel

Demo of 265k sq ft warehouse space and 4k sq ft maintenance building

LHS CONSTRUCTION, LLC Easton, PA 2010-2013

SENIOR MEMBER

Interior fit out office space of commercial and medical offices

BARR & BARR 2006-2009 NY Office

PROJECT MANAGER

Medical Office Building, Phoenixville, PA

50,000 sq ft Core and Shell.

Three floors fit-out offices, exam rooms, 2 elevators, sleep rooms with high end finishes.

Core exists of steel, concrete, brick and efis with curtain walls and wrap around windows.

Project finished ahead of schedule and at budget.

BARR & BARR NY Office

GENERAL SUPERINTENDANT

Colgate University

5 story 140,000 sq ft Science Building

Project was 5 months behind schedule before I came on board (March 2007) and finished on time.

The project has science labs, offices and high end finishes. Site work was cut down from 4 month to

2 months. Visualization dome which is a high end finish and show piece.

24 contractors on site, total manpower 189, billing $4,5 mill a month.

LEVEL 5 LLC 2004-2006 Georgia

CONSTRUCTION MANAGER

From Design to completion, in charge of every day operations.

Starting with land purchase to permits, buy-outs of contractors contracts, working with designers

for interior graphics and furniture, Design security systems, vaults, safes and dealer cash units.

ATM systems, millwork, High end finish interiors, scheduling, budget control, contractor payments,

client relationship for repeat work.

TURN KEY OPERATION

APLFCU COLUMBIA MD.

APGFCU ELKTON MD

NASAFU MARLBORO MD

DELTA FCU ATLANTA GA

GLEN CONSTRUCTION CO. MD. 2001-2004

SENIOR SUPERINTENDANT/ PM

Sunrise Assisted Living Cresskill, NJ $35mil

65,000 sq ft structural steel, concrete, 3 story

Project started out with many problems, winter, piles breaking, oil found delayed project

At one wing for 120 days. BALANCE OF PROJECT kept on schedule

This Project was turned over to Owner On Time.

Sunrise Congregate Care Cresskill NJ $46 mil

96,000 sq ft wood frame construction 3 story

Project was designed for piles and was switched to Geo-piers

Project involved HRC injection at areas, pushed project back 276 days

This project was turned over to the owner on Time.

Sunrise Assisted living Madison NJ $18 mil

45,000 sq ft structural steel, concrete 2 story

Sunrise Assisted Living Newtown square PA. $24 mil

64,000 sq ft structural steel, concrete, 3 story

J.A. JONES CONSTRUCTION GROUP, NEW YORK. 1997-2001

GENERAL SUPERINTENDANT

Continental Airlines Cargo Facility, JFK Airport, NY

A $24 mil facility provides 8,500 sq ft office space and 54.000 sq ft cargo space.

Airside hard stand and parking for trucks and employees. Building is supported on 620

Pile timbers, structural steel, pre-finished panel wall system. Ball Mat handling system, 6

Weight scales and refrigeration space

United Airlines Cargo Facility Newark, NJ

A $13 mil 45,000 sq ft 12 loading dock facility. Structural steel, and a Rubb Cargo

Design area. A membrane roof over supporting trusses. Pre-cast walls for support

Site work, security and information technology systems integrated with the Port of

Authority.

PS#137-80-The Law School New York School Construction Authority

Projects ranged from $80 mil to $145mil. Responsibilities included coordination of all contractors

and monitoring of construction progress, scheduling of resources to meet Projected schedule of

equipment, material, and overseeing budget.

Continental Global Gateway Newark, NJ

A $1.3 bil project included construction of new terminals and gates along with a parking garage.

STRUCTURETONE INC, NEW YORK

GENERAL SUPERINTENDENT 1995-1996

Benjamin Hotel, 50th Lexington NY.

A $95 mil fast track renovation project of 26 story LANDMARK HOTEL with an 8 month duration.

Work included demolition of all floors, installation of MEP systems and Total interior build-outs as

well as new stone facade on the 1st and 2nd floor.

Project requirements included weekly schedule updates with sub-contractors and fast track

coordination with Architect, Designer, and Owner

J.P. Morgan Bank, Wall Street, NY

A $22 mil fast track renovation of 16 floors (offices). Work included demolition of

Existing offices, upgrade of Data Center, including installation of new communication Data and

power. IDF room and Labs, New Class C fire alarm and security system.

The project required simultaneous coordination with trades, schedule changes to reflect

out of sequence work and change order review/negotiation.

VANDERBILT CONSTRUCTION, NEW YORK, NY. 1994-1995

CONSTRUCTION MANAGER

Exco Noonam Stock Brokers, World Trade Center, NY

A $26 mil fast track 80,000 sq ft renovation to two floors. The project was scheduled

For 8 months, finished project in 6 months. Work included structural reinforcing of concrete

Floor slab at opening for spiral staircase between floors. Construction of new Data Center,

Placement of raised floor system, UPS and Communication Equipment, IDF Rooms. Install

375 work stations for brokers and support for the Trading floor. Responsibilities included

Coordination of all trades with the Owner and Technical staff to finalize equipment layout

and installation.

MORSE DIESEL INTERNATIONAL NY 1988 –1994

SENIOR SUPERINTENDANT/PROJECT MANAGER

Wykoff Heights Medical Center, Brooklyn, NY

A $75 mil Construction of a New 7 story addition tower new rooms, new labs and operating rooms

as well as renovations to existing floors. Work was performed during normal working

Operations without interruptions to the hospital.

US Air Terminal, LGA Airport, Flushing, NY

A $175 mil Construction of 300,000 sq ft terminal with 12 wide body aircraft gates

Including pile foundations, structural steel, concrete, curtain walls and interior finish work.

Construction of a 2000 ft elevated roadway and realignment of existing main roads,

Parking lots and apron areas.

Central Terminal, LGA Airport, Flushing, NY

A $18 mil renovation project for TWA and The Port Authority, Phase 1 and 2

80,000 sq ft Terminal Expansion Program. TWA Ticket Lobby ND baggage Claim area

including new curtain wall, additions to the baggage handling system and new vertical

circulation units.

VRH. CONSTRUCTION NEWARK, NJ 1987 TO 1988

SENIOR SUPERINTENDENT

Newark International Airport, Arrivals Building, Terminal B

New $250 mil 275,000 sq ft Customs and Immigration Facility, included but not limited to

Construction of connector bridge into Customs hall, installation of shell and interior finishes and

Curtain Wall. Site work included paving and utility within the Aeronautical area. All work

performed in a fast track pace while Terminal was fully Operational.

STAVOLA MANAGEMENT COMPANY RED BANK, NJ 1978 TO 1987

PROJECT MANAGER/ VICE PRESIDENT OF OPERATIONS

Projects include a Shopping Mall with 22 stores, Shopping Mall with 32 stores. Design, Build and

maintenance of three company owned Restaurants. Established a New Home Division of Custom

Built Homes, coordinated the construction of various Mid Rise commercial and residential buildings.

Headed up the HeavyConstruction Divison.

Certificates

OSHA 40 hour + 10 hour

Construction Management

Erosion Control Level 1A

Carpenter by Profession