Post Job Free
Sign in

Planning and cost control engineer

Location:
Boumerdes, Algeria
Posted:
May 27, 2018

Contact this candidate

Resume:

In English

Fares Sid ahmed

sfr_frs*@yahoo,fr +213*********

Current Position: Planning Engineer and Cost Control PERSONAL STATEMENT

I am a professional planner with significant experience in working in project environments. I have a strong sense of logic, enjoy solving problems and am a good organiser; all skills which I apply to my work; I am responsible for working with the project manager to develop the project critical network which I then construct using planning software. I maintain the plan on an ongoing basis and with project strand managers, advising them on strand stage planning. I provide a centre of excellence for planning for all projects Project Portfolio

• Algiers Metro Extension 2016- EMA/RATP

• Facilities and Operating Equipements Highways East West Project (west part) 2015-AGA

• 05 Control Tower Air Field Projects 2014-2015 ENNA Oran-Algiers-Constantine-Ghardaia -Tamenrasset

• EPC Military Construction Project 2014-2015

Third and Fourth Military Algerian Area

• EPC Power Plant Project-2013

SONELGAZ

• EPC CPF and Utility Project-2012

SONATRACH-BP-STATOIL

• Air Military Construction Project 2009-2011

ECA TAFRAOUI ORAN

*Implementation Urbain Project 2008

Mascara Department

*Real-Estate Housing Project 2007

Oran Departement

*University Building Hosting 2005-2006

Oran Department

*Achievement Purification Plant for Hospital Project 2005-2006 Oran Department

*362 Housing Rehabilitation and restoration Project 2003-2004 Oran Department

*Draft Social Housing 2001-2002

Oran Department

SKILLS

Feasibility Engineering/Construction Cordination 14 years Planning Software Management(MS-PROJECT) 12 years

Cost Control/cash Out and Cash In 16 years

Planning/Reporting and Performance Management 16 years Planning Software

Management(PRIMAVERA P6)

06 years

MS Office Software 16 years

EPC Planning Project 09 years

4D and 5D BIM Planning Simulation 02 years

Contract Management Assistant 08 years

General Profile

Name Fares Sid ahmed

Nationality Algerian

DOB 09 April 1978

Current Company COALS RAIL

Current Title Engineer Planner and Cost Control

Degree PMP EXAM PREPARATION

Diploma, Bachelor Technical sales Engineer (Preparation) Diploma, Higher study Specialized Project Management Diploma, Senior Technician Civil Engineering (Core Qualification) Status Married – 2 children

Hobbies Design, Programming, Man United big fan

+213********* ********@*****.**

Detail Working Experience

200*-****-**** 200*-****-**** 200*-****-**** 201*-****-**** 201*-****-**** COLAS RAIL

Planning Engineer and Cost Control (Project Control)

● P6 and MS-Project Planning.

● P6 and Ms-Office Planning and Cost analysis reporting (Dashboard, KPI, EVM

● Report for project and program management level

● EOT and Delay claim

● 4D BIM Planning simulation

200*-****-**** 200*-****-**** 201*-****-**** 201*-****-**** SENER

Planning Engineer and Cost Control (Project Control)

● Planning analysis (tasck,ressource, rate and deadlines).

● Reviewing, commen ng and approving the EPC Contarctor Schedules and palnning update change order

● Reviewing, commenting the contractor monthly progress reporting

● Communicated the Performance Management, Planning & Reporting for achievements fields and phases.

● Communicated with the constructor the different formats and control charts progression.

● Coordination with the constructor in order to have smooth execution (initiatives).

● Tracking performance, communication management.

● Critical path analysis, solving the contrains on and after the update.

● Provided recomendation/ proposal with solid tracking modeling.

● Pre&Post analysis of costing .

200*-****-**** 200*-****-**** 200*-****-**** 201*-****-**** 2015 SATEM

Engineer Planner and Cost Control (Project Control)

●Engineering/Execution Planning establishing

●Monitoring with CPM, Job-Card and consolidate with dashboards and curves S with Trends.

● Planning analysis (tasck,ressource, rate and deadlines) and evaluate after update.

● Communicated the Performance Management, Planning & Reporting for achievements fields and phases.

● Communicated with the constructor the different formats and control charts progress.

● Coordination with the constructor in order to have smooth execution (initiatives).

● Tracking performance, communication management.

● Critical path analysis, solving the contrains on and after the update.

● Provided recomendation/ proposal with solid tracking modeling.

● Pre&Post analysis of costing .

200*-****-**** 200*-****-**** 200*-****-**** 201*-****-**** 2015 Cegelec Construction Planner

● Execution/Commissioning Planning establishing with the planning superior department.

●Establishing for monitoring with CPM, Job-Card with the syntheses are concluding with dashboards and curves S with Trends.

● Planning subcontractor analysis (tasck,ressource, rate and deadlines) and evaluate after update.

● Communicated the Performance Management, Planning & Reporting for achievements fields and phases.

● Communicated with the subcontractor the different formats and control charts progress.

● Coordination with the subcontractor in order to have smooth execution (initiatives).

● Tracking performance, communication management.

● Critical path analysis, solving the contrains on and after the update.

● Provided recomendation/ proposal with solid tracking modeling.

●Technical assistance.

200.. 200*-****-**** 200*-****-**** 201*-****-**** 201*-****-**** CSSI ASSISTANT PLANNING ENGINEERING (Project

Control)

SUBCTR ● Execution/Commissioning Planning establishing with the senior planner .

●Establishing for monitoring with CPM, Job-Card with the syntheses are concluding with dashboards and curves S with Trends.

● Planning subcontractor analysis (tasck,ressource, rate and deadlines) and evaluate after update.

● Communicated the Performance Management, Planning & Reporting for achievements fields and phases.

● Communicated with the subcontractor the different formats and control charts progress.

● Critical path analysis, solving the contrains on and after the update.

● Cost and Quantity subcontractor control.

●Technical assistance.

200*-****-**** 200*-****-**** 200*-****-**** 201*-****-**** 2015 BATIMETALHEAD OF REALISATION SERVICE

● Organized and managed all aspect of the workload of execution team throughout the project, within schedule and budget.

● Maintained the production of deliverables within schedule, quality and budget.

● Provided manning forecast and monitor manhour consumption.

● Control and monitor execution and the further engineering progrés .

● Pre&Post analysis of costing .

● All field achievement Commissioning manager.

● Contract Manager.

● Managed and Coordinated with subcontractors technical and financial aspects. 200*-****-**** 200*-****-**** 200*-****-**** 201*-****-**** 2015 CHABEL-HED NADJI Technical Project Manager

● Organized and managed all aspect of the workload of execution team throughout the project, within schedule and budget.

● Maintained the production of deliverables within schedule, quality and budget.

● Provided manning forecast and monitor manhour consumption

● Controled and monitor execution progress.

● Pre&Post analysis of costing .

● All field achievement Commissioning and hand over manager.

● Contract Manager.

● Managed and Coordinated with subcontractors technical and financial aspects.

● Quantity Surveyor.

200*-****-**** 200*-****-**** 200*-****-**** 201*-****-**** 2015 LARBI DJILLALI Technical Supervisor/Construction Planner

● Organized and monitoring all aspect of the workload of execution team throughout the project, within schedule and budget.

● Maintained the production of deliverables within schedule, quality and budget.

● Provided manning forecast and monitor man-hour consumption

● Control and monitor execution progress.

● Pre&Post analysis of costing .

● Contract Manager.

● Coordination with subcontractors technical and financial aspects.

● Quantity Surveyor.

200*-****-**** 200... 200*-****-**** 201*-****-**** 201*-****-**** ARCHI-SEC Technical Supervisor/Feasibility study (Project Control)

● Ensured the progress all aspect of the workload of execution team throughout the project, within schedule and budget.

● Maintained the production of deliverables within schedule, quality and budget.

● Controled and monitor execution progress.

● Pre&Post analysis of costing .

● Contract Manager.

● Coordinated with subcontractors technical and financial aspects.

● Organize the execution’s steps in complex environment(rehabilitation and restoration in urban areas)

● Quantity Surveyor.

PROFESSIONAL ACCOMPLISHMENTS

• Good knowledge of project planning and execution

• Working knowledge of computer planning software

• Deep knowledge of Project Lifecycle process

• Familiarity with 4D BIM Planning

• Ability to assit in project claim statement

• Ability to assist in project design, development and commissioning activities



Contact this candidate