Post Job Free

Resume

Sign in

Structural design engineer

Location:
Cairo, Cairo Governorate, Egypt
Posted:
May 27, 2018

Contact this candidate

Resume:

Sameh Ahmed Abd El Mageed Badr Structural Engineer

1

C.V.

Name: Sameh Ahmed Abd El Mageed Badr

Occupation: Structural Engineer

E-mail: ac5mt8@r.postjobfree.com

****--*** ************* ********* *ION

I have (11) years’ experience in structural Design & Shop drawing of concrete, Steel bridges, tunnels & buildings.

2222--PERSONAL INFORMATION

Date of Birth September (9), 1983

Nationality Egyptian

Membership Egyptian Engineer Syndicate

Marital Status Married

Personal AAAAddddddddrrrreeeessssssss 30 Mustafa El Nahas St. Nasr City, Cairo, Egypt Telephone No. +202-********

Mobile No. +2-010********

3333--EEEEDDDDUUUUCCCCAAAATTTTIIIIOOOONNNN

Degree: B.Sc. in Civil Engineer Helwan University 2222000000005555 GraduationProject Graduation Project::Sanitary Engineering Project Grade:V. Good 80.00%

General grade: V. Good (with honor degree) 80.30%

Professional engineer:eng ineer: Certificate of achievement for successfully passing the NCEES Principles and Practice of Engineering examination. 4444--FOREIGN LANGUAGES

Arabic (mother tongue)

Good command in English (Talking and Writing)

Sameh Ahmed Abd El Mageed Badr Structural Engineer 2

5555--COMPUTER SKILLS

V. Good Knowledge of AAAAuuuuttttooooCCCCAAAADDDD

V.Good Knowledge of SSSSAAAAPPPP2222000000000000,, Safe & CSI Bridge.

V.Good Knowledge of PPPPrrrrooookkkkoooonnnn & CSI Column.

V.Good Knowledge of PPPPCCCCAAAACCCCOOOOLLLL

V. Good Knowledge of Microsoft office

6666--RELEVANT EMPLOYMENT’S RECORD:RECORD :

-[JANUARY 2017 till now] (PIONEER for Engineering consultannnnttttssss)consulta ) Design sssseeeeccccttttoooorrrr: work as senior structural engineer, responsible for design of various structures as bridges, tunnels using ECP specifications with preparing calculation sheets, also coordinate and arrange tasks with my team, give technical support to them to finish tasks as soon as we can, review tasks before submission to client and attend meetings upon request for further discussion.

-[APRIL 2012 ttttoooo NOVEMBER 2016] 2016 ] (ADVANCED CONSTRUCTION COMPANY-COMPANY -JEDDAH)JEDDAH ) Structural department: department work in central technical support office, responsible for check on design and redesign of various structures as bridges, tunnels & buildings using various specifications as M.O.T, MOMRA, and AASHTO standard with preparing calculation sheets. Also reviewing of workshop drawings for the running infrastructure (bridges & tunnels) projects in the company using ACI detailing manual and AASHTO detailing specifications.

-[JANUARY 2008 to MARCH 2012] 2012 ] ( INFRA ENGINEERING CONSULTAAAANNNNTTTTSSSS)CONSULT ) Structural department: model, design, preparing of calculation sheets according to AASHTO standard, AASHTO lrfd, M.O.T and E.C.P and preparing of shop drawings of (bridges & tunnels).

VARIOUS BRIDGES AT SAUDI ARABIA:ARABIA :

Design of precast Prestressed and RC beams using AASHTO standards and M.O.T code and preparing of design drawings for all elements of the bridge with calculation sheets.

Sameh Ahmed Abd El Mageed Badr Structural Engineer 3

REGIONAL ROAD BADR EL FAYOUM DAHSHOUR :

Design and preparing of calculation sheets for straight, skew and curved steel bridges.

UPGRADING OF ISMAILIA-ISMAILIA -CAIRO RRRROOOOAAAAD D WITH RING ROAD (EL-EL -SALAAM BRIDGE) : Check on design of the bridge and preparing of the shop drawings for all elements of the Bridge (continuous box reinforced concrete bays and continuous box Pre- stressed bays).

UPGRADING OF CCCCAAAAIIIIRRRROOOO--ALEXANDRIA-ALEXANDRIA -MATROUH DDDDEEEESSSSEEEERT RT ROAD TO FREE HIGHWAY:HIGHWAY : Check on design and preparing of the shop drawings for curved box girder system of various U-turn bridges.

VARIOUS BRIDGES AT "BANI SWEFF"SWEFF ":

Design and preparing of calculation sheets for open girders System Bridge crossing canals and drains.

-[MARCH 2222000000007777 ttttoooo JJJJAAAANNNNUUUUAAAARRRRYYYY 2008]A & A (Engineers and Consultants) Amin Lotfi and Associates

DAMITTA QUAY PORT:

Design of diaphragm wall of DAMITTA PORT according to (BS-8110) 1997.

BIN SAMIKH HOTEL TOWER BUILDING (QATAR):

Civil engineer responsible for the Modeling and Design of part of Concrete Floors of the Tower (3 Basements + Ground + Mezzanine + 77 Floors) Using (BS- 8110)1997.

• Design of Multi-story Garage at EL-AHRAM HEIGTHS according to E.C.P.

• Design of Concrete Jacking and Receiving rooms.

• Design of Diaphragm wall of jacking room for EL-KUREMAT (III) ELECTRICAL POWER STATION (using ACI 318-05).

EL KUREMAT (III) ELECTRICAL POWER STATION:

Preparing the Shop Drawings for various RC Structures as (Combustion Turbine, buildings, Generator Buildings, Administration Buildings, Tanks & Ordinary Buildings using ACI code 315-99).

7777--AAAAccccttttiiiivvvviiiittttiiiieeeessss

Reading, Drawing & Computer.



Contact this candidate