Weyland Lum
San Francisco, CA **131
M. H. Construction Management Company, San Francisco, CA Oct 1, 2016 to Present
Manage projects, review drawings and field work. Projects consist of residential and light commercial.
(part-time)
Cadnet Service, San Francisco, CA (outsource to AECOM) Aug 8, 2016 to Sept 19, 2016
Civil Drafter (temporary aid)
Project: Bay Corridor Transmission and Distribution. Layout underground electrical conduit duct bank. Kennedy/Jenks Consultants, San Francisco, CA
Sept 21, 2015 to April 8, 2016
Electrical Designer/Drafter
Projects consist of water reclamation, water treatment facility, wastewater treatment facility, site pump station, cogeneration facility, Desalter facility, Fat-Oil-Grease (FOG) facility, water reservoir on steel tank and concrete structure, electrical control building, engine generator building, aircraft maintenance hangar, CA National Park and Yosemite National Park facility. Lay out lighting, power, controls, signals, fire alarm systems and security systems for industrial and commercial buildings. Layout single line diagram, elementary diagram, process and instrumentation diagram, electrical equipment, motor control center, switchgear and instrument control panel. Provide conduit & wire schedule, panelboard and light fixtures schedules. Design general details. Provide civil drafting for San Francisco streets handicap curb ramps. Sept 8, 2015 to Nov 27, 2015 outsource electrical drafting service to: City and County of San Francisco Public Utilities Commission, Engineering Management Bureau, Electrical Division, San Francisco, CA Project: Moccasin Maintenance Shop and Control Building. Cadnet Service, San Francisco, CA (outsource to City and County of San Francisco Public Utilities Commission, Engineering Management Bureau, Electrical Division) May 12, 2015 to June 2015 and Aug 13, 2015 to Sept 18, 2015 Electrical and Mechanical Drafter (temporary aid)
Projects are:
1. Auxiliary Water Supply System Pumping Station No. 2 Improvements, San Francisco Golden Gate Park. Mechanical drafting support.
2. San Francisco Westside Recycled Water Treatment Facility at Oceanside Plant Building 580/510. Electrical drafting support
3. San Francisco Westside Recycled Water Pipeline. Electrical drafting support. 4. Sunol Corporation Yard. Electrical drafting support. 5. Southeast Water Pollution Control Plant SEP 521/522 and Disinfection Upgrades. Mechanical drafting support. 6. Moccasin Maintenance Shop and Control Building. Electrical drafting support. Kennedy/Jenks Consultants, San Francisco, CA
Nov 30, 1999 to March 3, 2015
Electrical Designer/Drafter
Projects consist of water reclamation, water treatment facility, wastewater treatment facility, site pump station, office building, electrical control building, maintenance shop, CA National Park and Yosemite National Park facility. Lay out lighting, power, controls, signals, fire alarm systems and security systems for industrial and commercial building. Layout single line diagrams, elementary diagrams, process and instrumentation diagrams, electrical equipments, motor control center, switchgear and instrument control panel. Provide conduit & wire schedule, panel board and light fixtures schedules. Design general details. Provide California Energy Code Title 24, cost estimates and review shop drawings.
Aug. 2013 to Dec. 2013, outsource electrical drafting service to: City and County of San Francisco Public Utilities Commission, Engineering Management Bureau, Electrical Division Project: Regional Ground Water Storage Recovery. 14 pump station sites, 8 sites are open pump station and 6 sites are building pump stations.
Toft, Wolff, Farrow Inc, San Francisco, CA
Oct 26, 1998 to Nov 29, 1999
Electrical Drafter
Commercial building and hospital facility, layout lights, low voltage power, control and signal. GEZ Architects Engineers, San Francisco, CA
Dec 2, 1996 to July 1, 1998
Electrical Drafter
Commercial building, layout lights, low voltage power, control and signal. Layout Telephone Company cellular telephone control panel and antenna on building.
Underground Construction Managers, San Francisco, CA (outsource to City and County of San Francisco, Department of Public Works, Bureau of Architecture) March 11, 1996 to July 31, 1996
Project: Mission Branch Library – Upgrade. Provide architecture drafting support for building plans and details. Underground Construction Managers, San Francisco, CA (outsource to City and County of San Francisco, Department of Public Works, Bureau of Engineering, Electrical Division) Oct 17, 1995 to March 4, 1996
Electrical Drafter
Project: North Point Water Pollution Control Plant Improvements, Phase 1 Provide design and drafting support to retrofit all existing light fixtures and receptacles as required. Kennedy/Jenks Consultants, San Francisco, CA
June 23, 1980 to Sept 15, 1994
Electrical Designer/Drafter
Projects consist of water reclamation, water treatment facility, wastewater treatment facility, site pump station, administration building, electrical control building and Yosemite National Park facilities. Lay out lighting, power, controls, signals, fire alarm systems and security systems for industrial and commercial building. Layout single line diagrams, elementary diagrams, process and instrumentation diagrams, electrical equipments, motor control center, switchgear and instrument control panel. Provide conduit & wire schedule, panelboard and light fixtures schedule. Design general details.
Relevant Skills: Computer drafting AutoCAD 2014
Education:
FAA Airframe and Powerplant License, July 1977
Associate Degree in Aviation Maintenance Technician, Certificate June 1977. Associate in Arts, August 1975
City College of San Francisco, CA
Contacts:
Matthew Huey, President
M.H. Construction Management Company
Donald Barraza, P.E.
Principal Structural Engineer, Kennedy/Jenks Consultants 415-***-****
Zachary Harris P.E.
Principal Mechanical Engineer, Kennedy/Jenks Consultants 415-***-****