EXPERIENCE. TOTAL POWER PLANT EXPERIENCE 27 YEARS.
MANAGER POWER HOUSE (ASIM,JA TEXTILE,ZEESHAN
ENERGY)
1 I HAVE DIRECTLY REPORT TO CHIEF EXECUTIVE RELATED TO ALL
THREE UNITS ENERGY & MILLS ELECTRICAL,COMPRESSOR METER.
2I AM WORKIN THERE W.E.F JULY 2014 TO TILL DATED.
3ENGINE JENBACHER,DUETZ GAS ENGINE &,NIGATTA HFO ENGINE.
MANAGER POWER;( AMTEX MILLS)
I.I HAVE DIRECTLY REPORT TO EXECUTIVE DIRECTOR&TECHNICAL DIRECTOR RELATED TO ALL ENERGY METTER.
II.I AM WORKING THERE W.E.F FEBRUARY, 2012 TO JUNE 2014.
III.ENGINE JENBACHER JGS 320 GSNL x 12 SET
PLANT MANAGER: (BISMILLAH SPINNING MILLS)
I.I HAVE DIRECTLY REPORT TO CHIEF EXECUTIVE RELATING TO MECHANICAL, ELECTRICAL& OTHER MANAGEMENT PROBLEM.
II.I HAVE WORKED IN THERE SINCE FEBRUARY 2005 TO FEBRUARY,2012 BASICALLY IT IS GAS POWER PLANT OF FOURE ENGINES GUASCOR SFGLD 560, 952 KW EACH.(3.8MW)
III. ONE ENGINE WAUKESHA MODEL VHP5904LTD 1000RPM 900KW.
IV.ONE GAS TURBINE TURBO MECK(CATTER PILLER)2.8 M.W CAPACITY.
A. MANAGER(ELECTRICAL): (CRESCENT ENERGY BAHUMAN)
I.I HAVE DIRECTLY REPORT TO PLANT MANAGER RELATING TO ELECTRICAL, PROBLEMS.
II.I HAVE WORKED IN CRESCENT ENERGY BAHUMAN FROM SEPTEMBER 2003 TO FEBRUARY 2005. BASICALLY IT IS WARTSILA VASSA POWER PLANT OF TWO ENGINES EACH 5300KW (10.6MW)
III.I WAS ALSO LOOKAFTER WASTE WATER PLANT UNIT MAINTENANCE ELECTRICAL.
ELECTRICAL ENGINEER.
I HAVE WORKED IN GHAZI POWER LTD. (BHAI PHERO) FROM
SEPTEMBER 1995 TO OCTOBER 2003. (EIGHT YEAR).
V. RLC ANALOGUE SYSTEM.
VI.ENGINE CATERPILLER 3600 SETX06 4825 HP.
VII.GENERATOR AVK (GERMANY) SET X06 3450KW (20.7MW)
VIII.COMPLETE ERECTION OF JENBACHER 620 SETX03 3000KW(9.0MW)
CONTROL ROOM SUPERVISOR
I HAVE WORKED IN CRESCENT POWER GENERATION SARGODHA ROAD FAISALABAD FROM MAY 1990 TO SEPTEMBR 1995 (FIVE YEARS) ON FOLLOWING EQUIPMENTS.
I.RLC ANALGUE SYSTEM.
II.ENGINE WARTSILLA NOHAB SETX5 2.3 (11.5MW)
III.ENGINE WARTSILLA VASSA SETX2 5.3 (10.6MW)
TOTAL PLANT CAPACITY (22.1MW)
I AM FULLY EXPERIENCED IN
STAND BY GENERATOR 3512 CATERPILLAR
ENGINE CATTERPILLAR 3512 SETX06 1.2(7.2MW).
I.ENGINE CATTERPILLAR 3512 TOP END MAINTENANCE, TURBO CHARGER INSPECTION.
II.GENERATOR CATTERPILLAR BEARING CHNGE &WINDING INSPECTION, REVARNISH.
III.COMPLETE 1000Hrs&TOP END MAINTENANCE OF GUASCOR GAS ENGINE 952 KW, 1500 RPM.
IV.COMPLETE MAJOR MAINTENANCE OF GUASCOR GAS ENGINE952 K.W.
V.WAUKESHA GAS ENGINE 900KW 1000RPM ERECTION&COMMISIONING.
VI.COMPLETE ROUTINE MAINTENANCE OF WAUKESHA ENGINE 900KW.
VII.TOPEND MAINTENANCE OF WAUKESHA ENGINE.
VIII.ERECTION, OPERATION MAINTENANCE OF LT.H.T PANELS, TRANSFORMER.
IX.EARTH OF POWER HOUSE SYSTEM.
X.ERECTION OPERATION MAINTENANCE OVERHAULING OF ALL, MOTORS.
XI.COMPLETE OPERATION &OVER HAULING OF AVK 11KV GENERATOR SETS.
XII.GENERATOR AVK 11KV BEARING CHANGE&BEARING INSPECTION.
XIII.GENERATOR AVK 11KV STATOR WINDING&ROTOR WINDING REPARING, OVER HAULING.
XIV.LAYING DRESSING TERMINATION OF POWER&CONTROL CABLE.
XV.SELECTION OF C.BS MAGNETIC CONTACTOR, CABLE.
XVI.XLPE KITS OUT DOOR&IN DOOR.
XVII.ERECTION&MAINTENANCE OF 11KV TRANSMISSION LINE.
XVIII.ABSENCE OF MECH.ENGINEER ENGINE CATTERPILLAR 3600 1000 Hrs ROUTINE, NOZZLE RING, TURBO INSPECTION, HEAD CHANGE IN MY SUPERVISION.
XIX.COMPLETE OPERATION&MAINTENANCE OF H.F.O PURIFIER, LUB OIL PURIFIRES BOOSTER MODULES, VISCOCHIFE.
XX.MAINTENANCE&SERVICING OF AIR CONDITIONER.