Abhishek Sahoo
E-Mail:
***************@*****.***
**.**************@***********.***
Phone No-
Permanent Address:
BBSR.Odisha.
Personal Dossier:
Name: Abhishek Sahoo
Father’s Name: Chittaranjan Sahoo
Mother’s Name: Jyotsna Sahoo
Nationality: Indian
DOB: 28th Dec 1985
Fluency In Language:
LANGUAGE
READ
WRITE
SPEAK
Eng
Hindi
Oriya
Interests and Hobbies:
Traveling
Collecting Technical Data
Listening Music
Personal Traits:
I am young positive minded, energetic & honest person.
I work in power plant, which is my ambition & only job satisfaction.
Target oriented & friendliness allows me to accomp my aim.
Accreditation:
I have presented papers during my
Academic session 2007-2008.
I have participated in many
Technical symposiums.
COMPUTER COGNIZANCE:
MS Office
Familiar with ERP system.
Lotus.
PASPORT DETAIL:
Passport NO. L5119471
D.O.E. 30/09/2023
In quest of assignment in operation,commissioning and maintenance with an organization of repute.
Domain Expertise
Operation
Commissioning Maintenance
Technical Supervision Man Management
Professional Snapshot
Condensed PG course on “Thermal Power Plant Operation & Maintenance” from OMS Power Training & Research Institute, Bhubaneswar, and Odisha. It is recognized by Central Electricity Authority (CEA), Ministry of Power, Govt. of India.
This Certified P.G. course is treated as experience
power sector.
ACCOMPLISHED POWER PLANT PROFESSIONAL WITH 6.9 YRS OF EXPERIENCE IN POWER PLANT (OPERATION & MAINTENANCE)
BHUBANESHWAR POWER PVT. LTD.
Organization: M/S OPERATIONAL ENERGY GROUP
INDIA PVT. LTD
Time Period: DEC 2015 to till date.
Designation:Boiler Desk Engineer
Operation Preview:
Boiler: IJT make 2* 275 TPH HOT CYCLONE CFBC,
Main steam pressure- 93kg/cm2,
Main steam temp-540degC.
Turbine: 2*67.5 MW SIEMENS Make SST600
Turbine, 3000rpm
I/L pressure-90 kg/cm2, I/L temp- 530degC
Automation: SIEMENS SPPA T3000 versions.
GULBARGA POWER PVT. LTD.
Organization: M/S THERMAX LTD
Time Period: JANUARY 2013 to DEC 2015.
Designation:Boiler Desk Engineer
Operation Preview:
Boiler:THERMAX make 130 TPH IR-CFBC,
Main steam pressure- 89kg/cm2,
Main steam temp-525degC.
Turbine: 30 MW SIEMENS Make
Turbine, 6800rpm
I/L pressure-86 kg/cm2, I/L temp- 515degC
Automation: ABB 800XA versions.
ACTION ISPAT AND POWER LTD.
Organization: M/S DESEIN PVT LTD
Time Period: MARCH 2011 to JANUARY 2013.
Designation: Boiler DCS Desk Engineer.
Operation Preview:
Boiler:THYSSEN KRUPP make 2*185 TPH
COLD CYCLONE CFBC
Main steam pressure- 91kg/cm2,
Main steam temp-525degC.
Turbine: 86 MW( 2 X 43 MW) BHEL Make
Turbine, 5000rpm
I/L pressure-89 kg/cm2, I/L temp- 515degC
Automation: YOKOGAWA Centum VP versions
SALIVAHANA GREEN ENERGY LTD.
Time Period: March 2010 to Feb 2011.
Designation: GET/ DCS Engineer.
Operation Preview:
Boiler: CVL Make 90 TPH AFBC,
Main steam pressure- 88kg/cm2,
Main steam temp-520degC.
Turbine: 23MW Triveni Make Turbine, 6880rpm
I/L pressure- 85kg/cm2, I/L temp- 515degC
Automation: ABB 800XA versions.
Selected Accomplishments
Experienced in the operation of CFBC(hot cyclone,cold cyclone and IRCFBC), AFBC & WHRB boilers & familiar with PCB boilers.
To handle the emergencies (BLACK-OUT, Equipment tripping, etc) and to restore the unit in minimum possible time
Maximum possible efficient operation of all in local area (Turbine, Feed Cycle, Boiler, Fan, Electrical System Area)
Strict adherence to pollution norms.
Safe & planned unit start-ups and shut-downs.
Handling emergencies & normalizing at the earliest.
Operation knowledge of bleed cum with both Air cooled condensing and surface condensing turbine and associated system.
Work Responsibilities
COMMISSIONING,OPERATION & MAINTENANCE ACTIVITIES
Execution Of Daily Planned Commissioned Activates.
Reporting to HOD/Commissioning coordinator/Site
in charge for daily commissioning activities and
follow up balance activities
Involved in pre-commissioning & commissioning of BOILER which involve commissioning activities like RDO, ABO, flushing of water,Steam Blowing & safety valve floating.
Involved in pre-commissioning and commissioning of COAL HANDLING PLANT, with DE System, and stacker and reclaimer.
Involved in pre-commissioning and commissioning of WATER TREATMENT PLANT (WTP).
Involved in pre-commissioning & commissioning of ESP which involves GD TEST, modification of sceen
Involved in pre-commissioning & commissioning of TURBINE
And auxiliaries Which involves TG LUBE OIL
FLUSHING,taking EOP, AOP, MOP,Vapour
extraction fan in line,vaccum pulling,rolling,
electrical and overspeed test,Synchronization.,
Turbine extraction charging,Plant at full load
Shutdown Responsibilities
TURBINE OVEHAULLING: study of turbine blades through baroscope,,dismentaling Journal Bearing and Thurst Bearing,Depenentration test,blue matching of gear box under supervision of SIEMENS engineer.
Condenser tubes jet cleaning:
Boiler wet preservation.
Boiler tube thickness mapping .
Ejector Nozzle cleaning it was got jammed.
Academia
B.Tech in ELECTRICAL ENGINEERING from C.V RAMAN
COLLEGE OF ENGINEERING, BBSR under BPUT in the
year 2009 with 6.79 CGPA.
Professional certificate and Technical exposure
1.Holder of license (power plant O and M competency certificate) a mandatory for operation and maintenance of power plant of capacity 100 MW or above.
2.Undergone 2 months training on O/M of (210x2) MW in OPGC, Jhasraguda as a part of PG diploma course.
3.Undergone 2 weeks simulator training of 210 MW unit at Bakreshwar Thermal power plant, W.B covering light
up of boiler, rolling and synchronization and handling emergencies.
4. Undergone vocational training in power grid and its
applications at OPTCL, which is approved as Grade C,
category – I training centre by CEA, Govt. of India
My Vision
I am Abhishek Sahoo I want to see myself as the motivating force to make guide & coordinate a dedicated Operations for esteem Organization that in turn will help me as well as the Organization maximum result within a stipulated time. Dream of achievement & to reach that goal. I want to be the steps.
Expected CTC- As per system% (Min Hike) for Relocation
REFERENCE: Upon Requisition
Place: Bhubaneswar Abhishek Sahoo