Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Raipur, CT, India
Salary:
30000 per month
Posted:
May 17, 2018

Contact this candidate

Resume:

CURRICULUM VITAE

BRIJENDRA PAL SINGH

Email :ac5hrs@r.postjobfree.com

Mob. No:919*********,919*********

PERMANENT ADDRESS

G-6, Ayurvedic colony,

Raipur, Chhattisgarh.

PRESENT ADDRESS

G-6,Ayurvedic colony,

Raipur, Chhattisgarh.

OBJECTIVE :

Dynamic and highly driven mechanical engineer looking for a position in a well-established company, Equipped with the necessary knowledge, skills, and abilities in areas pertaining to operation and maintenance in Thermal power plant sector

WORKING EXPERIENCE(TOTAL7.8 YEARS POWER PLANT PROJECT,ERECTION,COMMISSIONING OPERATION & MAINTENANCE )

PRESENTLY WORKING IN as a SHIFT INCHARGE M/s JK LAKSHMI CEMENT LTD (under DESPL O&M) AHIWARA DURG CHHATTISGARH

DURATION: 11/07/2017 TO TILL DATE

JOB PROFILE:

WORKING AS A SHIFT INCHARGE IN1x8MW POWER PLANT.

This plant having 4500TPD kiln and3 no waste heat recovery system boiler AIRQUENCHINGCOOLER BOILER (13.6 TPH working pressure 1.25MPa),SUSPENDED PREHEATER BOILER (27.1 TPH working pressure 1.36MPa), LOW PRESSURE BOILER (6.1TPH working pressure 0.3MPa) make by Nantong Wanda Boiler Co Ltd. AND 1no of low pressure turbine working pressure 1.2MPa and steam temp 370*c with air cooled condenser & ABB DCS.

RESPONSIBLE FOR:

Preparing commissioning schedules in coordination with equipment testing and commissioning team to match with the project completion plan.

Conducting other tests like specific power consumption for the system/package to ensure that the results are within the pre-committed performance guarantee parameters.

Experience in BOP activities, 5S implementation

Planning and coordinating the Boiler and Turbine DCS Operation and ensuring proper functioning & maintenance of the power plant.

Responsible for smooth cold start-up, hot start-up, normal operation, emergency handling and shutdown of Boiler/Turbine(1x7.76MW).

Responsible for smooth operation of WHRS boiler with maintaining proper parameter.

Co-ordinate with maintenance, personnel for ensuring violation, defect identification, work permit, trials and clearance of jobs prioritized by him.

Monitoring & controlling steam/ air/ fuel/ water parameters to achieve maximum efficiency of boiler & turbines from control room & from field.

Ensuring smooth operation of boiler / turbines during normal and emergency conditions to prevent equipment / unit tripping/ protect equipment and personnel

PASPROFILE: 1.PAST WORKING IN GHANKUN STEELS PVT LTD RAIPUR AS A SHIFT INCHARGE .

DURATION: 22/02/2016 TO 10/07/2017

JOPROFILE:

12MW Turbine (make by SIEMENS LTD) erection and commissioning.

AFBC 30 TPH and WHRB 35TPH (make by ISGEC LTD) erection and commissioning.

RESPONSIBLE FOR:

Spearheading efforts as shift in charge Operation & Maintenance( 1x12MW) involved in Cold Start up, Hot Start-up, Warm start up, Normal Operation, Emergency Handling and Safe start up & shut down of Units.

Responsible for smooth operation of AFBC (1x30 TPH) & WHRB(30 TPH) boiler with maintaining proper parameter.

Ensuring smooth operation of boiler / turbines during normal and emergency conditions to prevent equipment / unit tripping/ protect equipment and personnel

Co-ordinate with maintenance, personnel for ensuring violation, defect identification, work permit, trials and clearance of jobs prioritized by him.

Maintaining Operation of the power plants, and Balance of Plant; monitoring plant operations including start-up & shut-down of units and control generation as per requirement.

Monitoring plant operations including start-up & shut-down of units and control generation as per requirement; monitor the loading of Machine and co-ordinate with load dispatch.

Planning and effecting preventive maintenance/ overhauling schedules of various machineries and equipments to increase machine up time and reliability.

Handling line up of the unit and its auxiliaries, Changeover of equipments, routine testing of protection system and annunciation system.

Performing Desk operation like lining of major auxiliaries during Start-up of unit like circulating water pump(CWP), Auxiliary Cooling Water Pump (ACWP),Boiler feed pump(BFP), Condensate Extraction pump (CEP),Auxiliary oil pump (AOP) .

Managing operation & maintenance of Ash handling plant (AHP)

Actively involved with major overhauling of machines like Steam Turbine, Condensate Extraction Pump, Cooling Water Pump, Cooling Tower Fan, Boiler Feed Water Pump, ID Fan, FD Fan, PA Fan, etc.

Issue works permits to maintenance department and coordinates with them for equipment isolation and take trial run of equipments after shutdown work.

2.ENGINEER–BOILER & TURBINE OPERATION UTTAM GALVA METTALICS LTD,WARDHA M.H.

DURATION : 10/03/2014 TO 18/02/2016.

COMPANY PROFILE:

A flag-ship and fast growing company working with SAP Environment.

It is a Manufacturer of Pig Iron (1500 TPH BLAST FURNACE), Ballets & Bars (90 TPH SMS furnaces),Hot Rolling Mill, Cold Rolling Mill & POWER PLANT (1x18 MW).

The company also has COKE OVEN PLANT & SINTER PLANT which makes raw material for blast furnace.

JOB PROFILE:

Working as a SHIFT ENGINEER in1x18 MW POWER PLANT.

This plant having 40 TPH AFBC Boiler& 75 TPH WHRB Boiler (China make) SIEMENS DCS.15 MW Double Bleed cum condensing type turbine made by HANGZHOU CHINA.

RESPONSIBLE FOR:

O&M of 40 TPH AFBC BOILER and its auxiliaries,15MW condensing Turbine and its auxiliaries.

Emergency handling of Boiler as well as turbine.

Performance monitoring and maintain the require parameter for smooth and efficient operation.

Planning of effective maintenance schedule of boiler, turbine and their auxiliaries like condenser, ejector, cooling tower, air compressor etc.

Handling all the activities during unit shut down.

Check water analysis report on daily basis.

Planning, Organized Achieving Company’s Goal with respect to time bound,targets,cost effectiveness and quality parameters. Monitoring the generation functions day wise and shift wise.

Managing and trained manpower for proper functioning.

Continuous improvement of machine& in the process to improve the generation and Cost reduction.

Maintain record of operation & maintenance log sheet.

Optimum Utilization of man, machine and material.

Co-Ordination with Maintenance & Electrical Departments during Preventive, Breakdown & Shutdown maintenance and Light up.

3. Worked in SHRI BAJRANG POWER & ISPAT LTD (26 MW Thermal Power Plant), Ural Industrial, Raipur, Chhattisgarh.

DESIGNATION: Joined as a GET, after 1 year promoted as a Asst. ENGINEER.

DURATION : 10/06/2010 TO 06/03/2014.

COMPANY PROFILE:

It is a manufacturer of sponge iron (300 TPH two kilns) & POWER PLANT (26 MW).

This Plant having 70 TPH of AFBC boiler Cather Vassal Ltd Boilers, 38 TPH of TWO WHRB Boilers & Triveni Steam Turbine Having TWO Extraction With Surface Condenser & Siemens DCS system.

JOB PROFILE:

Worked as a Desk Engineer.

Responsible for operation 70 TPH Boiler AFBC,2*38 TPH WHRB Boilers, 2*8MW and 1*10MW Turbine, Make- Cather Vassal Ltd

Working pressure 66 kg/cm2 & working temperature is 4900 5 C

Responsible for shift operation of Boiler, turbine and utility from control room DCS and field Maintenance.

Monitoring the parameters and to find out the abnormalities in plant during shift.

To take corrective actions to run plant smoothly

Co-ordination with relative department.

Co-ordination with Maintenance & Electrical Departments during breakdown,preventive& shutdown as well as running condition.

Skills and Strength

Basic knowledge and operating in computer.

Hard work and sincerity is my key element.

Effective communication skill with strong analytical, problem solving & organizational abilities.

Self confidence, target orientation, time management and quality consciousness.

Team spirit & Comfortable in any environment.

EDUCATIONAL QULIFICATION:

Exam Passed

University

Year of Passing

B.E. (Electrical)

R. G. P. V. Bhopal (M.P.)

june-2009

H.S.S.C.

M.P. Board

March- 2004

H.S.C.

C.G. Board

March-2002

INDUSTRIAL TRAINNING:

Two weeks training at “BHILAI STEEL PLANT” under the various shops. Under gone

One Month Training M. P. M. K. V. V. CO. Ltd. Bhopal M.P.

PERSONAL PROFILE:

Name : Brijendra Pal Singh

Father’s Name : Dinesh Singh

Date of Birth : April 21, 1987

Gender : Male

Marital Status : Married

Languages Known : English,Hindi

DECLARATION:

“I here by declare that above information are true to the best of my knowledge”.

Place:

Date: (BRIJENDRA PAL SINGH)



Contact this candidate