Resume

Sign in

High School

Location:
Sulphur, Louisiana, United States
Posted:
May 17, 2018

Contact this candidate

Resume:

Ricardo Rocha

1-361-***-****

ac5h4e@r.postjobfree.com

**** ***** ****

Ingleside, Tx 78362

Education:

McAllen High School

**** ** ***** ***.

McAllen, Tx. 78501

1-956-***-****

High School Diploma 1983

Baseline Data

206 Lang Rd.

Portland, Tx 78374

1-361-***-****

Aquired Certification from AWS

Certification # 14101901

Certified Welding Inspector

NCCER Card

Zachary Safety Supervisory Field Training

TWIC CARD Expires 2020 January 21

Safety Council Basic Plus Expires 1/2019

Employment:

June 2016 thru current employment

CB&I Sulphur LA.

337-***-****

Cameron LNG Hackberry LA.

Weld mapped iso drawings prior to Fab.

Made sure the right consumable is being used according to WPS.

Visual Hydro’s on piping.

Build packages for upcoming closure welds and branch connections.

Witnessed torque values on AG piping as well as UG piping.

Performed daily QSR’s on all material in laydown yard prior to use.

Recorded in process welding on amps and volts and travel speed in accordance to WPS.

Made sure internal pipe was clean prior to rack installation and documenting all in the builded clean form.

April 2016 thru June 2016

QC Turner Industries Corpus Christi

361-***-****

Lyondell Basell Refinery

Walked down packages.

Daily monitor of all welding being performed in accordance to WPS.

Weld mapped Isos where needed.

Performed visual on all Flange bolt ups.

Visual on Hydro’s including piping, heat exchangers, Fin fans.

Performed visual on all Psv’s prior to installation.

Made sure all consumables were stored properly.

Followed all safety rules and standards set by Lyondell basell.

February 2016 thru March

QAQC Construction & Turnaround Specialists

Coffeyville Kansas

325-***-****

CVR Refinery

Visual on Hydro's Pipe, Heat exchangers, Fin fans

Inspection of Psv's

Visual on all bolt up includes Psv's, Flanges, Valves, Heat exchangers make sure it's all done by specifications.

Random check on welding consumables. Random audits on all welding performed making sure all is as to specifications.

Permits sign in sign out.

Followed all safety rules and regulations set by CVR refinery.

Followed all speed limits set as to driving inside refinery.

January 11th thru February 2016

QAQC Ohmstede

Baytown Tx.

281-***-****

Exxon Mobile Refinery

Verifying PMI on materials not indentified.

Performing Hydro Visuals.

Review packages making sure all NDE requirements.

Issue of consummable usage as per specifications.

Random audits

Followed all safety rules and regulations.

October 5th thru November 5th 2015

QA QC Construction & Turnaround Services

Coffeyville, Kansas City

325-***-****

CVR Refinery

Coffeyville, Kansas City

Review packages making sure all NDE requirements are met by

specification. As to PT, PWHT, X-RAY, HYDRO'S. Performing random

audits as to consumable usage per spec, and storage. Verifying

PMI on material not identified. Performing change request

recommendations for damaged and or defective items. Filling out

JSA and checking out Hot Work permits on a daily base. Following

all safety rules and regulations set forth by CVR Refinery.

July thru September

QC PMI

Corpus Christi Tx.

361-***-****

Buckeye Tank Farm

Corpus Christi Tx.

Walking down packages in accordance with P&ID and drawing specifications, sketching asbuilts as needed.

Weld visuals as well as weld mapping.

Make sure welders are performing welds according to WPS.

Ramdon audits on consumable storage and right temperatures.

Making sure all Flanges are torqued to spec loads and sequence is followed.

Signed JSA and in all areas of inspection according to safety rules,and when operating motor vehicle following all rules and regulations.

QC March 5 thru June 6

Accurate Welding and Inspection

Portland Tx.

1-361-***-****

Capital Cement

San Antonio Tx.

Walking down packages making sure all materials listed

are in accordance to specification.

Witnessed torque on Frp pipe Flanges in accordance to specifications.

Also witnessed pneumatic test performed on piping as to checking for leaks and hold time on PSI incriments set forth.

Tested welders checking rootpass and final bend test visual.

Followed all safety rules and regulations.

QC January 2015 – February 2015

Onshore Quality Control Specialists

Austin Tx.

512-***-****

Plains Pipeline

Eunice New Mexico

Checked consumables for proper storage

Observed fitups for proper line up

Overlooking material checking for damages

Ocassionally checked rootpass concavity or convexity

Followed all safety rules and regulations

Followed with a daily report

QC September 2011- November 2014

Gulf Marine Fabricators

1982 Fm Rd 2725 Ingleside, Tx. 78362

1-361-***-****

Williams Project

Inspected welds

Performed audits on welders checked for parameters to meet specifications

Periodically checked consumable storage container updates

Checked that critical measurements met specifications upon completion

Followed all safety rules and regulations

Obeyed traffic rules while driving on company property



Contact this candidate