PEDRO J VAZQUEZ RIVERA
***** ****** **. ***. #*** San Antonio Texas, 78216 C: 618-***-**** *******.******@*****.*** Profile
I am a dedicated and detail-oriented engineer seeking a position as an Engineer or related position in a reputed organization, which offers key participation, team-oriented task, immediate challenge and a career opportunity. Professional Experience
Production Engineer 11/2015 to Current
Aisin Electronics in Illinois (AEIL) Marion, Illinois Successfully worked on assimilated systems for managing Industrial Production Processes, tested and evaluated coordinated systems. Determined Manufacturing processes, production standards to develop designs and upgrades to our Sensor lines. Applied statistical and mathematical calculations and methodology to prevent, acknowledge or eliminate current problems or waste, by tracking faults or defects. Worked on quality control objectives including multiple departments to improve communication, task efficiency and maintain the company first objective (Quality and safety first!). Supervised other industrial Engineers' activities as well as working with other engineers to develop new ideas and projects. Customer Service Representative 01/2015 to 11/2015 ASG Staffing Aurora, IL
Develop MS Excel Pivot Table for statistical analysis that resulted in an easy way to manage accounts and existing data. Recommendations were the entire office adopted. Managed numerous accounts and companies simultaneously. Maintained and managed office troubleshooting, filing and archiving. Adjust payroll and assist the manager in monitoring clients, payroll, orders and office maintenance.
Validation Technician 05/2014 to 01/2015
Professional Hepa Certificate Corp. Caguas, PR
Designed and developed a new program to enhance the current reports. Collaborated with engineers, project managers, FDA and ISO regulation regarding design parameters for client projects. Prepared structural drawings to enhance airflow, installation or reparation of air systems. Prepared accurate specifications for purchase of materials and equipment for field use. Drew sketches to accurate scale showing the relation of proposed installations to existing facilities and exact specifications and dimensions. Developed and organized records and maintenance reports for increased efficiency.
Industrial Engineer Coop 08/2013 to 12/2013
Ethicon Endo Surgery (J&J) Guaynabo, PR
For a major medical devices and surgical instruments company, created forecasts from historical data, analyze data and identify gap loss.
Industrial Engineer - Intern Student 01/2013 to 05/2013 Banco Popular de Puerto Rico Cabo Rojo, PR
For a major bank and financial institution, collect time data for the work time measurement and analysis to simulate the process using Arena Simulation Program. Identify the peak days and hours of the bank and which services/departments had the most demand to analyze flow. Used spaghetti diagrams to identify opportunities. Create new layout alternatives that improve people's flow.
Industrial Engineer - Intern Student 08/2011 to 12/2011 Angiotech Inc. Aguadilla, PR
For a branded surgical instrument manufacturer, perform a time study to create a working standard without affecting the machine velocity. Use the Waste Walk tool and Spaghetti Diagram to identify areas of opportunities. Brainstorm ideas to improve the area. Create new layout alternatives with economic analysis. Design and Implementation of Ergonomic Processes.
Assistant Manager 06/2010 to 07/2010
A-Z Kaes Humacao, PR
For an embroidery shop, in charge of the shop during my shift. Exceeded sales expectations and goals. Analyze the production flow and recommended new layout. Implemented new recommended layout to improve production and people flow. Develop a tracking program that saves the daily sales to improve and anticipate future sales.
Account Assistant 06/2006 to 07/2006
Amgen Inc. Juncos, PR
For a major pharmaceutical industry, in charge of making the employees checks. Keep track of payroll. Organize and archive documents.
Accomplishments
Statistical Analysis
Analyze data collected in the field to ensure a healthy environment and better OA and prepared a meaningful report.
Generated forecasts from historical data, analyze data and identify gap loss. The forecast is being used for the identification of reaching better AGP between affiliates.
Collect time data for the work time measurement and analysis to simulate the process using Arena Simulation Program.
Product Improvement
Analyze the production flow and recommended new layout or equipment.
Analyze the production Downtime and company defect to prevent or eliminate waste. Quality Control
Reduced costs by reducing gap loss.
Implement cellular layout and 5s with shadow boards to reduce transportation/ motion waste by 70% and scrap by 35%Innovative Design
Develop and challenge a new system/program that provides a comfortable way to make reports.
Verify scrap material, Customer returns and current issues to reduce such waste. Skills
Team player
Flexible
Fully bilingual (Spanish/American English)
Prototyping
Project management
Test Engineering
Training program implementation
MS Office
Quality control
Minitab
Process improvement
Arena Simulation Program
Failure Analysis / QA
Regulated environments (CGMP, OSHA,
FDA, ISO, GDP)
Lean Manufacturing
Six Sigma
PSpice
Ergonomic & Layouts Design's
TPS
Performance Testing
Education and Training
Bachelor of Science: Industrial Engineer 2014
UPR- Mayaguez Mayaguez, PR, USA
Training: Optical Laboratory Specialist (Army) 2012 Nostra - Navy School VA, USA
Design and Implementation in the Process Area.