CURRICULUM VITAE
•PRABIR GIRI EMAIL ID:******.******@*****.*** PH NO:-094******** /094********
CARRIER OBJECTIVE:-
To join a globally well known organization that is powered by intellect and driven by values which treats their employees as their assets &to join a team extremely hard working,willing to share ideas &insights with the younger generation,always prepared to have a fun as well as work .I wish a challenging position contributing to the success of the organization by my creative & innovative skills.
EDUCATIONAL SKILLS:-
QUALIFICATION
YEAR
BOARD/UNIVERSITY
PERCENT DIVISION
H.S.C.
2009
B.S.E.,ODISHA
35
3RD
ITI(ELECTRICAL.)
2011
NCVT NEW DELHI
85
1st
Operation & Maintenance of Power Plant of capacity of 76 MW
•Basic study of Thermal Power Plant operation.
•Power Plant Erection & Commissioning
PERSONAL EXPERIENCE:-
. L&T(Near L&t but road milumichampatti Srinagar Nagar podium Coimbatore Tamil nadu)
Designation: Panel board Wiring man
.Duration: 2011 to 2012
•Jindal South West LTD. (Vijay Nagar Works Bellary),KARNATAKA
Designation: turbine generator field operator
Duration : 14th may 2012 to 14th 08 2016
PERCENTAGE WORKING IN
. TATA STEEL KALINGANAGAR PROJECT ODISHA
Designation: technician(electrical)
Duration: august 29 2016 till date
Specification:-76Mw CDQ Power plant
BHEL making Turbine,Single cylinder(46 stages),Condensible,2 nos. controlled extraction with (spec. steam 3.7 T/H)& generator 76MW & Metro DCS(MAX DNA)
Single Drum water tube boiler Natural circulation Steam generation rate-72 T/H steam Pressure at Drum 10.4MPaG,superheater outlet Pressure 9.5 2.5MPaG allowable working pressure 11.6MPaG Temperature 540 5 C
*76MW CDQ POWER PLANT OPERATION:-I am working as a field operator in 76mw thermal power plant and have experience do all the activities related to shut down from operation side, I am familiar with power plant safety rules, Do all the normal during normal running plant.
WORK RESPONSIBILITY:- 76MW CDQ POWER PLANT
•Normal operation turbine side
•Effectively participated in Commissioning activities of turbine.
•Daily field infections.
•Maintain the daily report.
•Daily maintenance of equipment according to P.M.
•Make check list of every equipment.
•Mop Pump start up procedure & Isulation
•Aop Pump Startup procedure & isulation
•CW Pump Startup procedure & isulation
•Effectively handled plant emergencies like trip,black out.
•All Pump changeover procedure
•Daily energy production Reading report
•Turbine rolling procedure
•Calculation of HT/LT Switchgear
•Having responsibly in Electrical utility operation &ofHT/LT generator transformers, chiler, burbine
•Super power 500kw,415v DG Set and 2*63mva transform
•Preparing annual data power generation & distribution
•Operation 33kv ht panels and it’s accessories
TRAINING TAKEN:-
•Permit to work, Holistic approach by DUPONT.
•SOP FOLLOWING PROCEDURE
•Fire fighting system,Machine guauard
PERSONAL SKILLS:-
•Self confident & self motivated, Hardworking& energetic.
•Skilled in talking,initiating &leading the group,Punctual, efficient &well mannered.
•Good communication skills,I believe in growth through continuous learning& application of my knowledge.
PERSONAL DETAILS:-
Name: :PRABIR GIRI
Permanent Address: :AT/:JAYDURGAPATANA
:PO/VIA : DHAMARA
; DIST : BHADRAK,ODISHA-756171
Fathers name : BALARAM GIRI
Date of Birth :14/08/1993
Language Known :English,Hindi & Odiya
Gender : :Male
Marital status :Single
Hobbies : playing cricket, Reading stories &magazines, Listening
Music,making friends etc. …
DECLARATION:-
The above mentioned data are correct & true to the best of knowledge & belief.
PLACE: YOURS FAITHFULLY:-
PRABIR GIRI DATE: