Post Job Free

Resume

Sign in

Engineering Engineer

Location:
Mumbai, MH, India
Posted:
May 15, 2018

Contact this candidate

Resume:

NINAD SIDDHARTHA VAIDYA

**, *********, ***** *****, ******** (East), 421201

E: ac5gkh@r.postjobfree.com M: 981-***-**** P: 025*-*******

Objective: A challenging career in industrial automation including PLC engineering with a reputed organization to utilize acquired knowledge and skills and deliver best-in-class results.

Versatile Instrumentation Engineer with 13.5 years of rich experience in PLC/DCS based automation projects in varied sectors in India.

Good experience across project lifecycles of large projects in mining, material handling, petroleum retail automation and chemical process plants.

Comprehensive experience in engineering of automation systems, PLC panel engineering, PLC programming with extensive I/O lists, PLC ladder logic programming, HMI development, detail engineering and proposal engineering.

Skilled in developing solutions matching client requirements with the company’s product capabilities and deliver cost-effective systems.

Sound technical knowledge of modern automation products like Siemens Simatic S7-400 and S7-300 in hot redundant and redundant applications, Schneider PLC, Allen Bradley PLC and Yokogawa DCS.

Proactive results driven engineer delivering excellence through effective communication, coordination, planning and execution.

PROFESSIONAL EXPERIENCE

Thyssenkrupp System Engineering India pvt.ltd., Pune

Deputy Manager Jan2011 to Feb2018

Look after automation projects for Automotive clients

Projects Responsible for vendor co-ordination for engineering of the automation system, PLC panel engineering, and Human Machine Interface (HMI) design to meet production requirements and operator’s ease of operation.

1.JLR-Engine Assembly Machines- Siemens PLC system

2.Maruti Suzuki E08 -Conveyor system for Engine Assembly Line-Mitsubishi PLC system

3.FIAT-SC04 Body In white shop relocation project-Rockwell PLC system

4.Maruti Suzuki E15 -Conveyor system for Engine Assembly Line-Mitsubishi PLC system

Internal Projects and responsibilities:

1.IT setup for new premises with co-ordination of German colleagues and Siemens Communication (Unify).Worked as IT administrator till IT guy joined and handed over IT activities.

2.Datascan ERP setup for new premises with co-ordination of German colleagues and Datascan.Worked as ERP administrator till IT guy joined and handed over ERP activities.

2. UPS system installation for office premises with co-ordination of Emerson authorized system partner.

3. Kirloskar DG set installation for office premises with co-ordination with Kirloskar authorized system partner.

4. Smoke Detector System installation for office premises with co-ordination with Siemens authorized system partner.

Godfrey Phillips(I) LTD, Mumbai,

Deputy Manager-Electrical and Instrumentation, Dec2011 to Dec 2012(Team of 5 Engineers)

Report to the Engineering Manager and look after automation projects in Factory.

Responsible for the engineering of the automation system, PLC panel engineering, and Human Machine Interface (HMI) design to meet production requirements and operator’s ease of operation.

Responsible for the smooth handover from different electrical and instrumentation vendors e.g.Siemens,COMAS,Italy,Forbes Marshell,Wipro

Projects handled:

1.Tobacco Process Line-Primary Manufacturing Department-3000 I/O System with server client architecture.13 No S7-300 PLCs hook-up up on Ethernet with Wonderware archrestra system.

2.Boiler-8 Tonne Capacity –Nos-2, S7-300 PLCs-3 Nos-500 I/O system.Wonderware scada.

3.Wipro Water Treatment Plant-S7-300 PLC With WINCC SCADA-200 I/O system

4.Pneumatic Dust recovery System-S7-300 PLC with Wincc Flexible SCADA-100 I/O system

5.Utility SCADA project (Connecting 12 systems like boiler, compressors to one SCADA).Involved in making specification, technical discussion ect.

Establishing ISO 9001:2011 system in Factory.Passed Internal auditor exam taken by company.

SIEMENS INDIA LTD, Mumbai

Senior Executive, Jul 2006 to Nov2011(Team of 3 Engineers and 5 electricians and 1 draftsman)

Report to the Manager and look after automation projects in mining and materials handling plants.

Responsible for the engineering of the automation system, PLC panel engineering, and Human Machine Interface (HMI) design to meet customer requirements and operator’s ease of operation.

Coordinate factory acceptance tests (FAT) with the consultant and client to ensure on time delivery of the system to site and install and commission the PLC system at site.

Ensure smooth completion of the site acceptance tests (SAT), snag rectification and handover of the system to the client and project close-out.

Project Details

Twin Boom Stacker,Barrel Reclaimer and Transfer car machine at Noamundi Tata Steel Machines with Approximately 500 I/Os each.Includes panel engineering,HMI development,PLC programming and commissioning of S7-400H system given in each machine.

Coal handling plant of the Anpara Thermal Power Station, UPRVUNL UP (in progress): 3000 I/Os for the hot redundant Simatic S7-400 PLC of the coal handling plant with mechanical design by L&T. Automation of 2 stacker-reclaimers and 1 wagon tippler with 500 I/Os each.

Coal handling plant of Koderma Thermal Power Station, DVC Ltd: 3000 I/Os for the hot redundant Simatic S7-400 PLC of the coal handling plant with mechanical design by L&T. Automation of 2 stacker-reclaimers and 1 wagon tippler with 500 I/Os each.

Coal handling plant of Simhadri Super Thermal Power Station, NTPC Ltd: 500 I/Os for the hot redundant S7-400 PLC of 2 L&T stacker-reclaimers.

Iron ore handling plant, Paradeep Port Trust: 500 I/Os for the redundant S7-300 PLC system for 2 MBE make stacker-reclaimers.

Coal handling plant of Korba Thermal Power Station, CSEB: 500 I/Os for the L&T supplied stacker-reclaimer.

HONEYWELL AUTOMATION INDIA LTD, Mumbai

(Through Ma Foi Consulting)

Engineer, Feb 2006 to Jul 2006(Team of 3 Electricians)

Looked after of execution of jobs for installation and commissioning of Honeywell Retail Automation solutions at petrol/diesel outlets in and around Mumbai.

Projects included

Joaquim Indian Oil pump Deonar

Ravi Automobile, Ghatkopar

Sahara petrol pump, Santacruz

IBP petrol pump, Malad

SUPERTECH INSTRUMENTATION SERVICES INDIA PVT LTD, Mumbai

Engineer, Jul 2004 to Feb 2006(Team of 10 Electricans,10 Fitters and 1 Supervisor)

Participated in projects for chemical process plants looking after detailed engineering, panel engineering, erection, calibration and commissioning of PLC and DCS systems.

Projects included

Installation and commissioning of Schneider PLC, Fine Organics Industries, Mumbai

Installation and commissioning of Schneider PLC, Unitop Chemicals

Yokogawa DCS at USV Ltd, Chiplun

Allen Bradley PLC, Hikal Ltd, Mahad

EDUCATION

Diploma in Human Resources Management, Welingkar Institute of Management, 2005, First Class, 65%

BE Instrumentation Engineering, Mumbai University, 2004, First Class, 67%

TRAINING

Siemens PLC Programming

Siemens AC Drives

Siemens HMI

Internal Auditor for ISO9001:2011

PERSONAL PROFILE

Date of Birth: 26 August 1982

Languages: Marathi, Hindi and English

Nationality and Passport: Indian



Contact this candidate