Experienced Petroleum Engineer for * (Eight) years with strong subsurface background for oil and gas
field. Expert in maintaining and reservoir surveillance for mature field production and performing field asset review to develop reservoir depletion plans in order to achieve production delivery. High capability of performing integrated asset modeling using Prosper, modeling reservoir thru MBAL and integrated modeling thru GAP. Have experience of production optimization using data base management tool (OFM). Have experience in preparing annual work program and budget and presenting to Joint Venture, BOD and Goverment. Had international work experience in Italy as international assignment. Petroleum Engineer – 6 years Nov 2012 to Current
VICO Indonesia – Jakarta, Indonesia
Perform well and reservoir review thru geological and petroleum engineering aspect in order to generate well hopper for well intervention.
Reservoir surveillance and monitoring to update the reservoir parameter
Handle study for project of field sand and water management, debottlenecking and corrosion.
Reservoir modelling using Prosper, MBAL and GAP
Prepare the annual work & planning budget program for Company and Joint Venture
Reporting to Owner and Government regarding Company performance and production KPI Petroleum Engineer (International Assignment) – 1 year Jul 2015 to Jul 2016 ENI Headquarter – Milan, Italy
Perform asset and economic review in term of redevelopment for two field in Nigeria by proposing several work programs and brought production gain for 2000 BOPD with reserve ~10MMBO.
Perform production optimization for wells in Congo, Norway and Angola using Prosper to prevent early water breakthrough and sand production due to erosion rate limit
Multiphase pump optimization and planning thru GAP simulation for Italy field
Field restart up planning after operationally shutdown for six (6) month for Italy field to achieve previous field production for 12.4 KBOPD
Surveillance Engineer – 2 years Nov 2010 to Nov 2012 VICO Indonesia – East Kalimantan, Indonesia
Secure the production from existing well in critical
Monitor production in real time well head surveillance
Reactivation planning program for cyclic well
Monitor and witness perforation, coil tubing, slickline and other well intervention. VEM (Economic Model);
PETEX Software (Prosper, MBAL and GAP);
Eclipse (Simulation)
Emeraude (PLT interpretation);
Saphire (Welltest Intepretation)
OFM (Oil Field Manager
Bachelor Degree, Petroleum Engineering Aug 2006 to June 2010 Bandung Institute of Technology – Bandung, Indonesia
Graduated Cum Laude (GPA : 3.72 of 4.00)
Outstanding Academic Achievement from 2006 – 2010 Summary
Work Experience
Technical Skill
Ade Sebastian Sebayang
Apartemen Puri Casablanca D-509, Jakarta, Indonesia Phone: +628********** Email: ***.***********@*****.*** Linkedin: https://id.linkedin.com/in/ade-sebastian-sebayang-92731760 Education
Ade Sebastian Sebayang