Post Job Free

Resume

Sign in

Engineer Project

Location:
Multan, Punjab, Pakistan
Salary:
30000
Posted:
May 09, 2018

Contact this candidate

Resume:

Engr. Khawar Nazeer

Email-id : ac5eci@r.postjobfree.com

Mobile : 009***********

Alternate : 009**********

PEC Number : CHEM/10861

Domicile : Multan (Punjab)

Career Objective:

To pursue a challenging career in an internationally reputed engineering organization where I can do some value added work for the company’s benefit, customer Satisfaction and my professional growth. Seeking a supervisory position in a world class company, that will give me an opportunity to expand and explore the technologies and skills while realizing the vision of the company.

Organizational Experience:

Sui Northern Gas Pipe Lines Company Ltd. (Worked As a Project Engineer, C) Sep-21-2015 – Apirl-28-2018

Gourmet Beverage and Food Pvt LTD. (Shift In charge and Process Control Engineer ) Jun-08-2013 - Sep-19-2015

Worked As a (Process Control And Senior chemist In RO Plant)-Jan-06-2013-Jun-08-2013.

Job Profile & Key Responsibilities:

To plan and schedule optimum utilization of human and machinery/equipment resources within different construction sites

To deliver the work instructions to site supervisors for execution of construction activities

To monitor site/construction activities to ensure compliance with the given designs and company standards and policies

To constantly monitor site conditions and suggest design changes, if required, for efficient and timely completion of construction jobs

Developing project objectives by reviewing project proposals and plans; conferring with management

Determining project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements

Maintaining project schedule by monitoring project progress; coordinating activities; resolving problems

Preparing project status reports by collecting, analyzing, and summarizing information and trends; recommending actions

To mark the design drawings for changes to facilitate As-Built Drawings

To make As-Built sketches for making As-Built Drawings

To managing relationships with Suppliers, Port authorities, Shipping agents, Third party surveyors, Terminal operator and Gas transport companies very efficiently.

Ability to think flexibly, self-motivated, integrity and confident.

Effective presentation and public speaking skills. Ability to organize, write & deliver concise, focused & persuasive high-quality presentations.

The Strong analytical and logical skills, excellent planning, team work, interpersonal, analytical, negotiation& management skills, Result oriented and ability to work with public as well as private stakeholders.

To coordinate with other agencies/department; Irrigation, NHA, Railway, PTCL, WASA, for obtaining crossing and ROW permissions and other construction activities

To carry put pipeline relocation jobs, as and when required

To prepare and report the Daily Progress achieved on Construction sites

To make sketches showing the completion status of the project

To conduct safety talks on sites/construction camps for HSE awareness

To ensure implementation of Company’s HSE policies in all construction activities

To coordinate/ correspond with Chief Engineer Construction/ EIC on technical issues

To coordinate with Field Purchase & Store department for provision of required material

To prepare the Material Reconciliation Report

To coordinate with Transmission and Distribution departments regarding testing/commissioning of Transmission/Distribution lines

Installation and commissioning of Csd line.

Installation and Commissioning of Chiller Room, Boiler Room, Compressor Room, Co2 Section, understand the operating and working condition parameter and resolve the problem related to it.

Installation and Commissioning of Pasteurization and Syrup Room, understand and control the process related to it and handle the process respectively.

Installation and commissioning of RO plant, understand and handle the process related to it.

Installation and Commissioning of Husky Perform Plant, Operate and control it.

Operate the Krones Mixer manpower handling, and physical inspections of plant equipment, supervision of outstanding jobs, communication with maintenance department. Safety measures, load management, maintaining discipline, and preparation of daily production report.

May Handle Trouble shouting Related with Beverage Plant.

Control the RO Process and resolve the problem related to it.

Worked as a process control engineer in the Installation and commissioning of Krones Csd line.

Perform all the quality Control Tests

Decision making on routine problems and during emergency situations in consultation with the production manager and higher management.

Operational and Quality Parameters Control RO (Reverse Osmosis) Plant.

To check the Parameters on PLC.

To check he quality and availability of the raw materials.

To check the stock and sale of the previous day.

To check the calibration of LAB Instruments

To check the availability of LAB Instruments.

To assure GHP and GMP on the Plant.

To check the light men attendance and ensured their discipline.

Properly prepare the all chemicals solutions

To check and manage the quality of CSD Line.

Responsible for all the quality tests T.A, Ts, Torque, G.V, Brix, SSTand and C.I.P etc.

To check the notify lines problems, prepare the report and discuss with his senior management.

To check the water treatment R. O plant and check the quality of treated water and mineral water.

Do the quality of Calcium chloride, Magnesium Sulphate, Sodium bi carbonate.

Do the quality of concentrate chemicals.

Do the quality Assurance of CSD bottles which are available in the shipping Hall and retention room.

Prepare the Production record of CSD and 19 Liter, water Bottles shift wise, whole day and end of the month and report to Q.C.M.

Prepare the CO2 consumption report of the day and report to Q.C.M.

To check the Quality of CO2 when purchase the outside company

Visit the syrup room and check the record of syrup tanks.

Maintain the CIP record of CSD lines and Water Plant.

After complete and start the duty handling take over the charge with carefully.

To Co-ordinate with the production and the engineering departments to devise control of operating parameters to bring about consistency in product of specified quality and to achieve Product Target.

Project during B.Sc Engineering

Main Project

Objectives:

Production of 10ton/day Butyl Rubber from Petrochemical.

Implant Training:

One month Internship at PRODUCTION PLANT of

FECTO CEMENT LTD.

(June 1, 2011- June 30, 2011)

Two Month Trainee Internship at Beverage Plant of NORTHERN BOTTLING COMPANY (PEPSI) PRIVATE LTD.

(June 15, 2010-Aug 15, 2010)

Three Month Internship at Sulphuric Acid Manufacturing Plant of MUSA PAK CHEMICAL INDUSTRIES PVT LTD.

(June 6, 2009 - Aug 30, 2009)

Educational Qualification:

B.Sc Chemical Engineering (2008 - 2012)

University of Engineering & Technology (UET) Lahore

At NFC-IEFR Faisalabad

3.144/4.00

Intermediate (D.A.E Chemical) 2008

Punjab Board of Technical Education Lahore. (Swedish Institute of Technology Multan).

2718/3400

Matriculation (2005)

Multan Board of Intermediate and Secondary Education Multan.(Govt Rafah-e-Awan High School Multan)

503/850

Computer Skills & Software Proficiency:

Operating System : Windows (98, XP & Window 7,8) .

Software : Desk Top Publishing.

Simulation Software : AutoCAD, Aspen plus, Mat lab, Visual Basic, CAD/CAM

Microsoft Offices : Word, Excel, Power point etc

C++

Hobbies:

Internet Browsing & Surfing

Playing Football, Cricket

Current Affairs

Reading Books

Extra-Curricular Activities:

Sport’s Men

Report written and Presenting Skill

Personal Particulars:

Father Name : Muhammad Nazeer

Sex : Male

Date of Birth : 30/10/1989

Marital Status : Unmarried

Nationality : Pakistani

ID Card No : 36302-7302272-9

Passport No : ES9822721

Residence : House Number 321 Madina Colony near New Grain

Market Vehari Road Multan, Pakistan-60000

Language Proficiency:

English, Urdu, Punjabi, Saraki

Interpersonal Competencies:

Good written and verbal communication skills

Decision making, Listening, Multi-tasking

Public Presentation skills, Planning & Organizing

Self-motivated, Hard Working, Punctuality

Ability to work independently as well as in group

Open minded and Sharp Observation Skills

Declaration:

I make sure that all the above give statement is true and Original as per my Knowledge and Concern.

Date: Yours Sincerely,

Place: Lahore (Engr. Khawar Nazeer)



Contact this candidate