Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Mandaluyong, NCR, Philippines
Posted:
May 08, 2018

Contact this candidate

Resume:

Ferdinand F. Par [pic]

#** ********* **.,*** ****** Hts.Subd.,

Binangonan Rizal, Philippines

Contact No.+639********* ( Phil. No.)

Email: ac5du4@r.postjobfree.com

ac5du4@r.postjobfree.com

Educational Attainment

BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING

Eulogio "Amang" Rodriquez Institute of Science and Technology

Nagtahan Sampaloc Manila,

Philippines

March 21,2000 (Year Graduated )

Objective:

To continuously develop my skill in my chosen field of profession as

Electrical Engineer

Interconnectivity with other profession and to attain versatility and

adequate engineering technical

Knowledge as my instrument to render satisfactory service and performance.

Employment History:

. HYUNDAI ENGINEERING CO.LTD

. HYUNDAI 41 TOWER

. 917-9.MOK-DONG, YANGCHEON-GU, SEOUL.158-723,KOREA

. Tel:82-2-2166-8114

Project Assigned:

Electrical Supervisor: TACE ETHANE CRACKER AND PE/PP PLANT PROJECT

Engineer TURKMENISTAN REPUBLIC

FEBRUARY 14,2016 TO

DECEMBER 27,2017

Duties and Responsibilities:

. Responsible to analysis layout drawing and supervision for

installation of cable tray for power and control cable

. Responsible to monitor of electrical priority activity specially in

cable pulling of HV, MV and LV cable also control cable

. Responsible to supervision of meggering test of power and control

cable

. Responsible to supervision and monitoring of cable termination for the

interconnection diagram for power cable and control cable

. Responsible to check of daily work report of the subcontractor

specially cable pulling and termination to monitor daily percentage

accomplishment report

. Responsible for supervision of installation of heat tracing cable and

termination

. Responsible to check electrical equipment layout and cable routing

layout form internal to external to avoid mismatch layout of

architectural and civil layout

. Responsible to supervision of lighting from installation of units,

termination of cable and final checking of testing of normal and

emergency lighting

Project Assigned:

Electrical Supervisor: UZ-KOR GAS CHEMICAL PROJECT

Engineer UZBEKISTAN REPUBLIC

SEPTEMBER 24, 2013 TO

JULY 10, 2015

Duties and Responsibilities:

. Responsible for supervision of electrical activities at Oil Type

Transformer installation 35kv,33.25MVA and 6.3kv,transformer, MV

Switchgear GIS,LV Switchgear, MCC panel installation and also to

check mechanical layout for electrical

. Responsible to analysis layout drawing and supervision for

installation of street lighting, area lighting,fire alarm,paging

system and communication

. Responsible to monitor of electrical priority activity specially in

cable routing activities

. Responsible to supervision of Cathodic protection installation for

tank and pipe line

. Responsible for supervision installation of conduit for lighting, fire

alarm units horn, beacon, bell, manual call station and local fire

alarm panel and cable pulling with megger test

. Responsible to check of daily work report of subcontractor and weekly

report to monitor daily activities and also weekly plan

. Responsible for supervision of installation of battery charger panel,

UPS panel, EMCC panel, LCP, Protection panel, CB panel, patch panel

Electrical control system(ECS),bus duct, Dry type Transformer

installation and VSDS panel Inverter

. Responsible to check electrical equipment layout and cable routing

layout form internal to external to avoid mismatch layout of

architectural and civil layout

. SAMSUNG SAUDI ARABIA CO.LTD

. P.O BOX 35816 - JUBAIL IND.CITY 31961

. Kingdom of Saudi Arabia

. Tel:+966*********

Project Assigned:

Electrical Supervisor: WASIT CO-GENERATION PROJECT (ARAMCO)

Jubail Industrial City

Dec, 02, 2012 to April,17,2013

Duties and Responsibilities:

. Responsible for prepare daily work permit in pre-commission test of

13,8kv Switchgear LV Switchgear motor control centre and Oil Type

Transformer 230kv,

. Responsible to prepare pre-commission document for pre commission test

230kv oil type transformer 13.8kv Switchgear LV Switchgear and MCC

PANEL

. Responsible for supervision of pre-commission test.

. Responsible to check and analysis fire alarm lighting communication

and paging system layout and diagram for power and control cable

schedule.

. Responsible for supervision of cable tray installation, MCT(multi

cable transit) conduit, fire alarm units horn, beacon, bell, manual

full station and local fire alarm panel

. Responsible to check of daily work report of subcontractor and weekly

report to monitor daily activities.

. Responsible for supervision of installation of battery charger panel,

UPS panel, MV Switchgear, LV Switchgear, MCC panel, EMCC panel, LCP,

Protection panel and preparation of pre-commission document for

equipment.

Electrical Supervisor: SOCC - ALUMINUM ALKYLS PROJECT (BY SABIC

STANDARD)

Jubail Industrial City

April,17 2012 to Dec.01,2012

Duties and Responsibilities:

. Responsible in the supervision of installation of 34.8 kva transformer

. Responsible in the supervision of installation of cable tray, lighting

units

LP panel, LCS,CCTV camera, Fire alarm units.

. Responsible in the supervision of Installation of Switch gear, MCC

panel EMCC,

UPS panel, Battery charger chloride, SF6 PNL,LV VSD

panel(Rockwell) and Power Capacitor(ABB).

. Responsible in the supervision of cable pulling for power cable and

control cable.

. Responsible in the supervision of cable testing megger of power cable

and control

. Responsible for supervision of installation of battery charger

panel, UPS panel, MV Switchgear, LV Switchgear, MCC panel, EMCC

panel, LCP, Protection panel and preparation of pre-commission

document of equipment.

. Cable supervision of HI-POT test of medium Voltage cable.

. Responsible in the supervision of motor solo run test for motor

winding test and

Vibration monitoring test

. MEEDCO & HYUNDAI PROJECT ( ARAMCO STANDARD)

. DaemYoung GEC Co.,LTD.

. DaemYoung Bldg., 125-B Yangjae- dong-gu,Seoul,Korea.

. Tel:82-2-2182-3900

Project Assigned:

Electrical Supervisor: Karan Gas Field Development Project(ARAMCO)

Engineer Jubail Saudi Arabia K.S.A

June 24,2010 to June 25,2011

Duties and Responsibilities:

. Prepare weekly work permit every week for a daily work activity

. Prepare Electrical drawing for detail installation of all cable tray,

lighting

Fire alarm.

. Responsible in the supervision of installation of the LCS, MCC panel,

EMCC panel

and UPS panel.

. Responsible to prepare work shop drawing for approval of additional

cable tray

Support at pipe rack and substation.

. Responsible to request of additional materials and tool needed

controller

. Responsible to review electrical drawing and prepare technical queries

for any

Discrepancies that need some clarification and confirmation.

. Responsible to daily work progress report .

. CARLO GAVAZZI SAUDI ARADIA CO.& BONATTI S.P.A

. Kazakhtan Branch

Project Assigned:

ELECTRICAL SUPERVISOR: Gas Plant Carabatan Project(Europe Standard)

Engineer Kazakhtan Republic

May,2009 to Nov,2009

Duties and Responsibilities:

. Responsible in supervision of installation of the control panel

. Responsible in the supervision of cable pulling for power cable and

instrument cable.

. Responsible of the installation of temporary power panel and

termination of power cable.

. Responsible the electrical layout of new building of Bonatti office.

. Responsible to daily work progress report at construction manager

Responsible for supervision of installation of battery charger

panel, UPS panel, MV Switchgear, LV Switchgear, MCC panel, EMCC

panel, LCP, Protection panel and preparation of pre-commission

document of equipment.

. Cable supervision of HI-POT test of medium Voltage cable.

. Responsible in the supervision of motor solo run test for motor

winding test and

Vibration monitoring test

. CARLO GAVAZZI ARABIA CO.LTD

. Jeddah,Saudi, Arabia 21444

. P.O Box 15291

Project Assigned:

ELECTRICAL SUPERVISOR Shaybah CPF Project GOSH-4 (ARAMCO PROJECT)

Engineer Shaybah, Saudi Arabia

May, 2008 to March,2009

ELECTRICAL SUPERVISOR Rabigh Petro-Chemical Project ( ARAMCO PROJECT)

Engineer Rabigh, Saudi, Arabia

August, 2007 to May,2008

Duties and Responsibilities:

. Responsible in the supervision of electrical works such as fabrication

and installation of cable tray & runways, lighting poles and control

panels.

. Responsible in the supervision of installation of the control cabinet,

switch gear, LCS motor,

Communication rack runway and conduit.

. Responsible in the supervision of cable termination in switch gear

panel, MCC panel to motor supply and communication patch panel

(modular and fiber Optic patch panel).

. Responsible in the installation of horn and beacon for H2S and gas

detector.

. Responsible in the supervision of installation of the telecom copper

cable & fiber optic cable

In under- ground installation and aerial installation.

. Responsible in supervision of the termination of copper cable and

transition splicing of fiber

Optic cable

. Responsible in the installation of UTP CAT 6 & CAT 3 cable and plenum

cable.

. Responsible in the installation of telecom rack, data & telecom

cabinet equipment

Installation.

. Responsible in the Plant paging system installation of the junction

box and call station, acoustic booth and speaker in Internal and

External

. Responsible in the supervision of termination of paging system cable

from call station, speaker, junction box to main panel of paging

system

. Responsible in the installation of junction box of CCTV and CCTV

camera units in external.

. Responsible in the supervision of installation of power cable,

dressing and termination of CCTV camera supply.

. Responsible in the supervision of Fiber optic cable dressing and

splicing for the CCTV camera.

. Prepare As-built drawing.

. Review and recommend solution to revise drawing for cable and lighting

for both electrical and communication.

Site Electrical Maintenance: Steel Centre Philippines

Amang Rodrequez Ave. Manggahan,

Pasig City, Philippines

February 07, 2003 to June 30 2007

Duties and Responsibilities:

. Responsible to conduct of inspection in maintenance power supply for a

daily work in proper procedure for safety.

. Prepare electrical drawing and supervision in the actual electrical

construction.

. Prepare cost Estimate.

. Set up the temporary power cable supply for mobilizing electricity in

the project site.

. Installation of temporary cable wire from main panel to the

distribution power supply.

And termination of 500mcm cable and 95mm cable wire from

distribution power supply.

. Installation of temporary transformer three phase step down with 440v

to 220v with AC machines.

. Operate the generator with capacity of 1500kv and maintenance.

Cadet Engineer: Well Constructing Corp.

1954 Campillo St. malate, Manila

Dec.05,2001 to Feb.04 2003

Duties and Responsibilities:

. As cadet Engineer purchaser of all electrical material and equipment

requested by project engineer with the management, my responsibility

is to conduct and attend bidding of material and equipment from 3 to

more supplier and select suitable prices commensurate to quality

required by the company.

. Received and inspect the material delivered in accordance to the

required material specification.

. Compile all receipt and document of the material received for monthly

inventory.

Cadet Engineer: Flores Construction and Electrical Corp.

617 J.P.Rizal Makati City, Philippines

March 2000 to Nov.2001

Duties and Responsibilities:

. Responsible to present the company proposal and company profiles into

the establishment and company's need electrical and mechanical

maintenance services.

. Responsible to conduct inspections of defective equipment for

maintenance problem of building to estimate cost of damages and

suggest the possible solution in maintenance .

. Responsible to present company profile with working procedure and

warranty of the job.

Seminars and Trainings:

. February 16,1999 Wiring Design Calculation

Short Circuit Calculation and

National building code

. September 10,1999 Motor Control, Instrumentation and

Control System

. December 01,1999 Grounding

Extra Curricular Activity:

. Public Relation Officer, IIEE - SEES Chapter (Earist) 1999 - 2000

Special Skills:

. Computer literate, Microsoft Word / Excel and auto cad

. Ample knowledge in the analysis of Structural Design Architectural

design and Civil Design

. Ability to make Electrical Design

Personal Information:

. Birthday : May 31, 1974

. Birthplace : Infanta, Quezon

. Age : 43 years old

. Height : 5' 7"

. Weight : 175 Lbs.

. Civil status : Married

. Spouse : Michelle T. Par

. Religion : Roman Catholic

FERDINAND F. PAR

Applicant



Contact this candidate