SYED ATIF QAMAR
Contact # : ****-315-***-****
E-mail : **********@*******.***/****.*****@*****.***
Skype : Syedatif 9
PERSONAL DATA
Date of birth : 09-08-1977
Nationality : Pakistani
Languages Known : English, Urdu, and Arabic
Passport No. BW4227781
Expiry Date: 01-March-2020
N.I.C # 42101-7327778-9
Total No of Experience: 16 Years
CARRER STATEMENT
I consider myself to be totally professional and goal driven, always aspiring for the top regardless of my position. My skills are well supported by an insatiable appetite for management and planning and for sustainable development, a confident approach and a cheerful and levelheaded personality. I possess an ability to motivate others achieve positive outcomes and results. I believe in striving to exceed the expectations of my employer and client. I demand only the highest standard of work from myself and therefore lead by example.
QUALIFICATION
Bachelor of Technology (B-Tech) (Passing year 2007)
Diploma of Associate Engineer in Electrical Technology (Passing year 2002)
COMPUTER SKILLS
MS Office – Excel – PowerPoint - Internet & E-mail.
PROFESSIONAL EXPERIENCE IN PAKISTAN
1.Period : From July 2016 to till date)
Position : Asst Manager (Electrical Deptt)
Company : Shahi Enterprises Pvt, Ltd
JOB RESPONSIBILITIES.
Monitoring of field progress activities.
Participating in weekly progress meetings.
Monitoring progress and prepared daily progress report.
Assemble, install, test, and maintain electrical or electronic wiring, equipment, appliances, apparatus, and fixtures, using hand tools and power tools
Diagnose malfunctioning system, apparatus, and components, using test equipment and hand tools, to locate the cause of a breakdown and correct the problems.
Connect wires to circuit breakers, transformers, or other components.
Inspect electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment or repair, and to ensure compliance with codes.
Test electrical systems and continuity of circuits in electrical wiring, equipment, and fixtures, using testing devices such as ohmmeters, voltmeters, and oscilloscopes, to ensure compatibility and safety of system.
Plan layout and installation of electrical wiring, equipment and fixtures, based on job specifications and local codes.
1.Period : From July 2015 to 01 June 2016)
Position : Electrical Engineer
Project : Artistic Fabric-Lucky One Hyper star Bahria power plant
Construction of Building
Company : Industrial Engineering Services
JOB RESPONSIBILITIES.
Installation of Fire & Security System.
Assemble, install, test, and maintain electrical or electronic wiring, equipment, appliances, apparatus, and fixtures, using hand tools and power tools
Diagnose malfunctioning system, apparatus, and components, using test equipment and hand tools, to locate the cause of a breakdown and correct the problems.
Connect wires to circuit breakers, transformers, or other components.
Inspect electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment or repair, and to ensure compliance with codes.
Test electrical systems and continuity of circuits in electrical wiring, equipment, and fixtures, using testing devices such as ohmmeters, voltmeters, and oscilloscopes, to ensure compatibility and safety of system.
Plan layout and installation of electrical wiring, equipment and fixtures, based on job specifications and local codes.
PROFESSIONAL EXPERIENCE IN (SAUDI ARABIA)
2.Period : From August 2013 to June 2015
Position : Electrical Engineer
Project : SEC-COA Construction of 132/13.8kV S/S Al-khdood Najran.
.
Company : SAUDI TECHNOLOGIST ENGINEERING CONSULTANT (SATECH)
JOB RESPONSIBILITIES.
Prepare daily reports of inspections performed and results of inspections.
Erection of Steel Structure such Towers and Equipment Support.
Installation of Different Type Bus Bars Such AIS and in GIS
MV and LV Cabling and Termination
Installation of Capacitor Bank with protection Reactors, Unbalance CT.
Installation of Power Transformers and their different parts
Installation MV Switchgear.
Installation of Control Panels
Prepare daily reports of inspections performed and results of inspections.
Manages all site work and ensures that it is executed in accordance with the contract approved specifications, drawings,
Prepare daily reports of inspections performed and results of inspections.
Manages all site work and ensures that it is executed in accordance with the contract approved specifications, drawings,
3.Period : From December 2011 to July 2013 (19 Months)
Position : Electrical Engineer
Project : SEC-COA (CN# 10931162/00) Construction of Dynamic Reactive power compensation central region (Part-1) SVC at Hiteen 9005 SVC 380/25kV SVC with (600MVAR along with additional 200MVAR
Company : SAUDI TECHNOLOGIST ENGINEERING CONSULTANT (SATECH)
JOB RESPONSIBILITIES:
Installation of 380Kv Gantry Structure as per SEC Specification.
Installation of TSC, TCR, Harmonic Filters & Power Transformer inspection as per SEC Standard Quality & Specification.
During construction of new buildings, visits the project site and inspects the installation of the building's electrical system to find defects. While making sure that the system is working properly, also makes sure that the electrical wiring systems comply with existing building codes. Other electrical components, such as air conditioning systems and generators, are also checked to make sure they are working properly.
Inspects equipment’s such as outlet boxes, conduits, wires, switchboards, transformers, and cabinets for compliance with specifications and approved material lists.
Inspects electrical installations to determine that materials and workmanship comply with plans, specifications, contracts, and applicable codes and regulations.
Prepare daily reports of inspections performed and results of inspections
Makes periodic inspections of electrical installations and maintenance completed by contractors.
Dismantling & Installation of line controlling equipment Isolators, Circuit Breakers, (CT) Current Transformers, (PT) Potential Transformers and their connectivity with main bus bars in case of permanent faults.
Routine inspection of the grid station equipment i.e. Air Pressure, SF6 Gas Pressure of Breakers, Oil level of C. T’s, P. T’s, Transformers, Counter-reading of breakers, lightening arresters, Visual inspection of C. T’s P. T’s.
Inspects electrical installations for use of proper materials, and compliance with electrical code requirements; conducts tests and issues certificates of inspection and approval or correction notices.
Ensuring the workmanship is of a high quality, to the projects specifications and to the client’s requirements.
Maintains a daily log of inspections made and corrections needed and prepares reports as required.
To arrange the shut downs for routine maintenance and emergency maintenance on Power Transformers/Breaker including washing and cleaning of insulator posts of C. T’s, P. T’s & Transformer bushings. Toping up of oil level and when required for transformers. Measurement of Contact Resistance of breakers, isolators, opening / closing timing of breakers. Mechanical parts inspection and cleaning, greasing & lubrication. Verification of local remote operation of all the equipment. Tightening of Nuts & Bolts, tightening of clamps & structure. Replacement of spare parts, Gaskets, MCB & Magnetic Contactors if required.
4.Period : From May 2010 to November 2011 (18 Months)
Position : Electrical Engineer
Project : SEC-COA (CN#10931014/00 &) Construction of New Hiteen 380/132/13.8kV BSP (9005 at PP-5 & at Hiteen 9005.
Company : SAUDI TECHNOLOGIST ENGINEERING CONSULTANT (SATECH)
JOB RESPONSIBILITIES
Installation of insulators and associated hardware and fittings.
Installation and testing of structure’s grounding system.
To arrange the shut downs for routine maintenance and emergency maintenance on Power Transformers/Breaker including washing and cleaning of insulator posts of C. T’s, P. T’s & Transformer bushings. Toping up of oil level and when required for transformers. Measurement of Contact Resistance of breakers, isolators, opening / closing timing of breakers. Mechanical parts inspection and cleaning, greasing & lubrication. Verification of local remote operation of all the equipment. Tightening of Nuts & Bolts, tightening of clamps & structure. Replacement of spare parts, Gaskets, MCB & Magnetic Contactors if required.
Tower and foundation testing.
To keep the DC Battery Charger & Battery Sets healthy by checking its total voltage, voltage/cell, electrolyte level, specific gravity, corrosion etc.
Testing and commissioning.
Arrangement of Stringing Sag and Tension Charts as per SEC specification.
Verifying technical compatibility of vendor equipment’s and materials.
Soil investigation and soil resistivity measurements
Communicate and coordinate project activities with project engineer, customer representatives, and others as needed.
Prepare daily reports of inspections performed and results of inspections.
Perform technical inspection work involving the use of independent judgment and personal initiative.
Analyze electrical problems; identify alternative solutions and project consequences of proposed actions.
Apply electrical knowledge and follow proper inspection techniques to examine workmanship and materials and detect deviations from plans, regulations and standard construction
.
Reviews plans and specifications of various electrical systems and makes recommendations to architects and engineers for improvements.
Maintains a daily log of inspections made and corrections needed and prepares reports as required.
Coordinates the work of other specialty inspectors on electrical contracts.
Performs related duties as assigned.
Coordinate with upper management in case of tripping or damage caused to any equipment
4. Period : From July 2005 to August 2007 (25 Months)
Position : QA/QC Electrical Engineer
Project : Shoaibah-PHASE III water Transmission System (SWCC Project) 14202-003-B
Company : Saudi Services for Electro Mechanical Works Co,Ltd (Rashid-Al-Rashid Group)
JOB RESPONSIBILITIES:
Create design documents and drawings for new transmission and substation projects including structural specifications and physical layouts,
Ensures that all construction drawings are updated, according to site modifications changes, etc, regularly.
Conduct in-progress inspection and witness all testing activities to verify that products or assemblies meet the requirements and to ensure compliance with quality plan.
Monitoring of field progress activities.
Making R.F.I (Request for inspection) for client and getting approval for necessary inspections.
Participating in weekly progress meetings.
Monitoring progress and prepared daily progress report.
Liaison between client and consultant Provide technical support and drawing needed for construction.
Checks manpower and equipment requirement at site.
EXPERIENCE IN (PAKISTAN)
5. Period : From Feb 2002 to June 2005 (37 months)
Position : Assistant Electrical Engineer
Project : Textile processing unit
Company : Chemi Group of Industries ChemiTex Ltd)
JOB RESPONSIBILITIES:
Assemble, install, test, and maintain electrical or electronic wiring, equipment, appliances, apparatus, and fixtures, using hand tools and power tools
Diagnose malfunctioning system, apparatus, and components, using test equipment and hand tools, to locate the cause of a breakdown and correct the problems.
Connect wires to circuit breakers, transformers, or other components.
Inspect electrical systems, equipment, and components to identify hazards, defects, and the need for adjustment or repair, and to ensure compliance with codes.
Test electrical systems and continuity of circuits in electrical wiring, equipment, and fixtures, using testing devices such as ohmmeters, voltmeters, and oscilloscopes, to ensure compatibility and safety of system.
Plan layout and installation of electrical wiring, equipment and fixtures, based on job specifications and local codes.
Install ground leads and connect power cables to equipment, such as motors.
Assist to switchgear and instrumentation vendors in wiring modifications of control circuits for high voltage 11kV / 3.3kV, low voltage 440V switchboards including functions test.
Carry out DC pressure test in each HV and LV vacuum circuit breakers, voltage transformers, and bus bars using Hi-pot tester.
Carry out all Electrical Commissioning works in all electrical equipments such as MV/LV Switchgear
PERSONAL STRENGHT
Analysis and design of various requirements, very good logical thinking ability a high sense of adaptability, raising to the need of the hour and willing to work delicately for an organization which rewards perfection.
I hereby certify that the above-mentioned information’s are true and correct to best of my knowledge and belief.