Post Job Free
Sign in

Manager Project

Location:
Durban, KZN, South Africa
Salary:
40k
Posted:
May 04, 2018

Contact this candidate

Resume:

Curriculum Vitae Darryl Shaun Dunn

JANUARY – **** ID No: 730-***-**** 080

Address : ** ******* ****, *****, ******, 4052 South Africa

Cell No : +27-79-222-**** /062-***-****

R

P R O F I L E

I am a competent, hardworking and pro-active CONSTRUCTION SUPERVISOR

-Mechanical, Fabrication, Instrumentation/Piping) with experience in Industrial Engineering, Petro-chemical, Paper Pulp industries, Mining & Power Stations. P R E V I O U S WO R K S T R E N G T H S

I have 25 years construction experience specializing in multiple installation works and equipment of Mechanical, Electrical, Instrumentation & Piping discipline. I am computer literate with MS WORD, EXCEL, POWER POINT, MS Projects. I am well learned in P&ID’s, Cable Block diagrams, Instrument Hook Ups, Cable Schedules, Cable Racking layouts, Isometric drawings & QCPs. I have worked out the country & have no problems adjusting to change. O B J E C T I V E

To partner with an organization that effectively utilizes my Supervision skills and experience to improve safety and enhance business. M Y R E S P O N S I B I L I T I E S A S A C O N S T R U C T I O N S U P E R V I S O R / I N T E N D E N T

Ensure that all assigned personnel and construction contractors supervision and manpower are fully instructed and motivated with respect to Company Health, Safety, Environment (HSE) policy, site security, site regulations, permit to work procedures and instructions and Client requirements.

Ensure that all personnel adhere strictly to the latest approved for construction (AFC) project drawings, specifications, procedures and site instructions

Ensure by leadership and guidance, that all contracted works under my control meet all practical, commercial, requirements of productivity, quality and contract completions.

MY DUTIES AS A CONSTRUCTION

SUPERVISOR/INTENDENT

Organize and manage daily coordination meetings with Site Team and Sub-Contractors.

Keep Management informed and updated about the construction status

(reporting daily / weekly / monthly to Site Manager/Project Manager

Interface with Client Representative for field operations and relevant schedule targets.

Attend meetings with Client.

Order material as per Material Take Off and B.O.M

Inspection, sign and hand over of equipment

Daily diaries and man-hours recorded

Liaise with Stores for lead time on procured items and equipment.

Supervise and co-ordinate construction activities & liaise with engineers within assigned areas. Provide daily supervisory surveillance checks and records, ensuring that contractor’s management and supervision are providing safe working conditions and permit procedures, all required competent personnel, and protective equipment.

Agree method statements, risk assessments and job safety analysis. Ensure that all work is carried out in accordance with the agreed method statements.

Ensure that all hazardous activities are covered by an agreed risk assessment and method statement prior to commencement of work.

Routinely study, check, review and validate all personnel work scopes, ensuring all contractors proper interpretation and compliance with latest revision AFC drawings and specifications.

Ensure that relevant personnel carry out the receipt, storage, checking, test and calibration of instruments to comply with the project specifications and contract schedule.

Ensure contractor’s fabrication works are installed on a timely basis to allow schedule completions as per contract.

Ensure Mechanical & Piping contractors work hand in hand with E&I contractors in assisting QA/QC department in hand over and selling of packs to client.

Ensure all workers under me will ensure good engineering practises.

Motivate and involve all personal to team work, meet client demands and have a Zero-Tolerance approach to safety

Ensure personnel carry out all excavations and trenching in a logical fashion, minimizing site disruption and that they provide safety barriers, signage and trench crossings in accordance with the Company HSE plan.

Ensure that all personnel and commissioning personnel carry out, witness and record all instrument and check requirements in accordance with the agreed commissioning schedule and all record documentation is available on a timely basis to facilitate system and equipment handover and start up.

Ensure efficient use of specialist vendor representatives, arranging contractor support and Client witness as required in accordance with the commissioning handover and start up schedule.

Complete project with no fatalities or serious injury and a successful hand over thus enhancing further business opportunities EDUCATION

GRADE 11

Fairvale Secondary School – 1992

Subjects: Business Economics, Geography, History, Maths, English, Afrikaans COURSES ATTENDED

Swagelok Tubing & Compression Fittings

IRCA Training for Construction Supervisors(IRCON) Course

Hazard Identification & Risk Assessment (HIRA) Training Course

Legal Liability for Supervisors Course

C O N T R A C T WORK E X P E R I E N C E

2017 (Vopak Growth 4- Cato Ridge Electrical) [Construction Site- Supervisor ] 2017 – August 2017- November 2017

Supervision & installation of all steel works- Cable Racking, Angle Iron runners. MTO,s

2017 (Hosaf Fibres) [Construction Supervisor ] June 2017 – August 2017 Oversee crews to perform instrument installation works for scoped work 2017 (Sapref Turnaround) [Construction Supervisor ] February 2017 – May 2017

Oversee crews to perform instrument installation works. Glanding and termination of paired wiring, MV cabling . Scoping for shutdown 2016 PULIDA SOLAR FARM (JACOBSDAL) GROUP FIVE PROJETS

[Construction Supervisor ] 30 November 2016 – December 2016 Oversee teams installing Cable labels in the Invertor Cabins and Sub-Fields. Installation of all backing plates to suite Fibre Panels. Field inspections with Client Enertronica and sign off data packs

I N S T R O F O R C E

2016 FUEL 3 VOPAK REFINERY (Durban/Island View) [Construction Supervisor] 23 June 2016 – July 2016

Planning, design & installation of all cable support systems for HV/MV/LV cables. Scoping of all Instrumentation take offs. Plan, fabricate instrument stands and Pax Scan isolation boxes. Install impulse tubing as per hook up & P&ID. RFQ all construction installation under my scope, work hand in hand with QC Department to rectify and sign off data packs.

O U T S O U R C E E L E C T R I C A L E N G I N E E R I N G S E R V I C E S

2016 Total IVT (Durban) [Sub-Contractor] March 2016 – May 2016 Rendering of services to Outsource Electrical with all cable racking installation works

D A V I D S W A R T Z E N G I N E E R I N G S E R V I C E S 2015 ENGEN REFINERY (Durban) [Construction Planner/ Superintendent ] 15 June 2015 – Feb 2016

Planning of off-site works, creating construction schedule for scoped works. Interviewing of workforce for scoped tank work. Assist API 653 inspectors with blast & prime of floor plates and client inspections. Assistance to the Procurement department for outsourcing suppliers. Site supervision of annular plates to shell tank. Worked on Tender Bid for Super Heater and Condensate Tanks tenders at Kusile Power Plant.

G R O U P F I V E P R O J E C T S

2013 TM1 NMPP Project (Durban) [Boilermaker/Instrument Supervisor

] 02 Feb013 – June - 2015

Plan & Coordinate all cable racking and trunking steel works for TM1 Project E.g. Cable Basement MV Switchgear, VSD & Generators. Do all steelwork MTOs for racking, accessories & assisting in Instrumentation take offs and MTOs. Do drawings for requisition of all steel works to be fabricated in workshop. Oversee installation of PLC Panels into PLC rooms, MV Switchgear and provide structural supports for panels. Redline drawings for engineers approvable in the event of changes and technical queries. Provide support to x 5 Foreman and crew of 54 work personnel. Plan Toolbox talks for daily safety meetings.

W A D E W A L K E R E L E C T R I C A L E N G I N E E R S & C O N S T R U C T O R S

2012 Akyem Gold Mine Project (Ghana) [Instrument Supervisor ] July2012

– January 2012

Cable Rack building & installation. Locating & installation of instrumentation on conveyors (egg. Belt tensions, speed switches, weights) cables to conveyors. Cable installation (1pr, multi pair etc.) gland & terminate to transmitters & valves & panel wiring. Risk assessments and organising permit for safe working procedures

E N E R G O T E C

Sasol Wax Pas Migration Project: (South Africa) [Instrument Supervisor] 01 November 2011 – April) 2012

Scoping of work on Turnaround before shut date commence. Supervision of scoped work to install, gland termination of multi pair/core cables to the new DCS equipment rooms. Install Temperature Transmitters (Thermo Couples) & installation of new cabling. Locating of instruments, Liaising with engineers, operations & my superiors on isolation & demolition & re-installation of instrumentation. Hook-ups done to client procedures. Locating & design loop Installation of PRTX, PDT, Level Transmitters & Control valves. Oversee S/steel instrument piping installations to Solenoids & Control valves. Supervise steel work e.g. Cable racks/trays, Junction box frames, stop start channel brackets. Install angle iron droppers

K E N T Z E N G I N E E R S & C O N S T R U C T O R S 2011 Moatize Open Pit Coal Mine Project: Mozambique [Instrument Supervisor ] 10 Aug 2011 – Sep 2011

Locating & installation of instrumentation on conveyors (egg. Belt tensions, speed switches, weights) Hook-ups done to client procedures. Oversee Junction Box installations & ASI cables to conveyors. S/steel instrument piping installations to Solenoids & Control valves.

W I S E D E S I G N C C

2010 Amatory Nickel/Cobalt Project: Madagascar [Instrument Supervisor ] 10 Dec 2010 – 6 March 2011

Scoping of work on Turnaround before shut date commence. Locating of instruments, Liaising with engineers, operations & my superiors on isolation & demolition & re-installation of instrumentation. Hook-ups done to client procedures. Locating & design loop Installation of PRTX, PDT, Level Transmitters & Control valves. Oversee S/steel instrument piping installations to Solenoids & Control valves. Supervise steel work e.g. Cable racks/trays, Junction box frames, stop start channel brackets. Install angle iron dropper 2010 Engel Refinery Turnaround Project: Kentz (ENGEN) Oct 2010 – Nov 2010

Solenoid Valve, Piping installation & Pneumatics to scoped shut-down work. B & W ELECTRICAL & INSTRUMENTATION (INSTR/QA/QC)

2010 Ambatovy Nickel/Cobalt Project : Madagascar-2010 May – July 2010

Inspection of all instrumentation e.g. HV-on/off valves, Level indicator Transmitters, Flow TX, PDT Tx. Continuity test/point to point. Inspection of all instrument wiring at PLC & Remote panels. Sign off all work done to client specs TEKON ENGINEERING [INSTRUMENT SUPERVISOR – PETRO

CHEMICAL]

2009 Sapref Turnaround Project: Durban Sep 2009 – Nov 2009 Scoping of work on Turnaround before shut date commence. Supervision of Instrumentation for projects E25, E38, D60 projects. Locating of instruments, Liaising with engineers, operations & my superiors on isolation & demolition & re-installation of instrumentation. Hook-ups done to client procedures. Installation of PRTX, PDT, Level Transmitters & Control valves. Oversee S/steel instrument piping installations to Solenoids & Control valves. Supervise steel work e.g. Cable racks/trays, Junction box frames, stop start channel brackets. Install angle iron droppers, pull cables, install & terminate cables from field to PLCs. Work close with QC/QA department

KENTZ PTY (LTD) [SUPERVISOR]

HOSAF Fibres CP50 Project: Durban NOV 2009 – MAY 2010 Installation of cable trays for electrical & instrument cabling. Oversee instrument piping to valves. Demolition of scoped work for shut down. MONDI SHANDUKA [VENDOR]

Swing Refiners Project: Durban March 2007 – MAY 2008 Wire Press Panel(RFP)- (E & I projects & day works) Supervise installation of single pair, control & multi core cables to swing refiner projects 2 & 4. Installation of 10mm s/steel & hydraulic tubing to Wire Press Panel (RFP) Glanding & terminations of power cables to pumps, motors, lights, junction boxes, stop starts etc... Installation of conduits, angle droppers

&fabrication of mitred bends & off-sets.

MONDI BUSINESS PAPER [VENDOR]

PDS Conveyor Project: Durban March 2007 – Aug 2008 Various small projects(MEIP)day works

Site Supervision of mechanical, piping, instrument equipment. Oversee fabrication work to site installations, quality and production. Sign off Loop packs

TOYOTA NEW PAINT SHOP: [SUB CONTRACTOR] Durban Mar 2006

– Nov 2006

Site Supervision of all steel works for power & control cables. Install junction box stands & boxes. Installation of Control Panels. OTHER ACTIVITIES: (Vendor/Director)

Structural Steel Projects for GTS Multi Fuel Boiler Project- Mondi Paper

Mechanical & Piping projects for Multi Fuel Boiler Project- Mondi Paper

Electrical & Instrumentation projects for Multi-Fuel Project- Various

Impulse Tubing Change Over- Wire Press Panel- Mondi Shanduka R E F E R E E S

Wade Walker/Murray & Roberts

[HR **********@**********.**.**

Telephone: +27-11-456-****

Owen Mkhawanazi Mondi Group ( now Project Manager Transnet)

[Mechanical Engineer]

Telephone: +27-31-451-**** /083-***-****

David Swartz

[Projects Director]

M

M DSES( David Swartz Engineering Services

Telephone: +27 4666 227

Jeff Naidoo

[Engineering Manager]

Tekon Engineering

Telephone: +27-31-902-****/ 083-***-****)

Shepard Chiripanyanga

[Construction Manager]

Engineering Process Control & Engineering( Instroforce ) Telephone: +27-31-466*-****/ +27-76-526-****)

Raj Inderman

[Instrument Superintendent]

Mondi Shanduka

Telephone: +27-31-451-****/ 083-****-***)

Anton Van den Berg

[Director]

Outsource Electrical & Instrumentation

Telephone: +27-31-914-**** / +27-82-888-****)

Mathew Pillay

[Instrument Superintendent]-now director of Locani Instrumentation

Kentz

Telephone: +27-83-530-****/ 73 786 5300



Contact this candidate