Dhansur Khara Project Engineer

E-Mail: ac5av8@r.postjobfree.com ; ac5av8@r.postjobfree.com

Contact: +91-958*******

Seeking assignments in O & M, Project Engineering/Co-ordination with an organisation of high repute

Professional Preface

A dynamic professional with 8.4 years of experience in O & M of 220kv, 132/33 KV,66/11 KV Transmission and Distribution substation (GETCO), O & M of jetty,tank farm & VGO commissioning (ESSAR Oil), O & M and Shutdown of Crude, MTF, VGO and Coker plant (RELIANCE Refinery) and Erection & Commissioning and Project Coordination/Engineering in solar power plant (BHEL).

Currently Working With Bharat Oman Refineries Limited (BORL) Bina, Madhya Pradesh, Refinery Capacity Enhancement Project for the Post of Project Engineer (Electrical and Instrumentation).

Skilled in O & M, project management, reviewing project schedule; co-ordinating with vendors, customer and other agencies to achieve targets. Reviewing Electrical and SLD drawings and suggesting suitable modifications. Analyzing the feasibility of cables and instruments as per the specifications and parameters, carrying out the calculations.

Conversant with Electrical Panels like MCC, PCC, 33Kv,11KV,and 6.6KV HT Switch Board, AC-DC DB, Chargers, Batteries, Motors, Transformers, Bus duct, UPS, PLCs, Cabling, Plant Lighting, and Solar plant O&M. And effective communicator with excellent relationship management skills, problem solving & organisational abilities.

Academic Qualification

Post Diploma Course in Thermal Power Plant (NPTI)

NPTI, Badarpur, New Delhi in Sep-2016 to Sep-2017

Diploma in Electrical Engineering

Government Polytechnic College, Rajkot in 2008. Secured 59.67 % marks.

HSC (P.C.M.)

GSEB, National High School Jamnagar in 2006. Secured 52.50 % marks.

SSC

GSEB, Vinay Mandir Vrundavan, Sabarkantha in 2002. Secured 73.43 % marks.

Proficiency Forte

O & M/ Project Coordination/Engineering

Managing activities related with working out various requirements & monitoring overall project operations for ensuring timely completion.

Coordinating in the project activities and drawing specifications with the clients to ensure drawings are per the specifications of clients.

Defining the technical architecture; resolving the technical issues.

Coordinating with vendor services related to technology selection and implementation.

Conducting project meetings and addressing all the important issues.

Defining best practices for project support and documentation.

Employment Scan

Project : Gujarat Energy Transmission corporation- Lamba. (Wind Farm)

Periods : From Dec 2008 to Oct 2009.

Package : SIMMS ENGG. PVT LTD was doing O & M of 66/11 KV and 11/33 KV substation maintenance.

Project : Gujarat Energy Transmission corporation- Lambida.

Periods : From Nov 2009 to Oct 2010.

Package : A.B.B. PVT.LTD was doing O & M of 132/66 KV and 66/ 11 KV substation maintenance.

Project : Essar oil Ltd., Jamnagar. (JETTY, MTF and VGO Commissions)

Periods : From Nov 2010 to Oct 2011.

Package : Balaji Industrial Services was doing O & M of tank farm, jetty & VGO commissioning.

Project : Reliance Industries Ltd, Jamnagar. (CRUDE, VGO, COKER, MTF Plant)

Periods : From Nov 2011 to Apr 2014.

Package : Parikh agencies and Sinclus Engineering Consulting was doing O & M and shut down activity.

Project : Bharat Heavy Electricals Ltd (Banglore)

Periods : From April 2014 to September 2016.

Package : BHEL is executing the turnkey package. Daman-Diu & Kadri Solar Power Project.

(1MWp, 3MWp and 50MWp)

Project : Vedanta Ltd, Radhanpur Gujarat. (Crude Oil Terminal)

Periods : From Oct 2017 to Jan 2018.

Package : Aarvi Encon Pvt Ltd is doing O&M activity.

Project : Bharat Oman Refineries Limited (Bina, MP)

Periods : From Feb 2018 to Till Date.

Package : Aarvi Encon Pvt Ltd Provided Project Engineer to BORL for Refinery Expansion Project.

Work Profile :

In my assignment with Reliance Industries Limited, Essar Oil, Bharat Oman Refinery Limited, Cairn India Limited, Bharat Heavy Electricals Limited and Gujarat Energy Transmission Corporation; I acquired the experience of installation, Testing, Commissioning, Operation & Maintenance, Preventive Maintenance and Corrective Maintenance, Shutdown of Following Electrical Equipment’s.

Transformer:

(Make-VOLTAMP, BHEL, ABB, Kanohar Electricals Limited)

Testing, Commissioning, Operation and Maintenance of

Power Transformer rating up to 31.5 MVA, Dyn11, 33kv/6.6kv and

Distribution Transformer up to 2 MVA, Dyn11, 6.6kv/415 volts

HT Switch Board:

Siemens, AREVA, ABB and JYOTI make HT switch board of rating 3150 Amp, 6.6kv, having

SCADA protection scheme using Siemens SIPROTEC Series-3 microprocessor based relays operated

Auto changeover scheme.

Testing of auto change over scheme for HT switchboard and co-ordination with upstream auto

Change over scheme.

Relay setting of microprocessor base Numerical relays of ABB make REM 615 and REF 615,

Siemens make 7SJ64 (PCC incomer, O/C, E/F and U/V), 7UT61 (Transformer Differential

Protection), 7SD61 (Cable Differential protection), 7SJ61 (Motor protection)

LT Switch Board:

ABB, L&T and UNILEC, and CONTROL & SWICHGEER make LT switch board for PCC, MCC, and PMCC

Protection provided by Numerical Microprocessor based digital Siemens SIPROTEC series and P&B make

MREF relays.

Testing and Commissioning of auto change over scheme for PCC.

Siemens 7SJ64 relay for PCC incomer feeder protection and auto change over scheme, MREF relay

For Distribution transformer restricted earth fault, Siemens 7SJ61 relay for MCC incomer feeder

Protection, ABB REM 615 relay, ELR relay and Siemens 3RB12 relay for LT motor protection and

Start/stop logic scheme.

Breaker:

(Make- Siemens, ABB, AREVA, JYOTI, L&T, Schneider Electric, Merlin Gerin)

Testing and maintenance of Vacuum Circuit Breakers ( Rating up to 3000 Amp) and Air Circuit Breakers, (Rating up to 3200 Amps) and their trouble shooting.

Motor:

HT Motor: Testing, Commissioning, and Maintenance from to 3000 kW of Siemens, BHEL, Kirloskar, BBL,

LT Motors: Testing, Commissioning, and Maintenance from 0.37 to 150 KW.

L&T provided TELVENT make Substation Automation System: (Basic Knowledge)

Switch board of all are having communication system through serial link RS485.Eatch feeder of 6.6kv and 415 volt communicates with DCS system through Data Concentrator Panel. Internal communication and looping between feeders is using multimode fibre cable through RIO panel.

Battery Charger and Battery Bank :

Testing, preventive and breakdown maintenance of MASSTECH, HBL AMCO make 160 Amp.440vDC

Float Charger and Float Cum Boost Charger with Backup by 300 AH VRLA batteries.

Testing of battery by battery load test and discharge.

UPS:

Maintenance of HBL and HI REL make 40KVA UPS backup by 415 AH and 160 KVA UPS backup by 300 Ah VRLA battery.

DG SET:

Operation and Maintenance of 750 KVA and 1250 KVA Cummins make Emergency DG Set to emergency load during power failure.

Auto start up and auto power transfer in case of mains power failure.

HVAC:

Maintenance of HVAC system in substation to keep substation pressurized. And Emerson make PAC System for air conditioning inside substation.

Variable Speed Drive:

Maintenance of Hi-REL make 37kw, 22kw, 7.5kw and VACON make 75kw drives for speed control of fin fan based motors based on process parameters.

Installation, Testing and Commissioning of Variable Frequency Drives of ABB make 110 KW ACS 550

Cathodic Protection System:

Testing and Commissioning of cathodic protection system for Tank and Pipe Line throughout the complex including sacrificial anode cathodic system (SACP) and impressed current cathodic system (ICCP).

Thermal POWER PLANT: ( 2*210 MW NTPC Badrpur, Delhi)

3 Months on job Training completed in NTPC Power plant Delhi.

15 Days CCGT and TPS SIMULATOR Training taken in NPTI Faridabad.

Basic Knowledge of Thermal Power Plant Layout, Boiler, Turbine, Generator, CHP, DM Plant, Condenser, 220kv Switchyard, BFP, CEP,FD Fan, ID Fan, ESP and other equipment.

Solar Power Plant up to 50 MWp erection, Testing, Commissioning, operation & maintenance. Prepare Monthly Generation and MIS report

Commissioning and maintenance of 30 Meter HIGH Mast, Strit Light and Plant lighting maintenance.

Operation & maintenance of 11Kv, 66kv and 132kv switchyard, 33kv, 11kv, 6.6Kv, 0.415Kv switchboard.

Cable laying, glanding, termination and cable fault finding .

Isolation and Restoration of electrical equipment.

Coordinating activities with Section Heads for various jobs.

Compliance for the punch point and other important documentations needed for electrical inspector audit before charging the substation.

Maintenance of Electric Heat Tracing PDB, LDB, ELCB, Earth pit.

Best practice for LOTO, SOP, SMP, and Work Permit.

I T Skills

Basic knowledge of computer.

Other Accolades

Maintained a consistent touch with fellow power engineers at various other sites & companies and contributing in knowledge and data sharing within groups.

Personal Portfolio

Date of Birth: 17th Sep, 1986

Passport No. : K4859077 valid up to 29/05/2022

Current Address: Village- Sapda, Dist-Jamnagar, Post-Pasayaberaja, Pin-361110, Gujarat -India

Permanent Address: Village- Sapda, Dist-Jamnagar, Post-Pasayaberaja, Pin-361110, Gujarat -India

Linguistic Abilities: English, Gujarati and Hindi