PERSONAL DETAILS:
DWAYNE VAN DER MERWE
ID: 841********** & VALID PASSPORT
SINGLE WITH 1 DEPENDANT
CONTACT: +27-084-***-****)
EMAIL: ************@*****.***
RES: RIGEWAY, JOHANNESBURG
VALID CODE 8 DRIVERS LICENCE
EDUCATION:
12/2002 MATRIC CERTIFICATE
HIGH SCHOOL/GRADE 12 (MATRIC) AT PRESIDENT HIGH.
SUBJECTS: AFRIKAANS ENGLISH MATH’S SCIENCE WOODWORK TECHNICAL DRAWINGS AND TECHNICAL MECHANICS
INTRODUCTION
I am a 33 year old South African male. I have been working in earthworks and layerworks (civils) for most of my life.
As a Senior Foreman I have done road rehabilitation, drainage, construction of new roads, construction of railway lines, dams and canals for the irrigation of sugar cane plantations, residential roads as well as residential homes.
Some of my jobs include multi billion rand projects which included the Gautrain Project in South Africa, the Gauteng Freeway Improvement Project (TolCon), Ncala Rail in Mozambique (Tete), Sugar Plantation and Irrigation (Sierra Leone) and smaller road construction projects in South Africa. King Shaka Airport In Natal.
I pride myself in the fact that all my jobs were concluded within the contract period allowing for little or no penalties having to be paid by the Company.
I complete a project from start to finish, bulk earthworks (blasting), including cut and fill and then doing all selected layers to completion and surfacing. My layer-works include stabilization. Asphalt includes all different types and sizes and different types of bitumen. I can read plans. I can work out quantities of cement required as well as the spacing thereof. I can lay storm water pipes; do side-drains, sub soil drains, culverts, head-walls, wing-walls, cable ducts, curbs, channels and gabions.
My last job included earth and layer-works in Bergendal Estate
I am a hard working hands-on individual (not afraid to get dirty) with sober habits who works well with my team mates.
Regards
Dwayne van der Merwe
COMPANY & PROJECT
DUTIES AND RESPONSIBILITIES
NMC CIVILS: 01/06/2017 – 31/01/2018
BERGENDAL ESTATE – EARTH AND LAYER-WORKS
COMPANY LIQUIDATED
REF: BRAAM STORM (083-***-****) (PROJECT MANAGER)
SENIOR FOREMAN
Bulk earth works, layer works, trimming, gabions and culverts, rip rap at bridges. Blasting
Surfacing 19mm cape seal (chip and spray)
Daily site task instructions
In charge of all plant (internal and external) in charge of all sub-contractors (hiring, etc.)
Ensure all teams are clear on required outputs
Ensure all required human resource policies and procedures are clearly understood by all site staff
Correctly communicate requirements to subordinates
Ensure compliance with cost and time requirements of the work program
Formalize daily meetings with team
Plan all materials needed and their usage
Oversee the care of all site assets and consumables, Plant and Equipment
Monitor waste control
Build a safety culture on site
Plan and control material and commodity supplies
Supervising and management of all sub-contractors
GRINAKER AVENG
01/07/2013-31/05/2017
R61 NEW ROAD
LEFT FOR BETTER CAREER PROSPECTS
REF: THEO JONCK 079-***-**** (SNR PROJECT MANAGER)
SENIOR FOREMAN – EARTHWORKS
Umtata R61 New Road (All Saints) (22kms)
St Marks Rd from R61 to Chris Hani Memorial Centre (18km)
Kusile Power Station (bases and plinths)
Nacala Railway Mozambique (60km)
Bulk earth and layer-works
Stormwater and drainage
In charge of all sub-contractors and hired plant
Make sure all material required is ordered and on site
Ensure all teams are clear on required outputs
Ensure all required human resource policies and procedures are clearly understood by all site staff
Correctly communicate requirements to subordinates
Ensure compliance with cost and time requirements of the work program
Formalize daily meetings with team
Plan all materials needed and their usage
Oversee the care of all site assets and consumables, Plant and Equipment
Monitor waste control
Build a safety culture on site
ADDAX BIO-ENERGY
01/04/2011 -30/06/2013
SUGAR ESTATE
CONTRACT FOR AN OVERSEAS COMPANY
REF: STEVE COSTER (*****.******@*******.*** (PROJECT MANAGER)
SENIOR FOREMAN
Construction of dams and canals for irrigation and roads
GROUP FIVE
02/2009 - 3/2011
NEW MULTI PRODUCT PIPELINE FROM JHB TO DBN
SENIOR FOREMN - EARTHWORKS
Bulk earth works
Layer- works of road-crossings
Constructing of valve chambers
King Shaka Airport – layer-works of parking areas and access roads
Nasrec road widening and N17 link from Nasrec road to Orlando stadium – layer-works
BOMBELA CJV
01/2007 – 12/2008
GAUTRAIN FROM ALLANDALE TO JOHN VOSTER
REF: DION HAASBROEK (GENERAL FOREMAN)
SENIOR FOREMAN
Bulk earth and layer-works
Drainage
MOTHEO CONSTRUCTION
01/2003 – 12/2006
BUILDING OF LOW COST HOUSING
REF: KOBUS (079-***-****)
JUNIOR FOREMAN
Earthworks and layer-works and foundations for low cost housing
Finishing foreman