Post Job Free
Sign in

Engineer Engineering

Location:
Patna, Bihar, India
Salary:
Negotiable
Posted:
July 14, 2018

Contact this candidate

Resume:

RESUME

SHAKEEL AHMAD

Mechanical Piping Engineer

Mobile # +91-709*******

Skype ID : shakeel ahmad

Email ***********@*****.**.**

.

OBJECTIVE

Being a MECHANICAL ENGINEER want to work as PIPING SITE ENGINEER in a reputed Organization.

EDUCATION

DIPLOMA IN MECHANICAL ENGINEERING from state Board of Technical Education and

Training, Bihar India

COMPUTER KNOWLEDGE

Windows 98 /XP_ Microsoft Word, Microsoft Excel, & Microsoft Power Point

SUMMARY OF EXPERIENCE - Total: 16 Years

PROFESSIONAL ORGANIZATION:

1. .Saudi Aramco (LUBEREF)Project Yanbu KSA. _ from 17/08/ 2014 to 31/01/2017 (PMT)

2. Saudi Aramco (YASREF)Project Yanbu KSA. _ from 03/ 05/2014 to 17/08/2014 (PMT)

3. Daewoo Engineering & Contracting UAE. _ from 14 / 02 /2012 07/07/2013 (EPC)

4. Daewoo Engineering & Contracting QATAR _ from 15 / 09 /2011 15/01/2012 (EPC)

5. SK Engineering & contracting KSA from 16/12/2010 to 31/07/2011 (EPC)

6. Lahoud Engineering Co. UAE _ from 23/08/2006 to 18/11/2009

7. Lahoud Engineering Co. Doha Qatar _ from 20/08/2005 to 05/06/2006

8. AL- Jaber Grinaker – LTA (ALEC) UAE _ from 17/10/2004 to 05/04/2005

9. Saudi Bin Laden Group. PCM Saudi Arabia _ from 27/04/2004 to 27/09/2004

10. Med Gulf Construction Co. (WLL) Doha Qatar _ from 28/06/2001 to 09/09/2002 11.Doha Petroleum Construction Co. Doha Qatar _ from 20/08/1996 to 14/09/1999

Overall 16 years of experience as Site Piping Engineer / Supervisor, Piping Fabrication & Erection in Charge

Piping Site Engineer power, Oil Refinery, Gas, Petrochemicals, Steel, Polypropylene, and associated

Industries to complete the project to client`s specification, consist with schedule and contractual

Requirements and standards applying quality project management principle.

Well experience in Supervision of Piping Fabrication, Erection, Installation of above

Ground & under grounding piping and plant shut down jobs and hydro test activities

Able to handle fabrication shop individually, plan and execute piping fabrication

According to project schedule and maintain quality as per project requirement

Able to achieve planned target of fabrication within stipulated time and with minimal

Manpower.

Well conversant with International standards ASME, ASTM, API, ANSI.

Sound knowledge in Piping isometric drawings, Plant GAD and P&ID drawings

Readings,

Able to prepare piping as built isometric & Plant P&ID drawings

Good knowledge in shutdown piping activities

Very good knowledge in erection and welding of plant unit piping.

Very good working experience in permit system and safety procedures of refineries

And petrochemical plants.

Maintaining daily production log and welders/fabrications performance log

Thorough knowledge in all types of fabrication and materials fabricated are SS (304L,

316L, 321H, 347 etc.) CS, Low alloy steel (P11 & P22), LTCS and CU- Ni alloys.

Good knowledge in material specification of CS, SS, & LTCS pipes, fitting, valves etc.

EXPERIENCE DETAI LS

Site As built, Trace the plan, Material take off as per Isometric

Drawings and P&ID, Make FNC, RAWS Form,

Piping Engineering verification at site, prepare piping sit

Site as built Drawing, Site modification & Additional work, P&ID site checking

& Make as per site condition, Site Inspection with QC & Client.

RESPONSIBILITIES

Enforcing the implementation of the HSE rules.

Analysis of drawings and specifications against available work front.

Assistance to subcontractors for work preparation.

Assistance to scheduling department.

Provide technical expertise to site and project management.

Monitoring the quality of the fabrication and erection work.

Monitoring the traceability of bulk materials.

Checking the progress of the works as reported by subcontractors.

Reporting to the construction manager any problems impacting the erection

Works such as lack of resources, drawings materials.

Solving technical queries raised by subcontractors.

In the workshop, expediting fabrication as per the priorities requested by the field.

Coordination of field activities with other trades.

Conformity checking before hydro testing.

Expedite punch list clearing and completion of the works.

Material Take off as per isometric drawing.

Making spools drawing as per requirements.

Shop Fabrication of spools, Welding, NDT clearance, and Hydro Testing activities.

Spool Clearance and mobilizing spools to proposed erection sites.

Erection of piping, field joint & Tie-ins, and installation of supports

System Hydro test

activities

And Pre-Commissioning activities

PROJECT WORK

Company SARACO

Client Luberef Yanbu Refinery Expansion Project.

Saudi Aramco Yanbu. SAUDI ARABIA

Position Project Engineer. Piping

Period 17/ 08 / 2014 to 31/01/2017

Company SARACO

Client Yanbu Aramco Sinopec Refining (YASREF) Company LTD.

Crude Package EPC – 2 SAUDI ARABIA

Position Project Engineer. Piping

Period 03 / 05/ 2014 to 17/08/2014

Company Daewoo Engineering & Contractor (EPC)

Client Nakilat ship repair yard project, Southern Breakwater Rash Laffan Doha Qatar

Position Piping Engineer

Period 14 / 02 /2012 07/07/2013 (EPC)

Company Daewoo Engineering & Contractor (EPC)

Client SAPCO. Shuweihat. IPP – S3 Project. UAE.

Position Piping Engineer.

Period 14 / 02 2012 to 07/07/2013

Company SK engineering & contractor (EPC)

Client Saudi Aramco Total Refinery & Petrochemical company (SATORP) Saudi Arabia

Position Piping Supervisor.

Period 16/12/2010 to 31/07/2011

Company Lahoud Engineering co.

Project OGD – 3 Habshan Abu Dhabi UAE.

Position Piping supervisor

Client BECHTEL

Period from 24/08/2006 to 18/11/2009

Company Lahoud Engineering co.

Project ORXY GTL Doha Qatar

Position Piping supervisor

Client M/S. Technip Italy

Period 20/08/2005 to15/06/2006

Company AL-Jaber Grinaker - LTA

Project ULG/ LSGO Ruwais Abu Dhabi UAE.

Position Piping supervisor

Client Tehnipmont

Period 17/10/2004 to 05/04/2005

Company Saudi Bin Laden Group (PCM)

Project Yen pet & IBN Zahrr Shutdown Saudi Arabia

Position Piping supervisor

Client Floor Arabia

Period 27/04/2004 to 27/09/2004

Company Med gulf Construction co.(EPC)

Project Oms aid To Dukhan Pipe Line Doha Qatar

Position Piping supervisor

Client Snamprogeti

Period 28/06/2001 to 09/09/2002

Company Doha Petroleum Construction co. LTD.

Position Piping Foremen

Client Qatar Petroleum Doha Qatar

Period 20/08/1996 to 14/09/1999

PERSONAL DETAILS

Age & Date of Birth : 47 & (15/03/1970)

Nationality : Indian

Marital Status : Married

Languages known : English, Hindi, Arabic, Urdu.

Permanent Address : Life Care Diagnostic center. Fattehpur by pass road

Siwan Bihar India.

Phone # +91-916*******

Email ***********@*****.**.**

Passport Details

Number : R 7647174

Date of Expiry : 08/0/2028

Place of Issue : PATNA

Joining Period : 01 Month

Present Salary : SR 12420

Expected Salary : Negotiable

I herewith submit Say that all the above Said information is true to the best of my knowledge.



Contact this candidate