ERNIE GLUBISH
Calgary AB
********@*****.***
HIGHLIGHT OF SKILLS
36+ years of Oil & Gas experience
25+ years Project Management experience
25+ years of experience working in Upstream and Onshore Oil/ Gas projects
25+ years of Mid-Stream pipeline experience
Diploma in Civil Engineering - NAIT 1980
Is experienced working with sour service, acid gas, water injection, thermal/ heavy oil production
WORK HISTORY
Pipeline Specialist 2016-2018 (Contract)
Caprock Engineering Calgary, AB
Project Manager/ Manager Pipeline Engineering 2003-2016 (Full-time)
Wood Group Mustang (Formerly IMV Projects) Calgary, AB
Project Engineering/ Pipeline Engineering 2001-2003 (Full-time)
Colt Engineering/Imperial Oil Alliance Calgary, AB
Pipeline Engineering 1997-2001(Full-time)
Colt Engineering/Imperial Oil Alliance Calgary, AB
Project Manager 1996-1997 (Contract)
Exact Oilfield Services Calgary, AB
Pipeline Project Designer/Coordinator 1980-1995 (Full-time)
Canadian Western Natural Gas Ltd. (Now ATCO Gas) Lethbridge, AB
PROJECT EXPERIENCE
Pipeline Lead - Detailed Engineering 2016
Husky Tucker Lake Colony Pad Flow Lines Cold Lake, AB
Responsible for the design of above ground thermal projects for Husky Tucker Lake Colony SAGD off sites. The project consisted of steam and emulsion lines up to and including NPS 20.
Pipeline Lead - Detailed Design 2015-2016
Devon, Pike 1 Project Fort McMurray, AB
Pike Commercial Project is a 100,000 bpd project. The pipeline scope included 10km of above ground steam and production lines (up to NPS 36). Project cost at $120MM.
Pipeline Lead - FEED 2014
Devon, Walleye Project Cold Lake, AB
Walleye Commercial Project is a 10,000 bpd project, Pipeline scope included above ground steam lines 1.5km in length (NPS 12) and 20km of buried pipelines (NPS 8).
Project Manager/Pipeline Lead 2011-2013
AltaGas, Henderson Pipeline Ante Creek, AB
Conceptual Design, FEED, and full EPCM for 22km of NPS 8/NPS6 sour gas pipeline to increase capacity at the AltaGas Ante Creek Plant.
Pipeline Lead 2009-2010
GASCO, United Arab Emirates Abu Dhabi, U.A.E.
Designed and procured all materials for a 24km, 30” buried pipeline (high pressure gas).The new pipeline was required to supply gas to a new aluminum plant on the shoreline of the Persian Gulf.
Pipeline Lead 2009- 2010
Athabasca Oil Sands Corporation, MacKay River Project Fort McMurray, AB
FEED for Stage 3 of the Fort Mackay River Commercial Project, a 150,000 bpd project developed in four phases. Pipeline scope involved 12km above ground gathering lines (up to 20 inches) and 56km of buried pipelines (up to 6 inches).
Project Manager/ Design Lead 2004-2008
Canadian Natural Resources Ltd., Primrose East Pad Pipelines Cold Lake, AB
Designed and managed the Primrose East Thermal Plant pipeline infrastructure for 10 new production pads.
Project Manager/ Design Lead 2004-2008
Canadian Natural Resources Ltd., Primrose East Interconnect Pipelines Cold Lake, AB
Designed and oversaw the construction of a 24 inch Boiler Feed Water Pipeline (31 km) and an NPS 24 buried emulsion pipeline (31km) between Wolf Lake and Primrose East Plants. The design temperature of the buried NPS 24 Boiler Feed Water pipeline was 105 degrees C and the emulsion pipeline was 150 degrees C. Both pipelines were designed for smart pigging.
Project Manager/ Design Lead 2004-2005
Canadian Natural Resources Ltd., Primrose North Pipelines Cold Lake, AB
Designed, managed, and oversaw the construction of various above ground thermal projects for CNRL. The projects consisted of numerous lines including steam and emulsion.
Project Manager/ Design Lead 2004-2005
Canadian Natural Resources Ltd., Primrose North Interconnects Cold Lake, AB
Designed and oversaw the construction of a buried 24 inch Boiler Feed Water 18km Pipeline and 8km of above grade pipelines (steam and emulsion) between Wolf Lake and Primrose North Thermal Plants.
Pipeline Lead 2008
Husky, Tucker Lake Cold Lake, AB
Designed the pipeline infrastructure between the central process facility, central field facility, and the production pads. Project consisted of numerous steam and emulsion lines up to and including 16 inches.
Pipeline Lead 2004-2009
Encana FCCL, Foster Creek Pipelines Cold Lake, AB
Responsible for the design of above ground thermal projects for Encana Foster Creek OffSites. Project consisted of numerous lines including steam and emulsion lines up to 16 inches.
Pipeline Lead 2004-2009
ConocoPhillips Canada Surmont 2 Field Facilities Fort McMurray, AB
Completed FEED studies for various above below and above ground thermal pipeline projects in northern Alberta.
Pipeline Design Lead 2001-2003
Imperial Oil Resources, Prism Pipeline Nanticoke, ONT
Designed and involved in the coordination of construction of a 65km, $40MM, 12” Prism Pipeline from Hamilton to the Nanticoke Refinery in Ontario. The pipeline was designed to transport Cat Naphtha and Raffinate to the Nanticoke Refinery.