QUALIFICATIONS:
BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING
ELECTRICAL EQUIPMENTS, MATERIALS AND INSTALLATION INSPECTOR INSTRUMENTS, MATERIALS AND INSTALLATION INSPECTOR
KNOWLEDGEABLE IN E & I PRE-COMMISSIONING AND COMMISSIONING ASNT UT Level II – Ultra sonic Testing of Weld Flaws ASNT (ASNT TC-1A), 2008
UT (Ultrasonic Testing of weld flaws) Level-ll
Certificate No. UT-ll-03
ARAMCO APPROVED ASSISTANT/BACK-UP PQCS (Procurement Quality Control Supervisor). TRAININGS & SEMINARS ATTENDED:
Switchgear (WESCOSA) and Transformer
Testing & Commissioning (RISAS)
Arc- Resistant Metal Clad Switchgear
Substation Transformer Testing
Power System Calculation
Cathodic Protection
16th Annual IIEE Chapter Convention
Le Merredien Hotel, Al-Khobar, Eastern Region, K.S.A., 25 November, 2011.
HSE
SATA (Safety Analysis + Task Assignment),
2001 Qatar
TRA (Task Risk Assessment and Toolbox Talk Record) by BP Golden Rule, 2004 Azerbaijan
Saving Trough Power Quality
Electro Flow
Al-Heilb Est. Electrical Engineering Division
DAMMAM KSA, 1996
Electrical Power Generation and Distribution
Calaca Thermal Power Plant
Macban Laguna Geothermal Power Plant,
January 1993
COMPUTER LITERATE:
Worked on PC applying Word Processor
Worksheet
Microsoft Word
Microsoft Excel & Others
SUMMARY OF EXPERIENCE:
More than 16 years of cumulative experienced and knowledgeable in various work position, roles and responsibilities such as a QA/QC Manager, Material Specialist, Procurement Engineer, Procurement Quality Control, Construction Progress Monitoring, Construction Work Supervision and Quality Control works in Civil, Mechanical, Telecommunication, Electrical and Instrumentation during Procurement Stage, construction phase and Pre-comm/Commissioning phase.
Work experienced in Oil & Gas Drilling Facilities, NGL Plant, Desalination Plant, Power Generation Plant, Petrochemical Plant.
Familiar in PIMS (Project Information Management System). Work experienced and knowledgeable with Saudi Aramco standards and references such as SCHEDULE Q, Saudi Aramco Non-Material Requirement (SA-NMR), Saudi Aramco Engineering Procedure (SAEP), Saudi Aramco Typical Inspection Plan (SATIP), Saudi Aramco Inspection Checklist (SAIC), Saudi Aramco Engineering Standards (SAES), SA FORM-175(Inspection Requirements) and etc. Work experienced and knowledgeable with Royal Commission standards such as RC-01450, other RC specifications other relevant references and documentation in working as QA/QC manager. Looking for Observation for Improvement & Recommendation to rectify issues and bottle-neck using PERFORMANCE IMPROVEMENT MODEL TO IDENTIFY AND SOLVE PROBLEMS AND PROCESSES “FOCUS-PDCA MODEL”.
AWARD:
Commitment and Dedication Recipient Awardee
“During Construction toward Quality and Safety”
(NGL-4 PROJECT TASK FORCE) NGL-4 Project
Dukhan, Qatar
EMPLOYMENT HISTORY:
Alkifah Contracting Company; Vendor ID: 10006281
October 9, 2017 to Present.
POSITION: Procurement Material Specialist / Procurement Engineer ARAMCO Approved Assistant / Back-Up PQCS (Procurement Quality Control Supervisor) Project: Jazan Economic City Port & Infrastructure (JECPI); BI: 25-00037-008 Arkad Engineering & Construction Company; Vendor ID: 10048984 May 9, 2017 to Oct, 2017.
POSITION: Procurement Quality Control / Procurement Quality Control Supervisor Project: Master Gas System Expansion-Pipe Lines Project; BI: 10-01810-003/004 RAM Dental Care Company
November 24, 2015 to December 25, 2016.
POSITION: Director for Maintenance and Logistic Support for Non-Medical Mofarreh Marzouq Al-Harbi & Partners Co. Ltd.
March 10, 2014 to Augost 31, 2015.
POSITION: QA/QC Manager
Ali Salman Abu Shaheen Trading and Contracting Est. October, 2009 to February, 2014
PROJECT DEPLOYMENT:
Azmeel Contracting (AZMEEL).
December 02, 2012 to 2013.
POSITION: Electrical/ Instrument QC Inspector; PQCS (Procurement QC Supervisor) Trainee.
INTEGRATED SERVICES TECHNOLOGY (IST Groups).
August 20, 2011 to August 23, 2012
POSITION: Inspection Coordinator/ Vendor Inspector
GSBI (Govoni Sim Bianca Impianti).
November 01, 2010 to July 31, 2011
POSITION: Electrical/ Instrument QC Engineer
Jubail Lines Company – Al-jubail, KSA.
February, 2010 to April, 2010
POSITION: Electrical Inspector
Eastern Pacific Inspection – MCECG Al-Khobar, KSA. September, 2008 to September, 2009
POSITION: Electrical / Instrument Inspector
ASNT UT Level-ll Technician
Technilink/ J.Ray McDermott, Azerbaijan.
March 05, 2003 to April 30, 2005
Bp/ AIOC Project in Baku,AZERBAIJAN
POSITION: E/I Mechanical Completion Engineer
KassemDarwishFahkro& Sons, Qatar.
May 23, 2000 to May 23, 2002
POSITION: Instrument Foreman
Nozom International Est. Al-Khobar, KSA.
November 24, 1995 to December 4, 1999
PROJECTS DEPLOYMENT:
Hitachi Zosen Corporation Al-Khobar, KSA.
January 01, 1997 to December 02, 1999
AK -3 Desalination Project KSA
POSITION: Instrument Supervisor
Hanco Maintenance Division Dammam, KSA.
October, 1996 to December, 1996
POSITION: Service Engineer
Mitsubishi Kakoki Kaisa, Al-Jubail, KSA.
June 01, 1996 to September 30, 1996
SAMAD DOP Project
POSITION: Instrument Supervisor
Honeywell Al- Turki Arabia Ltd. Al-Jubail, KSA.
November, 1995 to May, 1996
Up-grading of VCM PetroKemya Control System
POSITION: DCS Instrument Technician
Equipment Engineering Incorporation, Phil.
September 22, 1994 to January 13, 1995
POSITION: Junior Quality Control Engineer
DUTIES AND RESPONSIBILITIES:
PROCUREMENT MATERIAL SPECIALIST / PROCUREMENT ENGINEER AL-Kifah Contracting Company; Vendor ID: 10006281
Projects:
Jazan Economic City Port & Infrastructure (JECPI); BI: 25-000**-****
Material Purchase Requisition Approval / MR package preparation for materials with LOI/Level of Inspection: Zero (0) to four (4).
Material Technical Requisition Approval / MTR package preparation for material with LOI/Level of Inspection: Non-Inspectable (NI).
Coordination thru Technical Department Engineers to Discipline Design Engineer for technical documentations, technical clarification/issues of relevant documents required in the preparations of MR, MTR and TBE Package.
TBE (Technical BID Evaluation) package preparation, initial review and required coordination work.
Enquiry, Request for Quotation (RFQ), Purchase Order (PO) preparation issuance and required coordination job thru telephone and email communications.
Preparation of Internal Price Comparison.
Preparation of Award Recommendation (AR) or Order Placement Recommendation (OPR).
Preparation of Saudi – Non Saudi Manufacturer Equalization, Aramco Submittal as per Schedule G SA PMT requirements.
Proposed and approved Assistant/Back-Up “PROCUREMENT QUALITY CONTROL SUPERVISOR”. PROCUREMENT QUALITY CONTROL / PROCUREMENT QUALITY CONTROL SUPERVISOR Arkad Engineering & Construction Company; Vendor ID: 10048984 Projects:
Master Gas System Expansion-Phase ll; BI: 10-01810-003
Inspection Assignment Package preparation.
Manufacturer ITP reviews.
Order Placement Recommendation review.
Inspection Disposition Report package preparation.
To do internal inspection and proper documentation required for Material Receiving, Storage, Handling & Preservation as QC Material Coordinator for compliance to approved PDQP (Procurement Department Quality Plan).
QA/QC MANAGER
Mofarreh Marzouq Al-Harbi & Partners Co. Ltd.
Projects:
181-C01 (Site Development Area B- Stage-1)
Report directly to the Project Manager and has interface with the Project Manager for coordination.
Develop, do the coordination to Royal Commission QA/QC Manager for the approval of Quality Control Plan and other quality assurance documents as per the requirement of RC specifications.
Conducting and making report of the PIM (Pre-Installation Meeting) prior for installation activity.
To do the comprehensive submittals review prior to submission to Royal Commission of the following documents, such as Material Technical Submittals, Method Statement and etc.
To ensure that the inspection requirements are implemented and maintain.
To monitor the weekly and Monthly Quality system required deliverables and to ensure that all submittals and quality requirements are addressed.
To ensure that QC inspectors follow the Inspection and Test Plans and the request for inspection are raised as per the required intervention points.
To ensure a comprehensive filing system is maintained and compile all quality documentations up until mechanical completion.
To establish the requirements of Material Technical Submittal comparison sheet, Sub- Contractor/Supplier company pre-qualification requirements and Material Technical documentation to be attached.
PROCUREMENT PERSONNEL / ELECTRICAL AND INSTRUMENTATION INSPECTOR AZMEEL CONTRACTING
Projects:
WASEA BULK PLANT PROJECT (ASL CRUDE OIL AND FIRE STATION); BI: 10-00795 Assigned and work in procurement department to undergo for comprehensive training for PQS (Procurement Quality Supervisor) in company preparation for incoming project. PQS (Procurement Quality Supervisor) Trainee
To familiarize and study all relevant works/ activities, documentations in the procurement process.
To monitor and familiarized for Procurement Quality issues, problem and solutions.
Monitoring and Tracking of MTA/PR for approval process.
Assigning and Verification of Saudi Aramco 9COM number, Inspection level requirement and relevant applicable Aramco standards/references at material’s MR preparation.
Coordination to SA PMT Material Specialist for materials SAP Screenshot and proposed 9Com verification to up-dated registered vendor list of materials for limitation and etc.
Inspection Assignment Package (IAP) preparation, coordination, monitoring and tracking of the IAP required documents to attach, such as Approved PR, Approved NMR, Un-Price Purchase Order and Sub P.O’s. and etc.
Preparation of References/Standards as per recommendation of SA FORM-175(Inspection Requirements) as required attachment of the IAP package.
Reviewing of Purchase Order as per MTA/PR, approved Order Placement Recommendation (OPR) and Schedule-Q requirements.
IDR (Inspection Disposition Report) Package preparation.
Updating and preparation of PQCS Two Weeks Look Ahead Report.
Updating Procurement Material Summary Status list as per PQCS instruction and practice.
Attending weekly procurement meeting of SAPMT in WASEA. Procurement Material Engineer
Preparation of MTA (Material Technical Approval) Package submittal for non-inspectable and level zero materials as per material 9COM list, Aramco Material Classification, SAP and etc.
Preparation of PR (Purchase Requisition Approval) Package Submittal for level one up-to level four inspectable materials as per SAIR-1972, Inspection Requirements, 9COM list, Aramco Material Classification, SAP, and etc.
Preparation of Main Manufacturer Sub-Vendor of Bought-Out items “Action Plan/Quality requirements” tabulation as per instruction by PQCS for all PR with more than one inspectable 9Com or base from NMR-601 Material List.
NMR and SPDP Coordinator
To coordinate and compared the NMR (Non-Material Requirements) submitted by vendor to the NMR form requirements to ensure the completeness of submitted NMR.
To prepare and submit the CPR (Contractor Procurement Report) updates to ARAMCO PMT every month.
To prepare and to submit the Capital and Equipment List up-dates report to ARAMCO PMT after placing of PO’s.
Coordination works or package preparation and submittal to ARAMCO for SPDP (Spare Parts Data Package) and Start-up Spare Parts.
INSPECTION COORDINATOR & INSPECTOR
INTEGRATED SERVICES TECHNOLOGY (IST Groups)
THIRD PARTY INSPECTOR
Projects:
Saudi Cable Company (SCC Jeddah, P.O No: 450*******) SS2406 / Ma’aden Aluminum Rolling Mill Project.
Saudi Electric Industries Company Ltd. (SEICO Jeddah, P.O No: 4500086768-1) SS2406 / Ma’aden Aluminum Rolling Mill Project.
Al-Qahtani Pipe Coating Industries Site 1 and 2, Dammam. P.O-WA-3603 R1 and WA-3604 R3
Jet Fuel Hydrant at New Dakar Airport Senegal.
THIRD PARTY INSPECTOR / COORDINATOR
Working as Inspection Coordinator/ Vendor Inspector for Integrated Services Technology Company, doing Inspection and report documentations, documents review, expediting report submittal for inside and outside kingdom projects and other work related correspondences in various Non-ARAMCO and ARAMCO Vendor inspections.
Attending pre-inspection meetings (PIM), in process inspection, final inspection and raises found technical issues, NCR if, during manufacturing process inspection stages and surveillance visit inspection.
Reviews of inspection relevant documents such as manufacturing process inspection reports, Material Test Certificates (MTC’s), Internal Release Note, Delivery Note, Certificate of Compliance (COC), Calibration Certificates, Drawings and etc.
Conducting inspection as per notification and relevant reference such as Purchase Order, SAMSS, SAES, Industry Standards reference as per recommendation of SA Form-175, Vendor approved documents such (ITP) Inspection Test Plan, Procedures, Drawings and etc.
Making and preparation of Inspection Release Certificate (IRC) and Inspection report (IR). ELECTRICAL & INSTRUMENTATION QA/QC ENGINEER
Company: GovoniSim Bianca Impianti
Project: PP/OSBL 400 KT/Y EXPANSION (NATPET)
Attending/witnessing inspection, documentation and documents review during all Electrical & Instrumentation materials/equipment receiving, installation, pre-comm/commissioning works activities.
Technical assistance and review of some required documentations such as Quality records, check lists, Test packages, work procedures, JSA(Job Safety Analysis), recovery plan, Hand over Dossier and etc. of the sub-contractor.
Creating system execution, documentations and philosophy that takes the step of work that must be completed in chronological order and describes the involved work and responsibility in the process chart (Completion/Commissioning process flow).
Receiving and raising of Sub-contractor RFI (request for inspection) to NATPET.
Attending weekly meeting with the sub-contractors every Thursday, and Saturday NATPET contractor meeting.
Progress monitoring and quality control for Electrical works such as grounding system, lighting system, low voltage and medium voltage systems and other related inspection and testing which are parts of the system under scope of works.
Progress monitoring and quality control for Instruments works such as Instrument cabling, instrument installation, Actuated valve, Safety relief valve, system and termination cabinet, junction box, orifice plate, instrument pre-installation calibration and other related inspection and testing which is parts of instrument systems under scope of works.
ELECTRICAL QC INSPECTOR
Company: Jubail Lines Company / PAN GULP Industrial System Co. Project: DAP Granulation Plant (Maaden Ras Al Zawr, K.S.A)
Doing related quality control works and activities for fire alarm system.
Record keeping, Preparation and generation of Quality record documentations such as required inspection check lists.
Quality Inspection, surveillance activities for all ongoing activities and issuing punch list if their some comments.
Preparation of inspection packages and raising of RIN (Request Inspection Notice).
Attending meeting and do participation in the discussion of some quality and construction related matter such as, Observations Points, Non-Compliance Report, procedures, issues and etc. NDT UT LEVEL-ll TECHNICIAN
Company: Eastern Pacific Inspection Technologies (EPI-MCECG) Project: SAUDI KAYAN EQUIPMENTS at OLAYAN DESCON Fabrication Shop and OLAYAN DESCON Plant Maintenance works.
Extensive UT weld flaw detection on pipe welds with different weld configuration and different procedure & acceptance criteria.
Responsible for extensive UT weld flaw detection and evaluation of incomplete fusion, penetration, weld inclusions, discontinuities, Crack, Laminar and etc. in the manufacturing plant and maintenance project such as corrosion monitoring activities on various plant static equipments. Such as pressure vessels, tank, steam boilers drum, air receivers and columns.
Ultrasonic weld flaw detection and evaluation using GE-Krautkramer USM35, Ainstien-ll, Epoc as per ASME Sec. V and Sec. Vlll and B31.. on Pressure vessels, pipes and plates.
Prepare and submit NDT-UT activities reports for reviews and history records.
To train and to develop the practical knowledge of our personnel (EPI-MCECG UT technician) on the field works.
E&I MECHANICAL COMPLETION ENGINEER
Company: J. Ray Mcdermott, Azerbaijan
Project: Bp/AIOC Platform Drilling Quarters (CA, WA & EA) Central Azeri PDQ, West Azeri PDQ, East Azeri PDQ.
Location: Baku, Azerbaijan
Assigned in the mechanical completion instrument group to do inspection, to involve in the testing and to ensure the recording of MC-ITR (Mechanical Completion Inspection and Test Record) of assigned full sub-systems.
Making and submitting the Mechanical Completion ITR of instruments, telecom cable, Cable check sheet-index, Instrument installation, Actuated Valve installation, Pressure safety relief valves, UCP, System and Termination Cabinets, Instrument and Telecom Junction Boxes, Orifices/ flow elements inspection, Instrument pre-installation calibrations, Fire and Gas devices installation, CCTV Cameras, Telephone outlet, Fiber optic cable, Public address speaker and Flashing beacon, External Telephone, Antenna & Feeder cables and etc. refer and check to applicable drawings, data sheets, area classification instrument check list, test procedure and preservation method.
To ensure the attaching of MC As-built mark-up drawings if, and to clear-out all inspection and testing listed in the ITR‘s index of assigned sub-system.
Surveillance, monitoring and Supervision of construction group with their activities, submittal of found technical query such as Engineering query, materials, progress and seen punch list items.
Drawings and documents reviews.
Preparation of Mechanical Completion Hand-over Dossier Packages for electrical and instrumentation.
Attending tri-party walk-thru for mechanical completion handover and certification prior to pre- commissioning.
Doing As-built works by gathering information at MC and PC As-built marked up and the actual field situation, Cross review the different drawings and cross-check to SEQ, SI, CCN file records for stamping and the signing of the drawings accordingly and stamped as ready for Back drafting and final.
Keeping and up-dating of department file/Record of As-built sequence query number sent to off-shore field personnel for some construction clarifications.
Monitoring and updating of drawing register list with regarding to the drawing As-built status. INSTRUMENT FOREMAN:
Company: KDS/TAE-LIM
Project: NGL-4 Project, Dukhan, Qatar
Assigned to handle groups of personnel for primary cabling and latter for secondary cabling.
To make sure the organized activities and the cleaned arrangement of cables.
Utilize or to secure a personal copy of cable list, all lay out drawings and documents that must be up- dated and mark-up every time for every cable pulled as work progress monitoring and references for the evaluations of works and activities progress.
Over all in-charges for the utilized Foremen and their group, hauling group, flagmen, group handling the both end of cable.
To do some initiatives/motivations, to monitor and to assure that the accomplishment is with-in the timetable or work schedule.
Do the coordination to the supervisor of other departments and others company for the works related required coordination.
INSTRUMENT SUPERVISOR:
Company: Hitachi Zosen Corporation
Project: AK-3, MSF Desalination Project, Al Khobar KSA
Attending daily meeting with the department, do progress reporting, works related issues and etc.
Doing Cable drum scheduling and reviews of engineering material quantity take-off as per department advice.
Evaluation and reviews of materials, designed drawings, other raised technical and construction issues.
Doing necessary coordination to other departments in some cases.
Cross reviews of all relevant drawings/documents, drawing modification as technicality required.
Monitoring of work activities, equivalent days delayed for Recovery Plan requirements and evaluation.
Approval of Purchase Material Request Release and monitoring the availability of materials from the updated Material Control Schedule List for incoming and ongoing activities for preparation and project material controls.
Monitoring and technical supervision for shop Pre-installation calibration, progress and required priority instruments to calibrate.
INSTRUMENT SUPERVISOR
Company: Mitsubishi Kakoki Kaisa
Project: Samad- DOP Project, Jubail KSA
Supervision, Monitoring and progress evaluation during construction period.
Material quantity take-off and making some drawings details as per department advise.
Utilize and to provide a personal copy of all documents and drawings references for every work activities and to mark-up for progress monitoring.
Evaluation, cross-review and verification for the materials, designed drawings, documents and etc.
Supervision and close-out signature for the CCN (construction changes notice) of the contractors.
Supervision, Control and witnessing the pre-commissioning group activities.
Member of (DOP Plant) Start-up task team.
SERVICE ENGINEER:
Company: HANCO MAINTENANCE DEVISION
Location: Dammam, KSA
Team-leader to group of maintenance personnel.
Implementation and monitoring for the preventive maintenance works.
Doing technical analysis and recomendation in working-out to some problems in the controls and operation of HVAC system, Motors and pumps, Plumbing System, Automatic Door System, Fire Fighting System, Switchboards, Lighting system and some other electrical equipment and devices. DCS INSTRUMENT TECHNICIAN:
Company: Honey well Al-Turki Arabia Ltd.; Jubail KSA Project: Up-Grading of VCM Petro-Kemya Control System
Functional testing for complex and non-complex loop of HONEYWELL TDC 3000 and EMERGENCY SHUTDOWN SYSTEM (ESD Triconex).
Functional testing of ANNUCTIATOR SYSTEM (Pan-Alarm) reconfiguring of sequence cards with accordance to the instrument loop diagram and the necessary sequence.
Functional testing and recalibration of interfaces OPTO-ISOLATOR, ZENER BARRIER for analogue and GALVANIC ISOLATOR for digital system.
Hot-cutover works of the keep alive loops during preparation for shutdown prior for total changing of VCM Petrokemya control system.
JUNIOR QUALITY CONTROL ENGINEER:
Company: Equipment Engineering Corporation, Phil.
Doing inspection as per ITP, other approved references such as Drawing, WPS, and applicable international standards.
Doing material receiving inspection, required relevant documents reviews and records.
Layout and cutting inspection.
Edge preparation and Fit-up inspection.
Welding inspection such as surveillance, witness and hold point inspection to see that WPS and normal practice applied and follows.
Coordinating to NDT for required test, witnessing test and test report reviews.
Visual and Dimensional inspection.
Hydro test and Air leak Test.
Witnessing PWHT and record reviews.
Painting and Coating inspection including surface preparation, sand blasting, abrasive, paints, application, visual and final DFT.