Engineer Office

Location:
Brooklyn, NY
Posted:
July 02, 2018

Contact this candidate

Resume:

Ehab Hanna

*** ****** ******

Brooklyn, NY *****

Tel: 718-***-****

E-Mail: *******@*****.***

Objective:

To obtain a position as Office Engineer / Assistant Resident Engineer

Education:

Bachelor Degree in Civil Engineer, 2002

ACI (American Concrete Institute )

DDC Concrete Certification

OSHA 10 Hour Certification

Confined space training

Water Main Inspection Certification

Experience:

Office Engineer /Assistant Resident Engineer, HDR, INC November, 2007 – February, 2018

NYC-EDC-Project (190014) –Office Engineer

Reconstruction of Springfield Gardens, Construction Cost 51.3 Million

The New York City Departments of Environmental Protection (DEP) and Transportation (DOT) broke ground on the fourth phase of a comprehensive water and sewer infrastructure upgrade project that will help alleviate chronic roadway flooding in Springfield Gardens, Queens. The $51 million project includes the installation of 84 catch basins, approximately 2.8 miles of new sewer lines, nearly 3 miles of water mains and new streets and sidewalks. The project, which will be managed by the City’s Economic Development Corporation (EDC), will also include the creation of a Bluebelt, a wetland that both stores and treats storm water runoff. Using green infrastructure principles, stormwater will be collected in the newly installed catch basins and discharged into wetlands where the water will be naturally filtered.

NYC, DDC Project (SEQ2004), Construction cost $6.9 million-Office Engineer

Installation of Storm and Sanitary sewer

The Contract calls for replacing the existing 8” and 12” water main also storm and sanitary sewer,

prepared partial payment to compensate the contractor for work completed.

NYC, DDC Project (HWQP168), Construction cost $7.4 million- Office Engineer

Reconstruction of 47th Avenue, Queens

Queens Community Board 2 requested that the work on this project to be completed off hours as to minimize the impact to the eight schools in the area. In addition, the economic impact to the business community may be devastating if the project were not done on off hours. Additionally, if the project were to be completed during weekday/daytime hours, the heavy volume of traffic from the Queens Borough Bridge could be greatly impacted, possibly causing severe traffic backups into Manhattan. I prepared all change orders to compensate the contractor on a time and material basis for the differential costs associated with installation of 8”, 12” and 20” water mains, sewers and highway work during nights and weekends in lieu of weekday work, prepared all requirements as built and close out document.

NYC, DDC Project (QED1004), Construction cost $2.8 million-Office Engineer

Replacement of distribution water main in Queens, Bronx and Manhattan

The Contract calls for replacing existing 8”- 20” water main. Prepared partial payment to compensate

the contractor for work completed.

NYC, DDC Project (MED-596), Construction cost $60 million-Office Engineer

Installation of trunk water main in Hudson Street, Manhattan

I prepared the weekly progress meeting presentation and weekly progress meeting minutes, also I

developed transmittal and submittal logs to track 24”-48” trunk water main certification and documents approval such as welding certification, fabrication drawings and geometric drawings

I draw In-service sheet, Field cards and tap cards for the distribution water main

Office Engineer/Assistant Resident Engineer,RBA Group, February, 2004 – November, 2007

NYC, DDC Project (HWX421B1), Construction cost $21 million

Reconstruction of Streets in Throgs Neck Area, phase II, Bronx

The project scope of work includes replacing the existing (8”- 20”) water main including 65

hydrants, replacing the existing (12”- 48”) combined sewer and 20” D.I.P sanitary sewer,

installing 160 new catch basins including chutes were connected to a new combined sewer line,

Installing new sidewalk, curb line and road restoration, replace street light and traffic signal

for over 56 blocks.

I prepared all contract documents. This included water main field cards, in service sheets,

fixed assets, tap cards as per NYC- DEP specifications. I prepared the as built work for sewer

including inventory for replacing Orangeburg pipe sewer house connection.

I prepared sidewalk assessment cards and excavation calculations for a new elevation.

I arranged progress meeting and writing the minutes of meeting. I prepared the contract payment

and performed calculations for $6.5 million of change orders and overrun items,

Assisted the Resident Engineer to reviewing the curb cut-sheet for over 700 properties

In addition, field inspection for the above mention scope of work.

NYC, DDC Project (QED-988), Construction cost $3.5 million-Office Engineer

Water Main Extensions Distribution for New Building in Queens, Manhattan and Bronx

The Contract calls for replacing existing 8”- 20” water main and connecting new water services

to new buildings, also milling and placement of asphaltic concrete overlay curb to curb

I prepared all close out documentation and performed calculations for change orders and overrun.

Construction inspections, Municipal testing Laboratory September, 2002 - February, 2004

DEP Water Pollution Control Plant (Bowery Bay & Hunts Point)

Supervisory and monitoring field-testing for concrete, soil and asphalt

Concrete inspection (ASTM C1064 –C172-C14 -C138-C231-C173-C31)

Batch plant concrete inspection (ASTM D75-C33-C136 )

Soil inspection (ASTM C702-D698) and soil compaction

Asphalt inspection (ASTM D692- D5581-D6926) and asphalt compaction

Computer Skills:

Microsoft office 2017 – Visio 2017 - Sap2000 – AutoCAD 2002



Contact this candidate