RAY A. BELTRAN Cell 281-***-****) Email:************@*****.***
Education
Civil Engineering, University of Houston Vocational Drafting, Houston Technical Institute
Houston, Texas. 1976-1978 Houston, Texas. 1974
Summary of Experience: Highly motivated,well organized,resourceful and proactive individual with 30 years of experience in structural steel design and drafting for offshore and onshore projects. Experienced in various (CAD) computer-aided drafting software systems, including PDMS, Draft, Triton, Intergraph, and AutoCAD Release 2015.Good people person who works well with everyone. Problem solver on multi-phase projects with the ability to foresee and mitigate installation and fabrication problems during design phase.
OIL FIELD DEVELOPMENT ENGINEERING, LLC Oct. 2006 – present
Lead Structural Designer/Structural Design Supervisor
Drafting Supervisor and Team Leader at OFD responsible for all modeling and drawing production for various projects using PDMS and AutoCad 2017. Responsible for initial job estimates of manhours required and schedule and deliverables for proposals. Always work on the production side as well as checking for every project. Skilled in use of 2D and 3D PDMS usage and AutoCad drawing.
Leviathan PRMP Feed, Offshore Israel – 87 meter Jacket and Deck Main Steel.
Walter Oil & Gas Field Development, Coelacanth Project,Ewing Bank 834 - 1189 foot Jacket Main Steel and Appurtenances.
Tamar Gas Field Development, Offshore Israel - Structural design of 778 foot Jacket Main Steel and Appurtenances.
Castor Underground Gas Storage Development, Offshore Spain - Quarters & Utlilities Platform Jacket & Decks.
Texas Offshore Oil Port Project, High Island Blk 130-A -Platform Jacket & Decks.
Helix Noonan & Danny Project, East Cameron Blk 381-A - 446’ W.D. revamp of topsides deck for Drilling and Production Platform.
Helix Producer I Project, FPU K5000- Topsides Modules on Floating Production Unit.
AKERKVAERNER – Jan 2002 to Oct 2006 Designer/Team Leader
Served as Team Leader at AkerKaverner, participated in all modeling and drawing production for various PDMS projects. Proven leader received letter for superior job White Rose project.
Exxon Mobile ALNG Project, Gravity Based Structure- Built topsides modules using PDMS.
AMKC White Rose Project Newfoundland, FPSO- Coordinated with piping and interfaced with other disciplines to streamline checking procedures and increased pipe support drawing production by 400%.
Exxon Mobile Sable Island Project, Compression Deck- Produced model and drawings.
Kaeverner Enercon, Jan 2001 – Jan 2002
Team Leader at Enercon, participated in all modeling and drawing production for first time
PDMS project at Enercon. Responsible for training new designers in PDMS in order to carry out
project. Co-ordination of schedule and personnel as well as interface with other disciplines.
Samedan Mari-B Field Development Offshore Israel- Design Coordinator-worked on drawings for
773’ W.D. Jacket and topsides deck for Drilling and Production Platform.
Brown & Root Energy Services – Aug 1997 to Jan 2001 Designer/Team Leader
Nov 99 – Jan 2001 Brown & Root Energy Services., Pemex Cantarell EPC-22 Platform Bay of
Campeche Mexico, Lead Structural Designer/Checker.
Aug 98 – Nov99 Brown & Root Energy Services., Malampaya Platform Palawan Island,Philippines
Responsible for assembling and leading a team of designers both local and from UK office to finish the
project in Singapore. Primary steel done in US finished all secondary steel model and drawings overseas.
Aug 97 – Aug98 Brown & Root Energy Services., Exxon Sable Island Nova Scotia Gas Complex
Feb 97 - Aug 97 Mcdermott Engineering Co.
Texaco-Petronius Tower, Viosca Knoll Blk. 786-Operator/Designer/Checker.
Feb 92 - Feb 97 Shell Oil Co.,
Ursa - Tension Leg Platform Mississippi Canyon Blk 809-PDMS modeling and drawing production
8 - Leg Jacket, Main Pass Block "252" Gulf of Mexico- PDMS modeling and drawing production
Ram-Powell - Tension Leg Platform, Viosca Knoll Blk. 956 – PDMS modeling and drawing production
Mars - Tension Leg Platform, Mississippi Canyon Blk.807- PDMS modeling and drawing production
China Orient 8 - Leg Pecten, Drilling and Production Platform . PDMS modeling and drawing production
Apr 91 - Feb 92 Shell Oil Co., Auger - Tension Leg Platform, Gulf of Mexico Garden Banks
Nov 90 - Apr 91 Hudson Engineering Co., Marathon Oil - Drilling & Production Platform
Jan 90 - Nov 90 Shell Oil Co., Auger - Tension Leg Platform, Gulf of Mexico Garden Banks
May 87 - Jan 90 McDermott, Kaneka Texas Corp. Chemical Plant Expansion Project
CAD Operator/Senior Draftsman
Responsible for design and drafting of foundation and steel detail drawings for plant expansion.
Duties included taking field measurements at plant for pipe racks and foundations for access platforms.
4 - Pile Drilling and Production Jacket, Walter Oil & Gas Corporation –
Jan 87 - May 87 Milam Design, Manitex Inc. McAllen Texas, - Mechanical Designer
Responsibilities included layouts and wellment drawings for cranes. Also prepared schematics of
valves, winches, engine and hydraulic equipment for cranes.
Jan 80 - July 86 Brown & Root Inc. – Designer
Worked on several offshore projects on the board.
Worked in the CAD department on flowsheets for an Exxon project cogeneration power plant,
in California.
Worked on foundation and steel detail drawings for Nacosa Edward Pulp and Paper Plant Ashdown
Arkansas, and Amerada Hess Petro-Chem Plant, Abudabi.