MECHANICAL ENGINEER

Over 25 years of experience as a Mechanical Project Engineer

Experience in the design and construction of process and mechanical systems for offshore oil and gas platforms and onshore terminal and petrochemical facilities; construction management experience

Well experienced in offshore platform retrofits/modifications and knowledge of ASME B31.3 and B31.8, API, and NFPA codes

Experience:

Dec. 2016 to Present Syncom Space Services- Mississippi

Pressure Vessel Systems Engineer (for Stennis Space Center)

Responsible for Pressure Vessel Systems (PVS) Program at NASA's Stennis Space Center.

Responsible for PVS certification packages, including engineering evaluations, process plans, and provisional recertification documents.

Walk-downs in field of vessels of piping at complex test storage areas for updating P&ID’s.

Directed group for piping designers for the development of drawings and P&ID’s.

API and ASME B31.1 and B31.3 specifications.

Worked on Acoustic Emission Testing project of a 200,000 gallon Liquid Hydrogen vessel, including development of design review documents, material list, statement of work, cost estimate, and review of design engineering checklist.

Worked on calculations for sizing of relief valves and pressure vessel thicknesses.

Feb. 2016 to Nov. 2016 Taylor & Hill – Houston, TX

Reliability Engineer (for BP Texas City Chemicals)

Working on maintenance projects, including operation and capital projects, and efficient refinery operations.

Provide design work and supervision for MOC’s for improvements of all mechanical equipment. Development of RCFA’s for fixed and rotating equipment and parts. Tracking schedule and costs using SAP software.

Provide technical support for the design of piping and structural packages and checking of P&ID’s.

Review of project scope with inspectors and other technical groups for the development of solutions for repairing rotating equipment and piping corrosion (CUI), painting and coatings.

Monitor contractor activity for progress and quality on engineering and construction projects.

Involved in HAZOP evaluations for different units throughout the plant.

Provides project controls oversight on assigned projects for expenditures, schedule and scope attainment.

2012 to Jan. 2016 Engineering and Inspection Services, LLC – Metairie, LA

Maintenance Engineer (for Valero Meraux Refinery

Working on maintenance and capital projects, providing technical expertise to maintain and enhance safe, profitable, and efficient refinery operations.

Provide design work and supervision to see that Engineering Work Orders and MOC’s or other assignments are completed accurately and efficiently. Worked using SAP software. Jobs ranging from $1M to $5MM.

Provide technical support for the design of piping packages and checking of P&ID’s.

Provide design, repair and procurement of heat exchangers, piping, pressure vessels and PRV sizing, selection and design in accordance with applicable API and ASME codes and standards.

• Design of nozzles reinforcement saddles and reinforcement of branch piping.

Review of project scope with reliability department, inspectors and other technical groups for the development of solutions for repairing rotating equipment and piping corrosion, painting and coatings.

Monitor contractor activity for progress and quality on engineering and construction projects.

Provide risk assessment and options with complex managers.

Update and maintains work list and status information on assigned Engineering Work Requests and AFE’s

Involved in PSSR’s meetings and HAZOP evaluation.

Provides project controls oversight on assigned projects for expenditures, schedule and scope attainment.

2009 to 2012 Stolthaven New Orleans L.L.C. – Braithwaite, LA

Terminal Engineer

Terminal Engineer responsible for the design of construction projects throughout the terminal, including detailed engineering, procurement, construction and start-up..

Development of scope of works and final IFC documentation packages, including updates to P&ID’s. Also responsible for the development of project cost estimates for the renovations within the plant facility.

Project engineer for $50 million Phase 5 expansion, which includes the installation of 23 storage tanks, associated pumps and piping, new truck and rail racks, expansion of our existing dock 3, marine manifolds areas, etc. Duties includes managing the design drafting department, construction coordinator on site, procurement, scheduling, mechanical, civil and electrical construction contractors.

Bids evaluations and awarding contracts to construction contractors.

Project coordinator of equipment MOC’s, coordination with all departments for approval of MOC’s, performing PSSR’s with other departments, dealing with constructability issues, etc.

Work with safety and environmental departments to ensure safety during construction jobs and environmental permits, etc.

2005 to 2009 IV-AGA Engineering (formerly known as Albert-Garaudy & Assoc) – Metairie, LA

Lead Project Design Engineer

Mechanical Project Lead Engineer responsible for the coordination and design of large and small capital projects at petrochemical refineries and gas processing facilities. Work included the technical field walk-thru and upgrade of existing P&ID’s, modifications of pipe routing and the diverging of gas, the installation of new pig launchers and receivers, and the development of final IFC documentation packages. Also responsible for the development of project cost estimates for the renovation of plant facilities, including client and contractor interface, and procurement of equipment and valves/piping materials.

Project Manager/Mechanical Project Engineer on multi-discipline construction projects, managing the mechanical engineering group, and providing informed support to a staff of mechanical engineers, designers and draftspersons. Work included from the initial scope of work, issuing construction drawings, to the final As-Built drawings.

Mechanical Project Engineer responsible for the renovation of existing firewater system, including the hydraulic analysis of piping systems, line sizing calculations based on the existing firewater pumps, coordination and layout of piping design with senior designers, and the development of piping construction isometrics, and the layout of fire monitors and sprinkler systems in accordance with NFPA 13.

Design and construction of topsides facility renovations of 6 platforms. Modifications included pipeline tie-ins, new pigging facilities, fuel gas systems, flare system, and piping systems. Work included preparing specifications, construction drawings, bid packages, quotation analysis for purchase, and construction and renovations of refinery facilities.

Mechanical lead on the development of mechanical deliverables, including construction piping isometrics and drawings, horizontal diesel storage vessels, pipe support details, and interfacing with structural and electrical disciplines. Work included engineering / field work, construction drawings, and equipment specifications

Leadership with the coordination of company personnel, including interface with mechanical designers and project management group.

Providing design and technical support for the development of process flow diagrams and instrumentation.

Developing and updating the General Arrangement drawings for offshore productions platforms.

Preparation of procurement packages, including bill of materials for piping, valves, equipment, pressure vessels, heat exchangers and pumps; and also bid evaluations.

Development of summary lists, including piping line list, valve list, piping tie-in list, and equipment lists.

2002 to 2005 WINK, INCORPORATED – New Orleans, LA

Project Design Engineer

Developing and revising of PFD’s and P & ID’s for Marathon Oil for their light products and asphalt terminal facilities located throughout the south-eastern part of the U.S. Project budget. Engineering project budgets ranges from $50M to $100M.

Direction supervision of Auto-CADD designers and working with engineering support staff in design of complete engineering construction packages.

Pump sizing and selection; and pump specification sheets.

Developing equipment and material cost estimates; bid forms and scope of work.

Preparation of schedules and budgets for construction and engineering.

Working with project manager, tracking man-hours and schedule milestones

Design of the renovation of piping in a compressor unit, revising the piping and structural steel for the removal of the compressor units.

Developing and revising P & ID’s, construction piping drawings and isometrics, structural steel renovations.

Design engineering of complete construction packages for unit turn-around, including tie-in point packages, scope of work and schedules, equipment and piping specifications.

Walk-downs of PSV’s of the entire plant, for new PSV sizing and calculations to be replace during turn-around.

Developed work scopes for implementation of new piping and equipment, and start-up support services.

Updating mechanical design and construction specifications.

1991 to 2002 LANIER & ASSOCIATES – New Orleans, LA

Project Design Engineer

Design engineering for mechanical projects for marine dockside and refinery facilities. Dock layout of equipment and piping systems, from pipe rack tie-ins onshore to the entire dockside platform, including loading arms and hose rack layout and construction.

Development of material and equipment specifications

P & ID review development and checking, including participation in refinery HAZOP meetings.

Piping design and layout, including developing piping isometrics and material take-offs.

Pump sizing and selection and pump specifications sheets.

Valve sizing and selection as per client’s specifications for purchase and installation

Vent systems, including design, sizing and selection of pressure relief valves (PSV’s).

Pressure Vessel design and specifications data sheets

Firewater piping systems design and layout of sprinkler systems, and familiar with NFPA codes

Performed hydraulic piping analysis, including pipe stress, pipe size and wall thickness calculations

Managing capital and expenses for projects from inception to start-up, tracking man-hours and schedule for entire project for all disciplines.

1984 to 1991 LOUISIANA GAS SERVICE COMPANY - Harvey, LA

Measurement Engineer

Responsible for the engineering design and construction for pipeline jobs, including the renovation of natural gas metering and regulatory stations.

Working with S.C.A.D.A. controls systems, regulating natural gas pipeline pressures and flow rates

Maintaining monthly and quarterly odorant reports for town border and farm gate stations.

Organizing and planning of natural gas volume sales to industrial customers.

Calculations of natural gas flow rates, volumes, and line sizing.

Analyzing pipelines variance reports of town border regulatory stations

Education: UNIVERSITY OF NEW ORLEANS - New Orleans, LA.

Bachelor of Science in Mechanical Engineering. Graduated Aug. 1983

E.I.T. - December 1983 (State of LA Reg. No. 9614)

HOLY CROSS HIGH SCHOOL - New Orleans, LA.

Graduated May 1978 - top 10% in class

Member of American Society of Mechanical Engineers

References: Available upon request



Contact this candidate