CESAR JESUS HERRERA CASTILLO
Venezuelan. Date of birth: 01-01-1965
Petroleum Engineer
Sector Tipuro. Urb Villa Jardín, Nº Z-20-N• Maturín, Monagas State, Venezuela • **********@*****.***, **********@*****.*** (0058) 291-***-****(home) • (0058) 424-***-**** (mobil)
CAREER PROFILE
Petroleum Engineer with 26 years of experience Oil-Gas Production and Exploration. Experience Drilling, completion Engineering, managing integrated down hole-surface development projects, construction wells, horizontal and multilaterals wells with real time data re-drill infil drilling, Well interventions, Workover, completion, stimulations, abandonments and reservoir in heavy oil crude, gas reservoir (Faja Petrolífera del Orinoco), Technical FEL(VCD) and Technical Limited and offshore wells in Venezuela, Mexico Gulf(Drilling Deep) and San Jorge geological structure in Argentina.
1)Drilling Engineering
2)Workover (completion) Engineering
3)Reservoir Engineering
Highly qualified and professional team leader for technical activities.
Expertise in Drilling, Completions and Reservoir Engineering, Heavy Oil process simulation, stimulation.
Continuous training and focus on Integrate Productivity Methodology.
Speak Spanish, English (Advanced).
TECHNICAL HIGHLIGHTS AND ACCOMPLISHMENTS
Design and development competency profiles in the execution of drilling activities, completion and repair and maintenance of wells for Lakach, Ayatsil- Tekel and Tsimin-XUX project. For Pemex- Mexico.
Sr Drilling Engineer like Real Time Operations Leader in Gulf of Mexico by Halliburton –Pemex.
Sr Drilling Engineer in U.N Repsol Venezuela. Carabobo project (Repsol-Petronas-Indian Company and PDVSA) (heavy oil field)..Designer in Stratigraphic, Slant and Development horizontal wells in Cluster.
FEL and Technical limited for development project in Argentina s fields Drilling Designer Engineer.
Construction and repair Engineering Wells in Gulf of Mexico Cantarell field.
Technical application FEL and Technical limit for Explorations and Development wells.
Integration of productivity solutions for Oil & Gas Business (Integral method of Productivity) Well designer construction, Drilling and reentry designer, Completation designer Coiled Tubing, Cementing, Logging) and relined completion in horizontal wells.
Open Hole Gravel packing design and execution in heavy oil and unconsolidated sands. Tubing string design, Optimize Well Delivery Program, Completion Design Options and Program preparation, Intervention Design and Options Program preparation, Completion/Intervention Fluid Design Options and Program preparation, Abandonment Design and Options Program preparation Well Control Equipment and Execute Well Control Operations, Well Completion Operations execution, Well Interventions and Abandonment Operations execution, Completion and Well Intervention Units and Equipment selection.
Coordination of move rig, bullet annual of operations, economical evaluations. Optimization of processes, focused un maximizing asset production capacity and productivity
Computer Applications:
Landmark-Halliburton (Compass, stresscheck, Wellplan, CasingSeat, WellCat, Presgraf, DIMS, Open Wells, Well Cost. Schulemberger Software (Eclipse-100, span, cemcade, fraccade), Windows (MS Excel, Word, Power Point, Project). Pansystem. PDVSA. (OFM, MAEP (Economical Evaluations), Centinela
EXPERIENCE
Oilfield Group, (Petroindependencia) Venezuela
Consultor Drilling Engineer (Nov – Dec 2015)
Technical Limited, FEL (VCD), Designer Well planning
C.V.E. Villahermosa. Mexico
Drilling Engineer Specialist. September 2014- March 2015
Execution Profiler Development Drilling and completion of wells for SDCA, Projects Tsimin-Xux, Ayatsil-Tekel, Lakach
• Technical coordination specialty drilling, completion, repair and maintenance of wells, terrestrial, marine shallow water and deep water.
• Information gathering support for processes, threads, and implementing powers drilling, completion and workover
Pemex, (Landmark) México
Consultor Senior Drilling Designer Engineer (June 2013- December 2013)
Real Time Operations Leader in exploration Wells in Cuenca Sur Marina Field, Carmen City Campeche state. México
Repsol Venezuela
Senior Drilling Engineer (January 2009-June-2013) Stratigraphic, Slant and Development Horizontal Wells campaign Carabobo Field heavy Oil (Faja Petrolifera del Orinoco, Workove Designer Campaign in Quirquire field.
Puerto La Cruz, Anzoátegui state. Venezuela
Pemex, (Landmark) México
Consultor Senior Drilling Designer Engineer (September- December 2008)
No conventional wells designer, Carmen City Campeche state. México
Repsol YPF, (Landmark) Argentina
Consultor Senior Drilling Designer Engineer (June 2007-Sept 2008)
Comodoro Rivadavia, Chubut state. Argentina
Pemex, (Landmark) México
Consultor Senior Drilling Designer Engineer (January-June 2007 )
Villahermosa Tabasco state. México
Pemex, (Landmark) México
Consultor Senior Workover Engineer (September – December 2006 )
Completion and Repair wells, Carmen City Campeche state. México
Pemex, (Comesa) México
Consultor Drilling Engineer (March – July 2006)
Technical Limited, FEL (VCD), Designer Well planning. Exploration wells, Villahermosa, Tabasco state. México
PLUSPETROL, Venezuela
Consultor Drilling Engineer (November 2005 to March 2006)
Designer Well planning. Exploration wells, Tiznado and Barbacoas Block. Guarico state Venezuela
ORIFUELS SINOVEN, S.A MorichaL, Venezuela
SENIOR Drilling Engineer supervisor in heavy oil Crude (May -November-2005)
Designer and Well planning and supervisor Horizontal wells, Water Injection wells, Cerro Negro Field. Monagas State.Venezuela
SMS C.A Maturín, Venezuela
Senior Drilling Engineer Consultant (Jun-Oct. 2004)
Designer and Well planning. Horizontal wells, directional wells to Quiriquire Somero Field. REPSOL
PDVSA &P, Maturín, Venezuela
Senior Reservoir Engineer Heavy oil crude (8 -12 API) in Traditional Areas and Faja Petrolifera del Orinoco (Mar. 1998 – Dec. 2.002)
Reservoir management, other skills, include pressure transient analysis, reserves calculations, log correlation, material balance calculations and horizontal well drainage area, production/pressure behavior, production geology. These experiences include development projects (including well planning, well tests, pressure testes, etc) and have had experience in integration of geological and reservoir engineering data in unconsolidated sands.
Lagoven S.A Filial of PDVSA
Completion and Workover Engineer Coordinator Heavy oil crude (8 -12 API) in Traditional Areas and Faja Petrolifera del Orinoco ( Mar 1997-Mar-1998)
Ra/Rc with Rig and without Rig, Fracturing, Stimulation, Wire Lines, Coiled Tubing, WellVac Sand vac, gravel pack, steam injection in unconsolidated sands and heavy oil
Lagoven S.A Filial of PDVSA
Workover Engineer/ OPERATIONS ENGINEER (Jun. 1994 – Mar1997)
Wells completion, Coiled Tubing, Cementing, Cased and Open hole logging, Production Operations, Wire line & Slick line operations, Sand Control, Formation Damage Control, Gravel Pack in open hole. Water control, Schedule Rig. Well services. Workover, Gravel Packing. Sand oil Squeeze. Cementing, acidizing treatment, packers setting, casing shooting designer, cased and open holes logging. well service programming, production control, tours programming Stimulation
Lagoven S.A Filial of PDVSA
Junior Drilling Engineer Heavy oil crude in Traditional Areas and Faja Petrolifera del Orinoco (Dec 1990 Jun. 1994)
Casing design, well planning. Vertical and Horizontal wells, reentry horizontal wells, multibranch wells abilities: engineer studies, field development planning. Running casing cementing, logging, MWD/LWD. Jobs performed for Lagoven S.A Filial of PDVSA.
EGEP Consultores
Engineer Assistant (August December 1990)
Dación Field (CORPOVEN) study and optimization.
EDUCATION
Master Degree, Integrate Productivity Methodology, CIED PDVSA, Venezuela (2000-2001)
Integrated Training program in Oil Production Engineering, PDVSA, Venezuela (1999).
Petroleum Engineer, Universidad Central de Venezuela, (1984-1991).
TRAINING
March-2011
Training:
Avanced Economics Oil Industry projects. Pto. La Cruz. Venezuela.
Oct-2010
Training:
Risk Analysis In Drilling s Project. Madrid- Spain.
Dec-2009
Training:
Permisology Workings and Danger Atmosphere. Maturín.
Oct-2009
Training:
Wellplan. Landmark Pto La Cruz. Venezuela.
March -2009
Training:
Well Control. IWC. Caracas Venezuela.
March -2007
Training:
Wellcat Landmark. Pto La Cruz – Venezuela.
Dec-2002
Training:
Well stimulation: practical and applied. ogci training . Houston texas USA.
Nov-2002
Training:
English V Level. Cied. San Tomé. Venezuela.
Aug-2002
Training:
Control and reduction of water produced with oil and gas. Esp oil. Maracaibo. Venezuela.
May-2002
Training:
English nivel iv. Cied. San Tomé. Venezuela.
Aug-2001-Jun-2002
Master
Master Degree Well Productivity Integrated. Cied San Tomé. Venezuela
Oct 2001
Training:
Sand Control. Oil & gas Consultants Internacional. Houston texas. USA
Jun-2001
Training:
Risk Analysis and decision with uncertain. Cied. Maturín. Venezuela.
May-2001
Training:
Well testing. Cied. Puerto La Cruz. Venezuela.
May-2001
Training:
Pressure well testing Analysis (pansystem) Cied. Pto la cruz. Venezuela
Feb-2001
Training:
Advances in well construction. Halliburton. Mérida. Venezuela.
Oct-1999 Jun-2000
Training:
Integrate Programme for Reservoir (PIA) Cied San Tome
Jun-2000
Training:
English III y IV Level.Cied. San Tome.
March -2000
Training:
Reservoirwith Horizontal Wells. Cied. San Tomé. Venezuela.
Nov-1998
Training:
Oilfield manager basic. Cied. Caracas. Venezuela.
Oct-1998
Training:
Finder basic, management. Cied. Puerto La Cruz. Venezuela.
May-1998
Training:
Completion design for new wells. Rike service. New Orleans, USA.
Jan-1998
Training:
Completation Design for Horizontal Wells . Intevep. Los Teques Venezuela.
March -1997
Training:
Reservoir Management. Cied. Morichal. Venezuela.
Feb-1997
Training:
Reservoir Engineering. Cied. Puerto La Cruz. Venezuela.
Aug-1996
Training:
Certificate of completion.baker oil tools. Anaco. Venezuela.
Jan-1996
Training:
Actualizar datos de producción. Llagoven.. Maturín. Venezuela.
Sep-1995
Training:
System wims 2.3/dos. Lagoven. Maturín. Venezuela.
Nov-1994
Training:
Stadistics and proccess. Cepet Maturín. Venezuela.
Jun-1994
Training:
Stuck pipe prevention. Randy Smith drilling schools. Quiriquire. Venezuela
April-1994
Training:
Blowout Prevention and well control. Cepet. Anaco. Venezuela.
Jul-1993
Training:
Horizontal Drilling. Cepet. Tamare. Venezuela.
Jun-1993
Training:
Problems Analysis and task decision. Cepet. Quiriquire. Venezuela.
March -1993
Training:
Well mud avanced training 2000, sesión I. Baroid. Maturín. Venezuela.
Feb-1993
Training:
Works methods and Anylisis. Cepet. Quiriquire. Venezuela.
Oct-1992
Training:
Drilling, Engineering. Phase V. Cepet. Anaco. Venezuela.
Sep-1992
Training:
Directional Drilling. Cepet. Cabimas. Venezuela.
Jul.-1992
Training:
Logging wells and Formation evaluation. Cepet. Maracaibo. Venezuela.
Jun-1992
Training:
Prevention and well control. Cepet. Anaco. Venezuela.
April-Jun-1992
Training:
English I to III level. cepet. Maturín. Venezuela.
Jan 1992
Training:
Defensive Driving. Lagoven. Maturín. Venezuela.
Jan-1992
Training:
Well heads.Vetco gray. Maturín. Venezuela.
PUBLICATIONS
Testing non disperse mud for Horizontal Wells Drilling in South of Monagas State. II seflu. Caracas feb. 1992.
Experience in horizontal drilling in non consolidated sands in eastern Venezuela. XIII Colaper. 1992 Argentina.
Experience in Horizontals Wells in Souths Monagas State. svip 1994. Pto La Cruz. Venezuela
State of the Art in Horizontal Wells in South of Monagas State. svip 1997.Maturin
State of the Art in Horizontal Wells Drilling . Bogota. 1998.