Ravinder Kumar Chauhan
***********@*****.*** (Best way to reach)
+971-********* (UAE)
Experience Summary
More than 14 years of experience in Telecom domain on RF, specifically for Trunk Radio System (TETRA) with Barakah Nuclear power Plant (BNPP), Romaila Operating Organization (ROO), African Mineral (AML), Commonwealth Games(CWG), Delhi Metro Rail Corporation(DMRC) & BSNL.
Working as Telecom Engineer for ATLAS Security in Abu Dhabi, UAE. Responsible for TETRA Radio designing for ENEC, working across a number of Network designing functions to deliver seamless services to the end users.
Worked as Team Leader & Sr. TETRA Engineer for Romaila Oilfield Radio Network in Basra, Iraq. Responsible for Network Operations center (NOC) working across a number of Network Operations job related functions to deliver seamless services to the end users.
Worked as a Network operation controller and Lead Radio Expert in African mineral’s IT department. Support AML (African Minerals Ltd) Network Operations center to identify, troubleshoot, repair and maintain Ceragon microwave backbone and Motorola trunk radio system equipment.
Responsible for scheduling all type of Field maintenance (Corrective, Preventive, & Reactive) to ensure the maximum Network availability to End user Business.
Optimized network performance in terms of Coverage, capacity issues, antenna orientations, frequency reuse & Monitoring KPI.
Executing pre sales, post sales activity, Tender & Bid work, inviting the Quotation from different suppliers. Evaluation of EOI, PQQ & Tender documentation.
Manage up to date Bid program, collate methodologies, detailed BOM, Project Plans and design plans.
Planning, Designing & providing the RF coverage for IBS/DAS in Black spot areas / Dark areas.
Providing the Technical & User friendly training to the Client.
Operation and maintenance of the entire MOTOTRBO Repeater sites, MTS & EBTS sites for Trunk Radio System (TRS).
Implementation, testing & maintenance of Motorola Train Borne Radio, Hand portable Radio.
Handled the successful execution of Installation Test Procedure, Partial Acceptance Test (PAT), F.A.T (Factory Acceptance Test) and System Acceptance Test (SAT) with customer execution of internal test with all subcontractors.
Looking to project related activities at circle & cluster level.
Successfully done Survey/installation/commissioning/testing/acceptance of Base station (MTS)/ Dispatcher
Work according to multiple requirements in a high growth multitasking environment.
Documentation of Technical site survey & Final Design,Site survey reports.
Material Management & Client Management.
Technical Skills /Tools
AIRBUS BTS (TB3), MOTOROLA BTS (GSM)/ EBTS ( TETRA )/ MTS ( TETRA), MOTOTRBO, ALCATEL BTS, Cobham/ Axell Wireless (OMU & RU).
VSWR, Return Loss, DTF using BIRD / ANRITSU Site Master.
Indoor & Outdoor Coverage testing by ANRITSU Spectrum/ Vector Analyzer.
MS Office, Windows OS, VISIO & AUTOCAD.
Project Management, Change Management, Risk analysis, FCAPS, Material Management & Client Management
Professional Experience
Employer
ATLAS SECURITY, Abu Dhabi (UAE)
Project
BARAKA NUCLEAR POWER PLANT (BNPP)
Period
July, 2016 To till Date.
Designation
Telecom Engineer
Roles & Responsibilities
Working & finalizing the TETRA Radio Network Conceptual design, High level design (HLD), Detailed design (LLD), Fiber Detailed design (SLD), Cable block diagram (CBD) with client.
Final Design and implementation of the radio network including infrastructure, subscribers, and transmission backhaul.
Pre and Post Radio coverage testing for the Indoor/Outdoor.
System level acceptance testing with client.
Preparation of system fleetmap, encryption and radio programming templates
Working on TETRA Radio Network Detailed BOQ for BNPP.
Meeting the client for understanding the requirements.
Meeting with OEM & service provider for finalizing the design requirements, managing subcontractors and 3rd party resources.
Preparing the Complete system documentation & design documents as per the Client standards.
Carry out the site survey.
Customer presentations and System staging.
Employer
American International Radio (AIR),Turkey, Istanbul / IL(USA)
Project
Romaila Operating Organization (ROO)
Period
February, 2015 To June, 2016.
Designation
Team Leader / Sr. TETRA Engineer
Roles & Responsibilities
Directed operations to meet client requirements and served as a key contributor in defining vision and strategy of IT on the program.
Managing day-to-day operations of the team, vendor management, customer expectation, project dependencies and communicating and coordinating of all aspects (technical and managerial).
Provided project management financial reporting, status reporting related to project milestones, schedule and cost variance, deliverable, project team dependencies, risks and issues and communicated across the program.
Exceptional collaboration, teamwork, influence and relationship-building skills at all levels with internal and external groups such as Operations, System Engineering, Architecture, PMO, Contracts, Finance and other project leads.
Responsible for planning, delivery, resource requirements, change management, risk management, scope, schedule, financial, budget and timeline following SDLC – RUP/Agile project management methodology for requirements gathering, design, implementation, test, deployment and maintenance.
Worked with senior management, operation users and stakeholders to define requirement, provide IT as a service and lead organizational changes to meet business goals/vision, meet customer expectations and improve customer satisfaction.
Acting as the 2nd line support for TETRA system problems reported.
Providing consultancy on new design and add-on to the TETRA system.
Providing technical support for the problems that may occur in the system and meeting the SLTs on the resolution time. Meeting the SLT’s and coordinating activities accordingly.
Working on RF study for ROO concession, Fleetmap, IBS designs for optimizing the network
Daily monitoring and providing solutions to problems related with TETRA system proactively.
Organizing the trainings to be delivered to local team members.
Comprehensive reporting of the activities for Performance, Change & Incident management for different periods.
Employer
Nutek Hongkong Ltd. Hongkong
Project
African Minerals Lts(AML)
Period
April, 2013 To Jan, 2015.
Designation
Team Lead/ System & Network Engineer
Roles & Responsibilities
Responsible for the planning, organization, execution, development and maintenance for all IT functions.
Responsible for business requirements gathering and worked with vendor resources on product development
Responsible for identifying and recommending IT solutions to meet business objectives, prioritizing projects and activities, managing project financials, building and managing relationships across IT and the business and communicating with management in both the business and IT on the overall status of projects.
Working as a Network operation controller and Lead Radio Expert in African mineral’s IT department.
Responsible for Network Operations center (NOC) working across a number of Network Operations job related functions to deliver seamless services to the end users.
Support AML (African Minerals Ltd) Network Operations center to identifies, troubleshoots repairs and maintains Ceragon microwave backbone and Motorola trunk radio system equipment.
Monitor OMCR operations & different functions for closure of TT / WO.
Handling project activities involving working out various requirements with respect to utilities, equipments, manpower & monitoring overall project operations
Organized meeting to reduce outages and planned to make robust bandwidth.
Looked after transmission NMS activities & Accounted for performance monitoring and network auditing.
Responsible for scheduling all type of Field maintenance (Corrective, Preventive, & Reactive) to ensure the maximum Network availability to AML Business.
Carried out performance monitoring and network auditing of MW network through NMS System.
Responsible of compiling all types of Network Reports and daily check list to provide to the AML business on timely basis.
Responsible for all type of changes in the network after approval from Country IT head till their final executions with minimum impact to the business.
Organization
Autometer Alliance limited – Noida, India
Period
Jan, 2013 To April, 2013.
Designation
Middle Manager - Cadre (R&D)
Roles & Responsibilities
Managed major procurement initiatives including organizing RFP processes, detailing technical requirements of contracts, developing documentation (i.e., Scope of Work and Staff Summary), selection committees, and evaluating vendor submissions.
Coordinate with stakeholders and vendors to gather information for project planning and design.
Runs Project from design, development, configuration and implementation
Keep track of client network's life cycle.
Identify and defines requirements & resources for project; manage time and cost to ensure project deliverables and goals are meet; keep track of project progress.
Coordinate with client and vendors on resource schedule, implementation plan, risk mitigation and contingency planning.
Executed the tender & bid work for DMRC Phase 3 for PAS, PIDS & Master Clock. It includes Design part for the Tender, BOQ for the same and inviting the Quotation from different suppliers.
Evaluation of EOI, PQQ & Tender documentation.
Manage up to date Bid program, collate methodologies, detailed BOM, Project Plans and design plans.
Minimize the bid exposure to avoid risk.
Organization
Commonwealth Games(CWG-2010) Project / MOTOROLA India Pvt. Ltd. / through Collabera Technology Pvt. Ltd.
Period
1st April 2012 To 18th Jan 2013
Designation
Senior Engineer, Projects
Roles & Responsibilities
Executing work on the design and implementation of Secured Communication Network (TETRA) for Indian Common Wealth Games (CWG) 2010 & DMRC Radio Communication System (TETRA) On DMRC Projects (Radio & Transmission networks).
Managed & guide in-house team for project completion
Had meeting with stakeholders/ vendors/ management.
Designing, Implementing & Testing of DAS for In-building coverage at Police stations, Court & other Govt. Buildings.
Implementation, testing & maintenance of MTM 800, MTM 800e, Train Borne Radio, Hand portable MTP 850 wirelesses Radio, MTS (Motorola TETRA Site).
Successfully done Survey/installation/commissioning/testing/acceptance of Base Station(MTS)/Dispatcher
Supervision of Onsite (indoor & outdoor) installation /commissioning of new sites, Stadiums, Hospitals, Vehicles.
Documentation of Technical site survey, Final Design, prepares site survey reports & BOQ for the same.
Material Management & Client Management.
Successfully execute and delivered of Installation/commissioning, Test Procedure, Partial Acceptance Test (PAT), FAT(Factory Acceptance Test), System acceptance test(SAT)
Organization
Commonwealth Games(CWG-2010) Project & Delhi Metro Rail Corporation Phase – II Project / MOTOROLA India Pvt. Ltd. / through Bonsai Networks India Pvt. Ltd.
Period
1st July 2009 To 31st March 2012
Designation
Senior Engineer, Projects
Roles & Responsibilities
During this period, initially handled DMRC Phase 2 project and then move to CWG- 2010 project.
Executed design and implementation of Secured TETRA Communication Network (GRN) for Indian Common Wealth Games (CWG) 2010 & DMRC Radio Communication System (TETRA) On DMRC Phase II Project (Tetra Radio networks).
Implementation, testing & maintenance of MTM 800, MTM 800e, Train Borne Radio, Hand portable MTP 850 wirelesses Radio, MTS (Motorola TETRA Site).
Successfully done Survey/installation/commissioning/testing/acceptance of Base Station (MTS)/ Dispatcher
Supervision of Onsite (indoor & outdoor) installation /commissioning of new sites, Stadiums, Hospitals, Vehicles.
Documentation of Technical site survey, Final Design, Site survey reports & BOQ for the same.
Material Management & Client Management.
Successfully execute and delivered of Installation/commissioning, Test Procedure, Partial Acceptance Test (PAT), FAT(Factory Acceptance Test), System acceptance test(SAT)
Organization
Delhi Metro Rail Corporation Phase - II Project / MOTOROLA India Pvt. Ltd. / through Janus iSolutions Pvt. Ltd.
Period
8th Dec 2008 To 30th June 2009
Designation
Project Engineer
Roles & Responsibilities
Executed Design and implementation of DMRC Radio Communication System (TETRA) On DMRC Phase II Project (Radio & Transmission networks).
Conducted a risk evaluation for implementation of controls / measures to prevent risks and contingency planning. Reliability, availability, maintainability and safety analysis (RAMS).
Implementation, testing & maintenance of MTM 800, MTM 800e, Train Borne Radio, Hand portable MTP 850 wirelesses Radio, MTS (Motorola TETRA Site).
Successfully done Survey/installation/commissioning/testing/acceptance of
Base Station (MTS)/Dispatcher.
Supervision of Onsite (indoor & outdoor) installation /commissioning of new sites.
Documentation of Technical site survey, Final Design, Site survey reports & BOQ for the same.
Material Management & Client Management.
Successfully execute and delivery of Installation/commissioning, Test Procedure, Partial Acceptance Test (PAT), FAT(Factory Acceptance Test), System acceptance test(SAT)
Organization
Delhi Metro Rail Corporation (DMRC) Phase – I Project / SIEMENS Ltd. / through Nutek India Limited
Period
Aug-2005 To Nov 2008.
Designation
System Engineer
Roles & Responsibilities
Executed work on the design and implementation of DMRC Radio Communication System (TETRA), FOTS Transmission System in SIEMENS Ltd. on DMRC Phase 1 (Line 3 & Dwarka Sub City) Project.
Implementation, testing & maintenance of Motorola MTM 700 Train Borne Radio, Hand portable MTP 750 wirelesses Radio.
Supervision of indoor & outdoor installation of new sites (Motorola EBTS)
Designing, Implementing & Testing of DAS for In-building coverage at black spot areas for Metro stations.
Optimized network performance in terms of Coverage, capacity issues, antenna orientations and frequency reuse.
Handled the successful execution of Installation Test Procedure, Partial Acceptance Test (PAT) and System Acceptance Test (SAT) with customer execution of internal test with all subcontractors.
Work according to multiple requirements in a high growth multitasking environment.
Documentation of Technical site survey & Final Design, preparation of site survey reports.
Material Management & Client Management.
Organization
IComm Tele Ltd. ( BSNL GSM Projects)
Period
July-2004 to Aug-2005.
Designation
Project Team leader
Roles & Responsibilities
Clients Management & Vendor Management.
Technical site survey (TSS) of new sites.
Supervision of new sites installation, expansion of existing sites, which includes installation of Alcatel BTS (Evolium), NORTEL BTS (12K, 8K), Transmission SDH Rack & Power plant installation .
Acceptance of BTS, Battery Bank, Power Plant.
VSWR measurements of feeder using BIRD Site Master & troubleshoot the same.
Education Summary
• MBA (Marketing) From Sikkim Manipal University, India: 2009
• Bachelor of Engineering (B.E) in Electronics & Communication: MDU, Haryana (India): 2004