Post Job Free

Resume

Sign in

Power Plant Mechanical

Location:
Baywood-Los Osos, CA, 93402
Posted:
March 28, 2018

Contact this candidate

Resume:

Maytham Al Defaaei

ac4yob@r.postjobfree.com cell: 805-***-****

Profile:

Motivated, . Talent for quickly adapting to project requirements and dealing with complex situations; completed contract for GE LM 6000 Turbines in Iraq. Diplomatic with professionals and non- professionals at all levels. Accustomed to working in sensitive environments. Demonstrated ability to produce accurate and timely results, and meeting stringent contractual and assurance guidelines. Additional abilities include the capability to act as a professional translator; providing professional and essential linguistic, business . Flexible and versatile – able to work and maintain operations in a variety of situations and under pressure. Competent and demonstrated ability to easily transcend cultural differences in foreign locations. Successful in deadline-driven environments. Quality safety awareness and team- building Education:

Institute of Management \ Al Rusafa\ Baghdad Department of warehouse management \ Logistics

Skills

• Team Leadership

• Safety Training & Team Building

• Lead Mechanical for Plant of LM6000 Gas Turbines installation. • Professional Interpreting Skills in Arabic & English.

. Languages

Type to enter text

Maytham Al Defaaei

ac4yob@r.postjobfree.com cell: 805-***-****

• Arabic (native speaker)

• English (advanced)

. Professional Experienc

Lead Mechanical for Power Plant Project in Iraq consisting of 10 General Electric LM 6000 .

Deliver series of Safety Training classes for team members; education in all areas of safety

including use of proper equipment and

techniques to avoid injury.

Interpreter with the ability to communicate project requirements to skilled and unskilled team

members using layman’s terms to facilitate

understanding.

Adaptable to varied contractual, project, client, vendor, and location situations .

MATERIALS MANAGEMENT – RESPONSIBLE FOR ALL MATERIALS ISSUED TO CONTRACTORS &

SUBCONTRACTORS WORKING ON THE LARGEST SOLAR PLANT IN THE WORLD. ALSO EXPERIENCED IN LOADING & UNLOADING MATERIALS & SUPPLIES; USING FORKLIFTS & PALLET JACKS; IN ADDITION RESPONSIBLE FOR ALL REQUIRED PAPERWORK & INVENTORY FOR LOGISTICS AT THIS PLANT AND INVENTORY ASSISTANCE AT THE LANCASTER, CA SOLAR PLANT.

Maytham Al Defaaei

ac4yob@r.postjobfree.com cell: 805-***-****

Employment History

. CLP resources- April 2016 To Jun 20117.

First solar-Cal Flats-Logistics Coordinator [ 50-70 hours a week ]. CLP resources- September 2014 To

April 2015.

First Solar-Lost Hills-Logistics second chair

[40-450hours a week ].

CLP RESOURCES- SEPTEMBER 2012 TO AUGUST 2014

FIRST SOLAR-TOPAZ SOLAR FARM-LOGISTICS GROUP-SECURE LAY DOWN YARD . [40-450HOURS A WEEK ]

SEARS REPAIR SERVICES-[ FULL TIME]

-Cycle Small Engine Technician – Odenton, MD; May 2011 to November 2011

Duties include repairing parts in two-cycle small engines at the Sears Repairs Services Center. WAMAR INTERNATIONAL – [RESIDENT ]

. Mechanical inauguration and Arabic English Interpreter at Camp Garry Owens, Amarah, South of Baghdad; 2008 to May 2010. Duties include direct supervision of 6 Iraqi Nationals on the inspection of 25 Diesel Generators on CGO’s and outer JSS; Chilot, Amarah, Shaheen, Omssa, Yomen, Alsheeb, Sparrow Hawk 1 & 2.

PIONEER INC. – [FULL TIME ]

Safety Manager & Buyer Al Mullah Power Plant in Kirkuk Iraq; July 2008 Provided safety management and training; purchased and assigned necessary parts/equipment to appropriate areas.

January to June 2008

Maytham Al Defaaei

ac4yob@r.postjobfree.com cell: 805-***-****

. Mechanical supervisor for Pioneer Company in Al-Mussaib Power Plant in Iraq [ full time ]. The project consisted of 10 General Electric LM 6000 .

Lead Mechanical supervisor – Al Quds, Iraq; May 2007 to 2008 [full time ]. Lead mechanical and supervisor, and directed technicians and contractor support staff during the refurbishment of General Electric LM 6000’s Gas Turbines at Al-Quds Power Plant. Iraq.

S&W ENERGY –

Lead Mechanical & suppervision – Al Quds, Iraq; March 2007 [50-60 hours a week ]. Emergency, time sensitive project including the removal and replacement at Al-Quds power plant due to non- operational Frame Units. The entire removal and replacement took less than one week, ensuing in the Units placed online and base loaded.

STIS –

Lead Mechanical and supervision, April 2006 to November 2006 [ 50-60 hours a week ]. Completed installation 3 General Electric Units. SOUTHEAST TEXAS INDUSTRIAL SERVICES – Mechanical Team Leader

– Al Mussaib Project, Al Mussaib, Iraq; April 2004 to March 2006 [50-60 hours a week ]. My team and I completed the installation of 10 new GE LM6000 Gas Turbine/Generators.ABU KLAAM CO. – Baghdad Abu klaam CO,- Baghdad

Superintendent – Al Mussaib Project, Al Mussaib, Iraq; May 2000 to March 2004 50-70 hours a week]. Project included supervisory responsibilities for the erection of High Towers, platform and gates at the Al Mussaib project site. Maytham Al Defaaei

ac4yob@r.postjobfree.com cell: 805-***-****



Contact this candidate